JAPAN ATOMIC INDUSTRIAL FORUM, INC.

for Japanese

ATOMS in JAPAN

6 October, 2017

JAEC Explains Japan’s Utilization of Plutonium to the Country and the World

On October 3, the Japan Atomic Energy Commission (JAEC) released a document entitled "Utilization of Plutonium in Japan," explaining the country's use of the substance through the reprocessing of spent fuel generated from nuclear power. An English version of the report will be made and issued, and presented to the International Atomic Energy Agency (IAEA).

JAEC Chairman Yoshiaki Oka

The document was drawn up and issued publicly out of the need to further explain appropriately the Japanese government’s policy on managing plutonium, given increasing international concerns over such management and the desire to see a reduction in the substance’s quantities. For the sake of ensuring the plutonium balance, the document reiterates that Japan will stick to its policy of not possessing plutonium without a specific purpose.

The document first looks back at Japan’s energy situation, nuclear power, and the history of plutonium use based on the country’s nuclear fuel cycle policy. It also talks about research on commercial reprocessing, the commissioning of spent-fuel reprocessing to the UK and France, and the use of uranium-plutonium mixed oxide fuel (MOX fuel) in ordinary light-water reactors (LWRs).

The document makes clear that Japan has consistently adhered to a policy of not possessing plutonium without a specific purpose, and that its peaceful use is ensured to a high degree by the strict implementation of IAEA safeguards and the like.

As for prospects for the future, it maintains that the plutonium balance will be ensured. Although completion of the JNFL’s Rokkasho Reprocessing Plant and the JNFL MOX Fuel Fabrication Plant (J-MOX) may be delayed, there will be no large time gap between the completion of the two facilities, and the plutonium stockpile will not continue increasing. Japan’s target of reducing the stockpile will be achieved in the long term, it says.

Recognizing that information on Japan’s plutonium policy must be disseminated domestically and internationally in an easily understood manner, JAEC Chairman Yoshiaki Oka expressed his view that nuclear fuel cycle businesses involve long-time spans, and are the activities of the private sector. “We should wait and see how it progresses,” he said.

Comment

SNS facebooktwitter

NPPs Map

Video

“The current situation at Fukushima Daiichi NPS” -From 3.11 toward the future- (ver, Jan. 2018)

15 January, 2018
“The current situation at Fukushima Daiichi NPS” -From 3.11 toward the future- (ver, Jan. 2018)08:23

Recent News

15 January, 2018
ANRE Head Meets Niigata Governor on Kashiwazaki Kariwa, Delivers Document from METI Minister
11 January, 2018
JAIF Chairman Imai Calls Upon Domestic Nuclear Industry to Strengthen Cooperation Through Concerted Efforts
5 January, 2018
Toshiba ESS, IRID Develop Device to Investigate Interior of Primary Containment Vessel at Fukushima Daiichi-2 NPP
27 December, 2017
Kashiwazaki Kariwa 6 & 7 Clear Safety Examinations, First BWRs
21 December, 2017
16 Teams Compete in Second Hairo Sozo Robot Contest in Naraha Town
12 December, 2017
JAEA Officially Classifies Monju Fast Reactor as “Closed Down”
12 December, 2017
Seven-point Contraction in Nuclear Share of Energy Mix Would Push Real GDP Down by 2.5 to 2.7 Trillion Yen
28 November, 2017
Fukui Governor Agrees to Restart Ohi-3 and Ohi-4 NPPs, with Local Procedures Complete
28 November, 2017
JAPC Files Application for Permission to Extend Lifetime of Tokai-2 NPP to 60 Years
13 November, 2017
EU to Lift Restrictions on Imports of Fukushima Products in December
▲TOP