Tokai-2

Current StatusOutage since 2011-03-11
Applications for Restart2014-05-20
NRA's Approval for basic design2018-09-26
NRA's Approval for detailed design2018-10-18
Age:42

BWR  1100MWe (gross)
          1056MWe (net)

Owner:  

Operator:

Date of order:
1971
Construction Start:
1973-06
Concrete placing:
1973-10
Initial Criticality:
1978-1-18
Grid connection:
1978-3-13
Commercial Operation:
1978-11-28
Main contractor:
GE/Hitachi/Shimizu
Architect Engineer:
EBASCO
Reactor System supplier:
GE
Reactor Vessel supplier:
GE
Incore Structure supplier:
GE
Fuel supplier:
GE/NFI
Steam raising supplier:
GE
Turbine generator supplier:
GE
Civil works:
Shimizu/Kajima
2013-07-08 2014-05-20   2018-09-26    

New Regulatory Standards came into effect

Applications by Operator

Application for Permission to Install a Reactor
(Basic design)

NRA Approval

Local Consent
(not a legal requirement)

Restart the reactor

  2018-10-18  
Application for Approval of Construction Plan
(Detailed design based on basic design)

NRA Approval

Pre-service Inspection by NRA

Application for Approval of Operational Safety Program
(Matters regarding operations, including operational safety)

NRA Approval

SNS facebooktwitter

Video

Grossi on Fukushima: Marking a Decade Since the Accident

10 March, 2021
Grossi on Fukushima: Marking a Decade Since the Accident04:11

Recent News

15 October, 2021
LDP Adds SMR Development and Nuclear Fusion to NPP Restarts in Its Policy Manifesto
7 October, 2021
Kishida Administration Inaugurated, with New METI Minister Hagiuda Holding Press Conference on Taking Office
6 October, 2021
IAEA Holds 65th General Conference in Vienna, with Japanese Minister of State for Science and Technology Delivering Statement in the General Debate
30 September, 2021
JAEC Releases 2020 White Paper on Nuclear Energy
17 September, 2021
NRA Permits Shimane-2 under New Regulatory Standards
14 September, 2021
IAEA Deputy Director General Evrard Visits Japan in Advance of Safety Review of ALPS-treated Water
1 September, 2021
Evaluation Report Issued by IAEA’s Review Mission to Fukushima Daiichi: First Visit since 2018
24 August, 2021
METI and IAEA Agree on Further Review Missions to Fukushima Daiichi
4 August, 2021
JAEA Restarts High-Temperature Engineering Test Reactor “HTTR”
2 August, 2021
Information about Fukushima Daiichi NPS Water Treatment
▲TOP