JAPAN ATOMIC INDUSTRIAL FORUM, INC.

for Japanese

ATOMS in JAPAN

9 October, 2015

Reshuffled Third Abe Cabinet Inaugurated: Motoo Hayashi Heads METI

On October 7, Japan’s Prime Minister Shinzo Abe inaugurated his third cabinet after reshuffling the members. Motoo Hayashi, a member of the House of Representatives, was tapped to be the new leader of the Ministry of Economy, Trade and Industry (METI). He previously had served as the chairman of the National Public Safety Commission, as well as the minister of state for Okinawa, Northern Territories Affairs, and Disaster under Prime Minister Yasuo Fukuda in 2008.

New METI Minister Hayashi

At a press conference upon arriving at METI for the first time after assuming office, Minister Hayashi repeated that there would be “no recovery of Japan without reconstruction of Fukushima.” He expressed his determination to accelerate the Fukushima effort and to attempt to support the decommissioning of the Fukushima Daiichi Nuclear Power Plants, the premise of reconstruction.

Regarding the Ikata-3 NPP, owned and operated by Shikoku Electric Power Co., and where responses to the local community are in the final stage toward the resumption of operation, Hayashi said that he wanted to visit the plant “at the appropriate time” in coordination with the governor and other related parties.

A visit to the Ikata-3 was part of the eight-item request to the national government on safety measures made by the governor of Ehime Prefecture. The previous METI Minister Miyazawa had replied in writing on September 11 that he “would coordinate his visit for the appropriate time.”

On the subject of high-level radioactive waste (HLW) disposal, the new METI minister said that the waste issue “exists independently” of NPP restarts, and that “in any case, we will work on a resolution during our generation.”Minister Hayashi at METI

Meanwhile, in response to a question on the selection of HLW disposal sites, he said that there was “no schedule,” indicating his intention to listen carefully to the opinions of local communities at each stage of the surveying to be carried out. He also said that the construction of new NPPs was “not being contemplated at this stage.”

Another fresh face in the reshuffled Abe Cabinet is Tsuyoshi Takagi, member of the House of Representatives from Fukui Prefecture, who became reconstruction minister. At a press conference at the prime minister’s official residence in Tokyo, he said it was “no exaggeration” that he had lived with nuclear power for 40 or 50 years.

He went on to stress that the accident at the Fukushima Daiichi NPPs “must be taken seriously,” adding that next year (2016)—the fifth year since the giant earthquake that struck northeast Japan—would be a “critical juncture.”

As for the reconstruction of the various prefectures in the region, he said that he hoped that Miyagi and Iwate Prefectures would soon be entering “the second stage,” while “Fukushima unfortunately has not come that far.” Takagi said that it was his intention to strive for reconstruction measures that matched the needs of each region.

Ms. Tamayo MarukawaAt another press conference at the official residence, Tamayo Marukawa, a member of the House of Councillors and the newly-appointed environmental minister and minister of state for nuclear emergency preparedness, spoke of her commitment to “give my all” on the Fukushima reconstruction challenges of decontamination, waste treatment and residents’ health management.

She also referred to the upcoming COP21 (to be held in Paris from November 30 to December 11), and said that Japan should take the lead on global warming measures.

Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.

SNS facebooktwitter

NPPs Map

Video

“The current situation at Fukushima Daiichi NPS” -From 3.11 toward the future- (ver, Jan. 2020)

23 January, 2020
“The current situation at Fukushima Daiichi NPS” -From 3.11 toward the future- (ver, Jan. 2020)07:47

Recent News

3 August, 2020
On Taking Office as JAIF President
3 August, 2020
Nuclear Energy Buyers Guide in Japan 2020-21 is now available
31 July, 2020
Thoughts on the Decision to Approve Changes to the Reprocessing Business
31 July, 2020
NRA Permits JNFL to Alter Rokkasho Reprocessing Plant, Its Having Complied with New Regulatory Standards
30 June, 2020
“Existing NPPs to Enter Age of 80-Year Operations” JAIF Annual Survey Says
16 June, 2020
Toshiba ESS and Yokohama National University Boost Joint Research to Upgrade Heavy-Ion Cancer Therapy, Using Kanagawa Prefectural Facility
8 June, 2020
NRA Grants Permission to Make Changes to Reactor Installation at HTTR under New Regulatory Standards
22 May, 2020
Sendai-2 Starts Periodic Inspection, with Due Date Imminent to Install Specific Safety Facilities
15 May, 2020
NRA Issues Draft Review Report for Rokkasho Reprocessing Plant
30 April, 2020
Construction Begins of Next Generation Synchrotron Radiation Facility at Tohoku University, to Be Used for Fuel Cells and Pharmaceuticals
▲TOP