Tohoku/Higashidori-1

Current StatusOutage since 2011-02-06
Applications for Restart2014-06-10
Age:15

BWR  1100MWe (gross)
          1067MWe (net)

Owner:  

Operator:

Date of order:
1999
Construction Start:
1998-12-24
Concrete placing:
2000-08
Initial Criticality:
2005-01-24
Grid connection:
2005-03-09
Commercial Operation:
2005-12-08
Main contractor:
Toshiba
Architect Engineer:
Toshiba
Reactor System supplier:
Toshiba
Reactor Vessel supplier:
Toshiba/IHI
Incore Structure supplier:
Toshiba
Fuel supplier:
GNF-J
Steam raising supplier:
Toshiba
Turbine generator supplier:
Toshiba
Civil works:
various
2013-07-08 2014-06-10        

New Regulatory Standards came into effect

Applications by Operator

Application for Permission to Install a Reactor
(Basic design)

NRA Approval

Local Consent
(not a legal requirement)

Restart the reactor

     
Application for Approval of Construction Plan
(Detailed design based on basic design)

NRA Approval

Pre-service Inspection by NRA

Application for Approval of Operational Safety Program
(Matters regarding operations, including operational safety)

NRA Approval

SNS facebooktwitter

Video

Grossi on Fukushima: Marking a Decade Since the Accident

10 March, 2021
Grossi on Fukushima: Marking a Decade Since the Accident04:11

Recent News

17 September, 2021
NRA Permits Shimane-2 under New Regulatory Standards
14 September, 2021
IAEA Deputy Director General Evrard Visits Japan in Advance of Safety Review of ALPS-treated Water
1 September, 2021
Evaluation Report Issued by IAEA’s Review Mission to Fukushima Daiichi: First Visit since 2018
24 August, 2021
METI and IAEA Agree on Further Review Missions to Fukushima Daiichi
4 August, 2021
JAEA Restarts High-Temperature Engineering Test Reactor “HTTR”
2 August, 2021
Information about Fukushima Daiichi NPS Water Treatment
28 July, 2021
METI’s Committee Shows Rough Draft of Next Strategic Energy Plan
2 July, 2021
Mihama-3 Restarted After Decade-long Hiatus: First Restart in Japan of a Reactor Operating Beyond 40 Years
28 June, 2021
Mihama-3 Restarts after Decade-long Hiatus
25 June, 2021
New Canada-Japan Partnership Supports Greater Collaboration to Meet Climate Change Objectives and Net-zero Goals
▲TOP