{"id":1196,"date":"2015-06-17T10:42:41","date_gmt":"2015-06-17T01:42:41","guid":{"rendered":"http:\/\/www.jaif.or.jp\/en\/?p=1196"},"modified":"2015-06-17T13:38:21","modified_gmt":"2015-06-17T04:38:21","slug":"tohoku-electric-power-says-work-on-safety-measures-at-onagawa-2-and-higashidor-1-to-end-by-april-2017","status":"publish","type":"post","link":"https:\/\/www.jaif.or.jp\/en\/news\/npps\/1196","title":{"rendered":"Tohoku Electric Power Says Work on Safety Measures at Onagawa-2 and Higashidor-1 to End by April 2017"},"content":{"rendered":"<p>The examinations of the plants are currently being undertaken by the Nuclear Regulation Authority (NRA) to confirm compatibility with new regulatory standards. The power company also said that it expected to restart the units thereafter.<\/p>\n<p>Both NPP sites require work to bury tanks for diesel fuel for emergency diesel generators, as well as increased work as a result of fire-protection measures. At Onagawa-2, Tohoku Electric will remove the two existing partially-buried diesel tanks (each 330kl) and replace them with six new underground tanks (each 110kl) at the same location. At Higashidori-1, four new underground tanks (each 180 kl) will be installed separately from the two existing tanks (350 kl).<\/p>\n<p>The power company submitted applications for the compatibility examinations for Onagawa-2 to the NRA in December 2013, and for Higashidori-1 In June 2014. More than 50 evaluation meetings have been held for Onagawa-2 already.<\/p>\n<p>Meanwhile, an NRA expert panel on investigation of a fault zone of crushed rock within the premises of Higashidori-1 did not present its evaluation report to the NRA until March 2015, so the full-scale examination of that reactor started rather late. It is expected to proceed in earnest from now on.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The examinations of the plants are currently being undertaken by the Nuclear Regulation Authority (NRA) to confirm compatibility with new regulatory standards. The power company also said that it expected to restart the units thereafter. Both NPP sites require work to bury tanks for diesel fuel for emergency diesel generators, as well as increased work [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[6,7],"tags":[19,389,18,157,390],"class_list":["post-1196","post","type-post","status-publish","format-standard","hentry","category-npps","category-regulation-safety","tag-nra","tag-onagawa-2","tag-restart","tag-tohoku","tag-tohokuhigashidori-1"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.5.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"The examinations of the plants are currently being undertaken by the Nuclear Regulation Authority (NRA) to confirm compatibility with new regulatory standards. The power company also said that it expected to restart the units thereafter. Both NPP sites require work to bury tanks for diesel fuel for emergency diesel generators, as well as increased work\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Kaoru Ohno\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.jaif.or.jp\/en\/news\/npps\/1196\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.5.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Tohoku Electric Power Says Work on Safety Measures at Onagawa-2 and Higashidor-1 to End by April 2017 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:description\" content=\"The examinations of the plants are currently being undertaken by the Nuclear Regulation Authority (NRA) to confirm compatibility with new regulatory standards. The power company also said that it expected to restart the units thereafter. Both NPP sites require work to bury tanks for diesel fuel for emergency diesel generators, as well as increased work\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.jaif.or.jp\/en\/news\/npps\/1196\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2022\/04\/dummy-scaled.webp\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2022\/04\/dummy-scaled.webp\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2015-06-17T01:42:41+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2015-06-17T04:38:21+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@Atoms_in_Japan\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Tohoku Electric Power Says Work on Safety Measures at Onagawa-2 and Higashidor-1 to End by April 2017 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta name=\"twitter:description\" content=\"The examinations of the plants are currently being undertaken by the Nuclear Regulation Authority (NRA) to confirm compatibility with new regulatory standards. The power company also said that it expected to restart the units thereafter. Both NPP sites require work to bury tanks for diesel fuel for emergency diesel generators, as well as increased work\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2022\/04\/dummy-scaled.webp\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps\\\/1196#blogposting\",\"name\":\"Tohoku Electric Power Says Work on Safety Measures at Onagawa-2 and Higashidor-1 to End by April 2017 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"headline\":\"Tohoku Electric Power Says Work on Safety Measures at Onagawa-2 and Higashidor-1 to End by April 2017\",\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"},\"datePublished\":\"2015-06-17T10:42:41+09:00\",\"dateModified\":\"2015-06-17T13:38:21+09:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps\\\/1196#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps\\\/1196#webpage\"},\"articleSection\":\"NPPs, Regulation &amp; Safety, NRA, Onagawa-2, restart, Tohoku, Tohoku\\\/Higashidori-1\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps\\\/1196#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"position\":2,\"name\":\"News\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"position\":3,\"name\":\"NPPs\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps\\\/1196#listItem\",\"name\":\"Tohoku Electric Power Says Work on Safety Measures at Onagawa-2 and Higashidor-1 to End by April 2017\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps\\\/1196#listItem\",\"position\":4,\"name\":\"Tohoku Electric Power Says Work on Safety Measures at Onagawa-2 and Higashidor-1 to End by April 2017\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno\",\"name\":\"Kaoru Ohno\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps\\\/1196#webpage\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps\\\/1196\",\"name\":\"Tohoku Electric Power Says Work on Safety Measures at Onagawa-2 and Higashidor-1 to End by April 2017 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"description\":\"The examinations of the plants are currently being undertaken by the Nuclear Regulation Authority (NRA) to confirm compatibility with new regulatory standards. The power company also said that it expected to restart the units thereafter. Both NPP sites require work to bury tanks for diesel fuel for emergency diesel generators, as well as increased work\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps\\\/1196#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"datePublished\":\"2015-06-17T10:42:41+09:00\",\"dateModified\":\"2015-06-17T13:38:21+09:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Tohoku Electric Power Says Work on Safety Measures at Onagawa-2 and Higashidor-1 to End by April 2017 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"The examinations of the plants are currently being undertaken by the Nuclear Regulation Authority (NRA) to confirm compatibility with new regulatory standards. The power company also said that it expected to restart the units thereafter. Both NPP sites require work to bury tanks for diesel fuel for emergency diesel generators, as well as increased work","canonical_url":"https:\/\/www.jaif.or.jp\/en\/news\/npps\/1196","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps\/1196#blogposting","name":"Tohoku Electric Power Says Work on Safety Measures at Onagawa-2 and Higashidor-1 to End by April 2017 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","headline":"Tohoku Electric Power Says Work on Safety Measures at Onagawa-2 and Higashidor-1 to End by April 2017","author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"},"datePublished":"2015-06-17T10:42:41+09:00","dateModified":"2015-06-17T13:38:21+09:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps\/1196#webpage"},"isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps\/1196#webpage"},"articleSection":"NPPs, Regulation &amp; Safety, NRA, Onagawa-2, restart, Tohoku, Tohoku\/Higashidori-1"},{"@type":"BreadcrumbList","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps\/1196#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.jaif.or.jp\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","position":2,"name":"News","item":"https:\/\/www.jaif.or.jp\/en\/news","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","position":3,"name":"NPPs","item":"https:\/\/www.jaif.or.jp\/en\/news\/npps","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps\/1196#listItem","name":"Tohoku Electric Power Says Work on Safety Measures at Onagawa-2 and Higashidor-1 to End by April 2017"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps\/1196#listItem","position":4,"name":"Tohoku Electric Power Says Work on Safety Measures at Onagawa-2 and Higashidor-1 to End by April 2017","previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"}}]},{"@type":"Organization","@id":"https:\/\/www.jaif.or.jp\/en\/#organization","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","url":"https:\/\/www.jaif.or.jp\/en\/"},{"@type":"Person","@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author","url":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno","name":"Kaoru Ohno"},{"@type":"WebPage","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps\/1196#webpage","url":"https:\/\/www.jaif.or.jp\/en\/news\/npps\/1196","name":"Tohoku Electric Power Says Work on Safety Measures at Onagawa-2 and Higashidor-1 to End by April 2017 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"The examinations of the plants are currently being undertaken by the Nuclear Regulation Authority (NRA) to confirm compatibility with new regulatory standards. The power company also said that it expected to restart the units thereafter. Both NPP sites require work to bury tanks for diesel fuel for emergency diesel generators, as well as increased work","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps\/1196#breadcrumblist"},"author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"creator":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"datePublished":"2015-06-17T10:42:41+09:00","dateModified":"2015-06-17T13:38:21+09:00"},{"@type":"WebSite","@id":"https:\/\/www.jaif.or.jp\/en\/#website","url":"https:\/\/www.jaif.or.jp\/en\/","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:type":"article","og:title":"Tohoku Electric Power Says Work on Safety Measures at Onagawa-2 and Higashidor-1 to End by April 2017 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:description":"The examinations of the plants are currently being undertaken by the Nuclear Regulation Authority (NRA) to confirm compatibility with new regulatory standards. The power company also said that it expected to restart the units thereafter. Both NPP sites require work to bury tanks for diesel fuel for emergency diesel generators, as well as increased work","og:url":"https:\/\/www.jaif.or.jp\/en\/news\/npps\/1196","og:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2022\/04\/dummy-scaled.webp","og:image:secure_url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2022\/04\/dummy-scaled.webp","article:published_time":"2015-06-17T01:42:41+00:00","article:modified_time":"2015-06-17T04:38:21+00:00","twitter:card":"summary_large_image","twitter:site":"@Atoms_in_Japan","twitter:title":"Tohoku Electric Power Says Work on Safety Measures at Onagawa-2 and Higashidor-1 to End by April 2017 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","twitter:description":"The examinations of the plants are currently being undertaken by the Nuclear Regulation Authority (NRA) to confirm compatibility with new regulatory standards. The power company also said that it expected to restart the units thereafter. Both NPP sites require work to bury tanks for diesel fuel for emergency diesel generators, as well as increased work","twitter:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2022\/04\/dummy-scaled.webp"},"aioseo_meta_data":{"post_id":"1196","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"limit_modified_date":false,"created":"2022-04-29 13:23:16","updated":"2026-10-29 00:05:04","focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\" title=\"News\">News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\/npps\" title=\"NPPs\">NPPs<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tTohoku Electric Power Says Work on Safety Measures at Onagawa-2 and Higashidor-1 to End by April 2017\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.jaif.or.jp\/en\/"},{"label":"News","link":"https:\/\/www.jaif.or.jp\/en\/news"},{"label":"NPPs","link":"https:\/\/www.jaif.or.jp\/en\/news\/npps"},{"label":"Tohoku Electric Power Says Work on Safety Measures at Onagawa-2 and Higashidor-1 to End by April 2017","link":"https:\/\/www.jaif.or.jp\/en\/news\/npps\/1196"}],"_links":{"self":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/1196","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/comments?post=1196"}],"version-history":[{"count":1,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/1196\/revisions"}],"predecessor-version":[{"id":1197,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/1196\/revisions\/1197"}],"wp:attachment":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media?parent=1196"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/categories?post=1196"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/tags?post=1196"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}