JAPAN ATOMIC INDUSTRIAL FORUM, INC.

for Japanese

4 December, 2013

Solution to Contaminated Water

12:37

Recent media reports have drawn attention to the issue of contaminated water at the Fukushima Daiichi Nuclear Power Plants of the Tokyo Electric Power Company, Tepco. At the site, strenuous efforts toward decommissioning are being made. In order to store the 400 tons of contaminated water being generated every day, Tepco is under great pressure to build a huge number of additional tanks, conduct maintenance, and patrol the site.
What is this contaminated water? What can be done with the increasing volume of it?
Focusing on the contaminated-water issue, JaifTV looks for a solution.

Comment

SNS facebooktwitter

Recent Videos

The Next Step -Towards Fukushima’s Future,Together-8 March, 2018
The Next Step -Towards Fukushima’s Future,Together-
Welcome Home, Fukushima8 February, 2018
Welcome Home, Fukushima
Fuel Handling Machine: TRAINING2 February, 2018
Fuel Handling Machine: TRAINING
Fuel Handling Machine (FHM)2 February, 2018
Fuel Handling Machine (FHM)
“The current situation at Fukushima Daiichi NPS” -From 3.11 toward the future- (ver, Jan. 2018)15 January, 2018
“The current situation at Fukushima Daiichi NPS” -From 3.11 toward the future- (ver, Jan. 2018)
A New Chapter Begins.1 September, 2017
A New Chapter Begins.
Bridging the Past and Present Toward the Future11 April, 2017
Bridging the Past and Present Toward the Future
An unprecedented challenge: Developing the “Scorpion-shaped robot”16 February, 2017
An unprecedented challenge: Developing the “Scorpion-shaped robot”
Fukushima Today24 January, 2017
Fukushima Today
JAIF President’s Message at 2017 UC Pacific Rim Forum23 January, 2017
JAIF President’s Message at 2017 UC Pacific Rim Forum
▲TOP