Current StatusOutage since 2012-05-05
Applications for Restart2013-07-08
Age:11

PWR  912MWe (gross)
          866MWe (net)

Owner:  

Operator:

Date of order:
2003
Construction Start:
2003-11
Concrete placing:
2004-07-24
Initial Criticality:
2009-03-03
Grid connection:
2009-03-20
Commercial Operation:
2009-12-22
Main contractor:
MHI
Architect Engineer:
MHI
Reactor System supplier:
MHI
Reactor Vessel supplier:
MHI
Incore Structure supplier:
MHI
Fuel supplier:
MNF
Steam raising supplier:
MHI
Turbine generator supplier:
MHI
Civil works:
various
2013-07-08 2013-07-08        

New Regulatory Standards came into effect

Applications by Operator

Application for Permission to Install a Reactor
(Basic design)

NRA Approval

Local Consent
(not a legal requirement)

Restart the reactor

     
Application for Approval of Construction Plan
(Detailed design based on basic design)

NRA Approval

Pre-service Inspection by NRA

Application for Approval of Operational Safety Program
(Matters regarding operations, including operational safety)

NRA Approval

SNS facebooktwitter

Video

Grossi on Fukushima: Marking a Decade Since the Accident

10 March, 2021
Grossi on Fukushima: Marking a Decade Since the Accident04:11

Recent News

6 May, 2021
【54th JAIF Annual Conference】Session 3: “The Energy Vision Japan Needs”
4 May, 2021
【54th JAIF Annual Conference】Session 2: “Onward in the Reconstruction of Fukushima”
27 April, 2021
【54th JAIF Annual Conference】Session 1: “Global Challenges Toward a Decarbonized Society”
19 April, 2021
【54th JAIF Annual Conference】Chairman Imai Says “Continuation of Nuclear Power is Essential”
16 April, 2021
Nuclear Energy Subcommittee Hears Opinions on Technological Infrastructure from Representatives of Industry
13 April, 2021
Remarks by JAIF Chairman Imai Takashi at the 54th JAIF Annual Conference
8 April, 2021
JGC Holdings Announces Participation in SMR Development by NuScale Power in the U.S.
19 March, 2021
NRA Approves Draft Review Report on Dry Spent Fuel Storage Facility at Genkai NPPs
17 March, 2021
Nippon Foundation Surveys Young People on Decarbonization Awareness
12 March, 2021
President Kobayakawa Addresses TEPCO Employees to Mark Tenth Anniversary of Fukushima Daiichi Accident
▲TOP