JAPAN ATOMIC INDUSTRIAL FORUM, INC.

for Japanese

ATOMS in JAPAN

13 February, 2017

Kagoshima Experts’ Committee Confirms Sendai-1 Inspection Results

On February 7, Kagoshima Prefecture held the second meeting of its committee of experts addressing safety and other matters at the Sendai-1 (PWR, 890MWe), owned and operated by the Kyushu Electric Power Co. The unit is located in Satsumasendai City in the western part of the prefecture along the East China Sea coast.

Sendai-1 NPP

Kyushu Electric Power stressed the safety of the Sendai-1, saying that no abnormalities had been found during a periodic inspection, and had asked the experts for their understanding. The committee accepted the results of the special and periodic inspections.

After the meeting, committee chairman Hiroki Miyamachi, professor of seismology and volcanic physics at the Graduate School of Science and Engineering in Kagoshima University, said that he wanted the committee to incorporate its earlier discussions into its recommendation to Kagoshima Governor Satoshi Mitazono, to be presented later this month, by February 18.

The meeting was the last to be held before the end of fiscal year 2016 (which ends on March 31, 2017). The assembled experts, studying the results of a disaster-prevention drill for a hypothetical nuclear accident held on January 28 by the prefecture and others, considered whether any aspects needed improvement.

Prior to the meeting, Chairman Miyamachi explained that his committee would not make any conclusions about the safety of the Sendai-1 itself, but would report on what it had discussed for Governor Mitazono to consider. The governor, who had asked the committee to evaluate the inspections, had expressed his intent to then make his “own judgment” based on the committee’s discussions.

The governor was elected last July having promised to establish such an experts’ committee. Having selected twelve members from such fields as nuclear power and seismology, he directed them to hold their first meeting two months ago, in December 2016.

Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.

SNS facebooktwitter

NPPs Map

Video

“The current situation at Fukushima Daiichi NPS” -From 3.11 toward the future- (ver, July 2019)

8 July, 2019
“The current situation at Fukushima Daiichi NPS” -From 3.11 toward the future- (ver, July 2019)09:17

Recent News

15 November, 2019
JAEA Holds Public Meeting, Discusses Future Vision, Fukushima Reconstruction and Revitalization
15 November, 2019
IAEA/RCA Symposium: Cooperating with Developing Countries Through Nuclear Science and Technology
8 November, 2019
EU to Ease Restrictions on Japanese Food Imports, Though Chief Cabinet Secretary Suga Asserts Japan Will Work Toward Their Full Elimination
28 October, 2019
OCCTO’s Electricity Supply and Outlook for Winter Sees Capacity Reserve Margin of 3 Percent Nationwide
23 October, 2019
Symposium with Students Held in Tsuruga City on Future Research and Test Reactors
17 October, 2019
JAIF Holds Women’s Symposium, with Presentations by Weathercaster and Professor
7 October, 2019
Fukushima Joban Products Fair Begins, Featuring Seafood Sent Directly to Restaurants in Tokyo-Yokohama Area
3 October, 2019
Kindai University, Hayakawa Rubber Develop Easily-molded Radiation Shielding Material
30 September, 2019
MEXT Minister Shares His Hopes with the Press, Seeking to Secure Human Resources Together with Universities
19 September, 2019
Minister of State for Science and Technology Policy Attends Opening Ceremony of Japan Booth at IAEA General Conference
▲TOP