JAPAN ATOMIC INDUSTRIAL FORUM, INC.

for Japanese

Shika-2

Current StatusOutage since 2011-03-11
Applications for Restart2014-08-12
Age:14

ABWR  1206MWe (gross)
          1158MWe (net)

Owner:  

Operator:

Date of order:
1999
Construction Start:
1999-08-27
Concrete placing:
2001-08-20
Initial Criticality:
2005-05-26
Grid connection:
2005-07-04
Commercial Operation:
2006-03-15
Main contractor:
Hitachi
Architect Engineer:
Hitachi
Reactor System supplier:
Hitachi
Reactor Vessel supplier:
Hitachi
Incore Structure supplier:
Hitachi
Fuel supplier:
GNF-J
Steam raising supplier:
Hitachi
Turbine generator supplier:
Hitachi
Civil works:
various
2013-07-08 2014-08-12        

New Regulatory Standards came into effect

Applications by Operator

Application for Permission to Install a Reactor
(Basic design)

NRA Approval

Local Consent
(not a legal requirement)

Restart the reactor

     
Application for Approval of Construction Plan
(Detailed design based on basic design)

NRA Approval

Pre-service Inspection by NRA

Application for Approval of Operational Safety Program
(Matters regarding operations, including operational safety)

NRA Approval

SNS facebooktwitter

Video

“The current situation at Fukushima Daiichi NPS” -From 3.11 toward the future- (ver, Jan. 2020)

23 January, 2020
“The current situation at Fukushima Daiichi NPS” -From 3.11 toward the future- (ver, Jan. 2020)07:47

Recent News

7 August, 2020
Nuclear Powered Ship Mutsu Designated as Special “Ship Heritage”
3 August, 2020
On Taking Office as JAIF President
3 August, 2020
Nuclear Energy Buyers Guide in Japan 2020-21 is now available
31 July, 2020
Thoughts on the Decision to Approve Changes to the Reprocessing Business
31 July, 2020
NRA Permits JNFL to Alter Rokkasho Reprocessing Plant, Its Having Complied with New Regulatory Standards
30 June, 2020
“Existing NPPs to Enter Age of 80-Year Operations” JAIF Annual Survey Says
16 June, 2020
Toshiba ESS and Yokohama National University Boost Joint Research to Upgrade Heavy-Ion Cancer Therapy, Using Kanagawa Prefectural Facility
8 June, 2020
NRA Grants Permission to Make Changes to Reactor Installation at HTTR under New Regulatory Standards
22 May, 2020
Sendai-2 Starts Periodic Inspection, with Due Date Imminent to Install Specific Safety Facilities
15 May, 2020
NRA Issues Draft Review Report for Rokkasho Reprocessing Plant
▲TOP