{"id":1141,"date":"2015-06-04T00:00:46","date_gmt":"2015-06-04T00:00:46","guid":{"rendered":"http:\/\/www.jaif.or.jp\/en\/?p=1141"},"modified":"2015-06-04T00:18:50","modified_gmt":"2015-06-04T00:18:50","slug":"transfer-of-nuclear-fuel-completed-at-fukushima-daiichi-unit-5","status":"publish","type":"post","link":"https:\/\/www.jaif.or.jp\/en\/news\/1141","title":{"rendered":"Transfer of Nuclear Fuel Completed at Fukushima Daiichi Unit 5"},"content":{"rendered":"<p>As a result, there are now 1,542 fuel assemblies in the spent fuel pool, including those that were already stored there earlier.<\/p>\n<p>Unit 5 had been undergoing a periodic inspection when the giant earthquake struck on March 11, 2011. All power sources, including emergency diesel generators, were lost to the subsequent tsunami, but the reactor and spent fuel pool were kept cool using generators at the adjacent Unit 6, thus avoiding a worsening of the situation.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>As a result, there are now 1,542 fuel assemblies in the spent fuel pool, including those that were already stored there earlier. Unit 5 had been undergoing a periodic inspection when the giant earthquake struck on March 11, 2011. All power sources, including emergency diesel generators, were lost to the subsequent tsunami, but the reactor [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[10,1],"tags":[383,143],"class_list":["post-1141","post","type-post","status-publish","format-standard","hentry","category-fukushima","category-news","tag-fukushima-daiichi-5","tag-spent-fuel-pool"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.4 - aioseo.com -->\n\t<meta name=\"description\" content=\"As a result, there are now 1,542 fuel assemblies in the spent fuel pool, including those that were already stored there earlier. Unit 5 had been undergoing a periodic inspection when the giant earthquake struck on March 11, 2011. All power sources, including emergency diesel generators, were lost to the subsequent tsunami, but the reactor\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Kaoru Ohno\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.jaif.or.jp\/en\/news\/1141\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.4\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Transfer of Nuclear Fuel Completed at Fukushima Daiichi Unit 5 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:description\" content=\"As a result, there are now 1,542 fuel assemblies in the spent fuel pool, including those that were already stored there earlier. Unit 5 had been undergoing a periodic inspection when the giant earthquake struck on March 11, 2011. All power sources, including emergency diesel generators, were lost to the subsequent tsunami, but the reactor\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.jaif.or.jp\/en\/news\/1141\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2022\/04\/dummy-scaled.webp\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2022\/04\/dummy-scaled.webp\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2015-06-04T00:00:46+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2015-06-04T00:18:50+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@Atoms_in_Japan\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Transfer of Nuclear Fuel Completed at Fukushima Daiichi Unit 5 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta name=\"twitter:description\" content=\"As a result, there are now 1,542 fuel assemblies in the spent fuel pool, including those that were already stored there earlier. Unit 5 had been undergoing a periodic inspection when the giant earthquake struck on March 11, 2011. All power sources, including emergency diesel generators, were lost to the subsequent tsunami, but the reactor\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2022\/04\/dummy-scaled.webp\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1141#blogposting\",\"name\":\"Transfer of Nuclear Fuel Completed at Fukushima Daiichi Unit 5 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"headline\":\"Transfer of Nuclear Fuel Completed at Fukushima Daiichi Unit 5\",\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"},\"datePublished\":\"2015-06-04T00:00:46+09:00\",\"dateModified\":\"2015-06-04T00:18:50+09:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1141#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1141#webpage\"},\"articleSection\":\"Fukushima, News, Fukushima Daiichi-5, spent fuel pool\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1141#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"position\":2,\"name\":\"News\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/fukushima#listItem\",\"name\":\"Fukushima\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/fukushima#listItem\",\"position\":3,\"name\":\"Fukushima\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/fukushima\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1141#listItem\",\"name\":\"Transfer of Nuclear Fuel Completed at Fukushima Daiichi Unit 5\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1141#listItem\",\"position\":4,\"name\":\"Transfer of Nuclear Fuel Completed at Fukushima Daiichi Unit 5\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/fukushima#listItem\",\"name\":\"Fukushima\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno\",\"name\":\"Kaoru Ohno\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1141#webpage\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1141\",\"name\":\"Transfer of Nuclear Fuel Completed at Fukushima Daiichi Unit 5 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"description\":\"As a result, there are now 1,542 fuel assemblies in the spent fuel pool, including those that were already stored there earlier. Unit 5 had been undergoing a periodic inspection when the giant earthquake struck on March 11, 2011. All power sources, including emergency diesel generators, were lost to the subsequent tsunami, but the reactor\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1141#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"datePublished\":\"2015-06-04T00:00:46+09:00\",\"dateModified\":\"2015-06-04T00:18:50+09:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Transfer of Nuclear Fuel Completed at Fukushima Daiichi Unit 5 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"As a result, there are now 1,542 fuel assemblies in the spent fuel pool, including those that were already stored there earlier. Unit 5 had been undergoing a periodic inspection when the giant earthquake struck on March 11, 2011. All power sources, including emergency diesel generators, were lost to the subsequent tsunami, but the reactor","canonical_url":"https:\/\/www.jaif.or.jp\/en\/news\/1141","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1141#blogposting","name":"Transfer of Nuclear Fuel Completed at Fukushima Daiichi Unit 5 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","headline":"Transfer of Nuclear Fuel Completed at Fukushima Daiichi Unit 5","author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"},"datePublished":"2015-06-04T00:00:46+09:00","dateModified":"2015-06-04T00:18:50+09:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/1141#webpage"},"isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/1141#webpage"},"articleSection":"Fukushima, News, Fukushima Daiichi-5, spent fuel pool"},{"@type":"BreadcrumbList","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1141#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.jaif.or.jp\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","position":2,"name":"News","item":"https:\/\/www.jaif.or.jp\/en\/news","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/fukushima#listItem","name":"Fukushima"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/fukushima#listItem","position":3,"name":"Fukushima","item":"https:\/\/www.jaif.or.jp\/en\/news\/fukushima","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1141#listItem","name":"Transfer of Nuclear Fuel Completed at Fukushima Daiichi Unit 5"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1141#listItem","position":4,"name":"Transfer of Nuclear Fuel Completed at Fukushima Daiichi Unit 5","previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/fukushima#listItem","name":"Fukushima"}}]},{"@type":"Organization","@id":"https:\/\/www.jaif.or.jp\/en\/#organization","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","url":"https:\/\/www.jaif.or.jp\/en\/"},{"@type":"Person","@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author","url":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno","name":"Kaoru Ohno"},{"@type":"WebPage","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1141#webpage","url":"https:\/\/www.jaif.or.jp\/en\/news\/1141","name":"Transfer of Nuclear Fuel Completed at Fukushima Daiichi Unit 5 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"As a result, there are now 1,542 fuel assemblies in the spent fuel pool, including those that were already stored there earlier. Unit 5 had been undergoing a periodic inspection when the giant earthquake struck on March 11, 2011. All power sources, including emergency diesel generators, were lost to the subsequent tsunami, but the reactor","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/1141#breadcrumblist"},"author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"creator":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"datePublished":"2015-06-04T00:00:46+09:00","dateModified":"2015-06-04T00:18:50+09:00"},{"@type":"WebSite","@id":"https:\/\/www.jaif.or.jp\/en\/#website","url":"https:\/\/www.jaif.or.jp\/en\/","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:type":"article","og:title":"Transfer of Nuclear Fuel Completed at Fukushima Daiichi Unit 5 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:description":"As a result, there are now 1,542 fuel assemblies in the spent fuel pool, including those that were already stored there earlier. Unit 5 had been undergoing a periodic inspection when the giant earthquake struck on March 11, 2011. All power sources, including emergency diesel generators, were lost to the subsequent tsunami, but the reactor","og:url":"https:\/\/www.jaif.or.jp\/en\/news\/1141","og:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2022\/04\/dummy-scaled.webp","og:image:secure_url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2022\/04\/dummy-scaled.webp","article:published_time":"2015-06-04T00:00:46+00:00","article:modified_time":"2015-06-04T00:18:50+00:00","twitter:card":"summary_large_image","twitter:site":"@Atoms_in_Japan","twitter:title":"Transfer of Nuclear Fuel Completed at Fukushima Daiichi Unit 5 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","twitter:description":"As a result, there are now 1,542 fuel assemblies in the spent fuel pool, including those that were already stored there earlier. Unit 5 had been undergoing a periodic inspection when the giant earthquake struck on March 11, 2011. All power sources, including emergency diesel generators, were lost to the subsequent tsunami, but the reactor","twitter:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2022\/04\/dummy-scaled.webp"},"aioseo_meta_data":{"post_id":"1141","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"limit_modified_date":false,"created":"2022-04-29 13:22:16","updated":"2026-10-29 00:02:59","focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\" title=\"News\">News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\/fukushima\" title=\"Fukushima\">Fukushima<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tTransfer of Nuclear Fuel Completed at Fukushima Daiichi Unit 5\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.jaif.or.jp\/en\/"},{"label":"News","link":"https:\/\/www.jaif.or.jp\/en\/news"},{"label":"Fukushima","link":"https:\/\/www.jaif.or.jp\/en\/news\/fukushima"},{"label":"Transfer of Nuclear Fuel Completed at Fukushima Daiichi Unit 5","link":"https:\/\/www.jaif.or.jp\/en\/news\/1141"}],"_links":{"self":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/1141","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/comments?post=1141"}],"version-history":[{"count":1,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/1141\/revisions"}],"predecessor-version":[{"id":1142,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/1141\/revisions\/1142"}],"wp:attachment":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media?parent=1141"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/categories?post=1141"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/tags?post=1141"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}