JAPAN ATOMIC INDUSTRIAL FORUM, INC.

for Japanese

ATOMS in JAPAN

18 May, 2018

Draft of Revised Strategic Energy Plan Aims for Firm Implementation of 2030 Energy Mix, Eyeing 2050 As Well

On May 16, the Strategic Policy Committee, under Japan’s Advisory Committee for Natural Resources and Energy presented a draft of the revised Strategic Energy Plan for discussion. The committee is chaired by Masahiro Sakane, councilor of Komatsu Ltd.

Masahiro Sakane

The draft includes the goal of realizing an energy mix for Japan by 2030 based on the current plan issued in 2014, along with a long-term scenario toward 2050 reflecting global warming issues and the depletion of fossil-fuel resources. The nation’s composition of power sources in 2030 is set at 22-24% for renewable,20-22% for nuclear, 27% for LNG, 26% for coal, and 3% for oil.

The draft recognizes the importance of the energy mix in 2030, saying it is “an outlook of appropriate probability, based on the comprehensive consideration of existing infrastructure, technology and human resources.” Given, however, that significant time has already passed, it notes further that policies on individual energy sources will be probed deeply and strengthened with the aim of “certain implementation.”

Positioning nuclear power as “an important base-load power source contributing to the stability of the long-term energy supply-and-demand structure,” the draft clearly states that necessary measures will be steadily carried out to achieve nuclear power’s share of 20 to 22 percent in the 2030 energy mix.

Among the various policy commitments toward 2030, the draft includes the item of “rebuilding nuclear policy,” with details included for such activities as Fukushima reconstruction and restoration, sustainable safety improvements, the creation of stable business environments, and efforts to resolve back-end issues.

Toward 2050, the draft embraces an aggressive, omnidirectional approach—that is to say, pursuing all options—to achieving a so-called “energy shift” and realizing a low-carbon society, given that technological innovation, combined with political and social changes in the years to come, make it difficult to present an outlook with any certainty.

It also says that a scientific review mechanism will be created to map out scenarios. Many committee members called for the development of the mechanism as soon as possible, with cooperation with the international community.

After further revisions of the draft are made, based on discussions among the committee members at the meeting, a revised draft of the next Strategic Energy Plan will be made available to the public for comments. A final draft is expected this summer.

Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.

SNS facebooktwitter

NPPs Map

Video

Grossi on Fukushima: Marking a Decade Since the Accident

10 March, 2021
Grossi on Fukushima: Marking a Decade Since the Accident04:11

Recent News

21 October, 2021
Kishida Makes First Visit to Fukushima Since Becoming Prime Minister
15 October, 2021
LDP Adds SMR Development and Nuclear Fusion to NPP Restarts in Its Policy Manifesto
7 October, 2021
Kishida Administration Inaugurated, with New METI Minister Hagiuda Holding Press Conference on Taking Office
6 October, 2021
IAEA Holds 65th General Conference in Vienna, with Japanese Minister of State for Science and Technology Delivering Statement in the General Debate
30 September, 2021
JAEC Releases 2020 White Paper on Nuclear Energy
17 September, 2021
NRA Permits Shimane-2 under New Regulatory Standards
14 September, 2021
IAEA Deputy Director General Evrard Visits Japan in Advance of Safety Review of ALPS-treated Water
1 September, 2021
Evaluation Report Issued by IAEA’s Review Mission to Fukushima Daiichi: First Visit since 2018
24 August, 2021
METI and IAEA Agree on Further Review Missions to Fukushima Daiichi
4 August, 2021
JAEA Restarts High-Temperature Engineering Test Reactor “HTTR”
2 August, 2021
Information about Fukushima Daiichi NPS Water Treatment
28 July, 2021
METI’s Committee Shows Rough Draft of Next Strategic Energy Plan
2 July, 2021
Mihama-3 Restarted After Decade-long Hiatus: First Restart in Japan of a Reactor Operating Beyond 40 Years
28 June, 2021
Mihama-3 Restarts after Decade-long Hiatus
25 June, 2021
New Canada-Japan Partnership Supports Greater Collaboration to Meet Climate Change Objectives and Net-zero Goals
24 June, 2021
METI Issues New Green Growth Strategy Through Achieving Carbon Neutrality
16 June, 2021
ANRE Sticks to “S+3E”
16 June, 2021
Japanese Cabinet Approves Environmental White Paper 2021
16 June, 2021
LDP Parliamentary Association to Reconfirm Position on Utilization of Nuclear Power
16 June, 2021
Fukui Governor Concerned about Deletion of Reference to “Maximum Utilization” of Nuclear Power
▲TOP