JAPAN ATOMIC INDUSTRIAL FORUM, INC.

for Japanese

Onagawa-2

Current StatusOutage since 2010-11-06
Applications for Restart2013-12-27
Age:23

BWR  825MWe (gross)
          796MWe (net)

Owner:  

Operator:

Date of order:
1989
Construction Start:
1989-08
Concrete placing:
1991-04
Initial Criticality:
1994-11-02
Grid connection:
1994-12-23
Commercial Operation:
1995-07-28
Main contractor:
Toshiba
Architect Engineer:
Toshiba
Reactor System supplier:
Toshiba
Reactor Vessel supplier:
Toshiba/IHI
Incore Structure supplier:
Toshiba
Fuel supplier:
Toshiba/GNF-J
Steam raising supplier:
Toshiba
Turbine generator supplier:
Toshiba
Civil works:
various
2013-07-08 2013-12-27        

New Regulatory Standards came into effect

Applications by Operator

Application for Permission to Install a Reactor
(Basic design)

NRA Approval

Local Consent
(not a legal requirement)

Restart the reactor

     
Application for Approval of Construction Plan
(Detailed design based on basic design)

NRA Approval

Pre-service Inspection by NRA

Application for Approval of Operational Safety Program
(Matters regarding operations, including operational safety)

NRA Approval

SNS facebooktwitter

Video

Fukushima Daiichi Nuclear Power Station -The year in review- (March 2018 – February 2019)

8 March, 2019
Fukushima Daiichi Nuclear Power Station -The year in review- (March 2018 – February 2019)04:56

Recent News

21 May, 2019
【52nd JAIF Annual Conference】 Environmental Activist Michael Shellenberger, a Pro-nuclear Convert, Meets the Press
21 May, 2019
【52nd JAIF Annual Conference】 Leader Perspective: “The Role of Nuclear Energy in the EU Low-carbon Future”
20 May, 2019
【52nd JAIF Annual Conference】 Leader Perspective: “French Nuclear Policy and Industry Update”
20 May, 2019
【52nd JAIF Annual Conference】 Session 3: “Diversity and Possibilities for Nuclear Technology”
15 May, 2019
【52nd JAIF Annual Conference】 Session 2: “Prospects for Development of Innovative Technology”
15 May, 2019
【52nd JAIF Annual Conference】 Fukushima Daiichi Report
15 May, 2019
【52nd JAIF Annual Conference】 Session 1: “Role of Nuclear Power as a Low-Carbon Energy Source”
10 May, 2019
JT60-SA’s Core Central Solenoid Installed at QST’s Naka Fusion Institute
10 May, 2019
President of Decommissioning Company Says “Feel” from Unit 3 Will Aid Decommissioning of Other Units
10 May, 2019
Demonstration Made by MHI and IRID of Robot Arm to Remove Fuel Debris from Fukushima Daiichi
▲TOP