{"id":1298,"date":"2015-07-08T14:02:16","date_gmt":"2015-07-08T05:02:16","guid":{"rendered":"http:\/\/www.jaif.or.jp\/en\/?p=1298"},"modified":"2015-07-10T09:32:25","modified_gmt":"2015-07-10T00:32:25","slug":"kansai-ep-files-applications-for-construction-plans-for-takahama-1-2","status":"publish","type":"post","link":"https:\/\/www.jaif.or.jp\/en\/news\/1298","title":{"rendered":"Kansai EP Files Applications for Construction Plans for Takahama-1 &#038; -2"},"content":{"rendered":"<p>In the same regard, it had earlier filed applications for permission to change reactor installations on March 17, but had to submit the construction work plans separately, as it took additional time for seismic safety evaluations on account of changes in the basic design earthquake ground motion level from 550 gals to 700 gals.<\/p>\n<p>Similarly, <a href=\"https:\/\/www.jaif.or.jp\/en-renew\/kansai-ep-applies-to-extend-operation-of-takahama-1-2-by-20-years\/\" target=\"_blank\">Kansai EP had applied for permission on April 30 to extend the operating lifetimes of the Takahama-1 and -2<\/a>, after which it reviewed standard ground motion levels and implemented seismic safety evaluations of major equipment in the interior of the primary containment vessels (PCVs). Having confirmed that extensions to 60 years of operation would present no problems, it submitted amendments to the NRA on July 3.<\/p>\n<p>Takahama-1 has been in service for more than 40 years, with Unit 2 reaching that mark in November. Both reactors are currently authorized to operate until July 7 of next year, as specific exceptions in current circumstances. Considering the time required for the examinations, the NRA will conduct examinations for lifetime extensions and evaluate measures for aging reactors during its evaluation meetings on compatibility with the new regulatory standards.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In the same regard, it had earlier filed applications for permission to change reactor installations on March 17, but had to submit the construction work plans separately, as it took additional time for seismic safety evaluations on account of changes in the basic design earthquake ground motion level from 550 gals to 700 gals. Similarly, [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":1300,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1,6,7],"tags":[245,20,19,18,279,280],"class_list":["post-1298","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-npps","category-regulation-safety","tag-extension","tag-kansai","tag-nra","tag-restart","tag-takahama-1","tag-takahama-2"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.5.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"In the same regard, it had earlier filed applications for permission to change reactor installations on March 17, but had to submit the construction work plans separately, as it took additional time for seismic safety evaluations on account of changes in the basic design earthquake ground motion level from 550 gals to 700 gals. Similarly,\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Kaoru Ohno\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.jaif.or.jp\/en\/news\/1298\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.5.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Kansai EP Files Applications for Construction Plans for Takahama-1 &amp; -2 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:description\" content=\"In the same regard, it had earlier filed applications for permission to change reactor installations on March 17, but had to submit the construction work plans separately, as it took additional time for seismic safety evaluations on account of changes in the basic design earthquake ground motion level from 550 gals to 700 gals. Similarly,\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.jaif.or.jp\/en\/news\/1298\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/07\/\u9ad8\u6d5c2\u30dc\u30ab\u30b7-e1436331437896.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/07\/\u9ad8\u6d5c2\u30dc\u30ab\u30b7-e1436331437896.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"310\" \/>\n\t\t<meta property=\"og:image:height\" content=\"201\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2015-07-08T05:02:16+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2015-07-10T00:32:25+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@Atoms_in_Japan\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Kansai EP Files Applications for Construction Plans for Takahama-1 &amp; -2 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta name=\"twitter:description\" content=\"In the same regard, it had earlier filed applications for permission to change reactor installations on March 17, but had to submit the construction work plans separately, as it took additional time for seismic safety evaluations on account of changes in the basic design earthquake ground motion level from 550 gals to 700 gals. Similarly,\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/07\/\u9ad8\u6d5c2\u30dc\u30ab\u30b7-e1436331437896.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1298#blogposting\",\"name\":\"Kansai EP Files Applications for Construction Plans for Takahama-1 & -2 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"headline\":\"Kansai EP Files Applications for Construction Plans for Takahama-1 &#038; -2\",\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/wp-content\\\/uploads\\\/2015\\\/07\\\/\\u9ad8\\u6d5c2\\u30dc\\u30ab\\u30b7-e1436331437896.jpg\",\"width\":310,\"height\":201,\"caption\":\"Takahama-1 & -2\"},\"datePublished\":\"2015-07-08T14:02:16+09:00\",\"dateModified\":\"2015-07-10T09:32:25+09:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1298#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1298#webpage\"},\"articleSection\":\"News, NPPs, Regulation &amp; Safety, extension, Kansai, NRA, restart, Takahama-1, Takahama-2\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1298#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"position\":2,\"name\":\"News\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"position\":3,\"name\":\"NPPs\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1298#listItem\",\"name\":\"Kansai EP Files Applications for Construction Plans for Takahama-1 &#038; -2\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1298#listItem\",\"position\":4,\"name\":\"Kansai EP Files Applications for Construction Plans for Takahama-1 &#038; -2\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno\",\"name\":\"Kaoru Ohno\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1298#webpage\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1298\",\"name\":\"Kansai EP Files Applications for Construction Plans for Takahama-1 & -2 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"description\":\"In the same regard, it had earlier filed applications for permission to change reactor installations on March 17, but had to submit the construction work plans separately, as it took additional time for seismic safety evaluations on account of changes in the basic design earthquake ground motion level from 550 gals to 700 gals. Similarly,\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1298#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/wp-content\\\/uploads\\\/2015\\\/07\\\/\\u9ad8\\u6d5c2\\u30dc\\u30ab\\u30b7-e1436331437896.jpg\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1298\\\/#mainImage\",\"width\":310,\"height\":201,\"caption\":\"Takahama-1 & -2\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1298#mainImage\"},\"datePublished\":\"2015-07-08T14:02:16+09:00\",\"dateModified\":\"2015-07-10T09:32:25+09:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Kansai EP Files Applications for Construction Plans for Takahama-1 & -2 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"In the same regard, it had earlier filed applications for permission to change reactor installations on March 17, but had to submit the construction work plans separately, as it took additional time for seismic safety evaluations on account of changes in the basic design earthquake ground motion level from 550 gals to 700 gals. Similarly,","canonical_url":"https:\/\/www.jaif.or.jp\/en\/news\/1298","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1298#blogposting","name":"Kansai EP Files Applications for Construction Plans for Takahama-1 & -2 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","headline":"Kansai EP Files Applications for Construction Plans for Takahama-1 &#038; -2","author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/07\/\u9ad8\u6d5c2\u30dc\u30ab\u30b7-e1436331437896.jpg","width":310,"height":201,"caption":"Takahama-1 & -2"},"datePublished":"2015-07-08T14:02:16+09:00","dateModified":"2015-07-10T09:32:25+09:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/1298#webpage"},"isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/1298#webpage"},"articleSection":"News, NPPs, Regulation &amp; Safety, extension, Kansai, NRA, restart, Takahama-1, Takahama-2"},{"@type":"BreadcrumbList","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1298#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.jaif.or.jp\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","position":2,"name":"News","item":"https:\/\/www.jaif.or.jp\/en\/news","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","position":3,"name":"NPPs","item":"https:\/\/www.jaif.or.jp\/en\/news\/npps","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1298#listItem","name":"Kansai EP Files Applications for Construction Plans for Takahama-1 &#038; -2"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1298#listItem","position":4,"name":"Kansai EP Files Applications for Construction Plans for Takahama-1 &#038; -2","previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"}}]},{"@type":"Organization","@id":"https:\/\/www.jaif.or.jp\/en\/#organization","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","url":"https:\/\/www.jaif.or.jp\/en\/"},{"@type":"Person","@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author","url":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno","name":"Kaoru Ohno"},{"@type":"WebPage","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1298#webpage","url":"https:\/\/www.jaif.or.jp\/en\/news\/1298","name":"Kansai EP Files Applications for Construction Plans for Takahama-1 & -2 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"In the same regard, it had earlier filed applications for permission to change reactor installations on March 17, but had to submit the construction work plans separately, as it took additional time for seismic safety evaluations on account of changes in the basic design earthquake ground motion level from 550 gals to 700 gals. Similarly,","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/1298#breadcrumblist"},"author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"creator":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/07\/\u9ad8\u6d5c2\u30dc\u30ab\u30b7-e1436331437896.jpg","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1298\/#mainImage","width":310,"height":201,"caption":"Takahama-1 & -2"},"primaryImageOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/1298#mainImage"},"datePublished":"2015-07-08T14:02:16+09:00","dateModified":"2015-07-10T09:32:25+09:00"},{"@type":"WebSite","@id":"https:\/\/www.jaif.or.jp\/en\/#website","url":"https:\/\/www.jaif.or.jp\/en\/","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:type":"article","og:title":"Kansai EP Files Applications for Construction Plans for Takahama-1 &amp; -2 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:description":"In the same regard, it had earlier filed applications for permission to change reactor installations on March 17, but had to submit the construction work plans separately, as it took additional time for seismic safety evaluations on account of changes in the basic design earthquake ground motion level from 550 gals to 700 gals. Similarly,","og:url":"https:\/\/www.jaif.or.jp\/en\/news\/1298","og:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/07\/\u9ad8\u6d5c2\u30dc\u30ab\u30b7-e1436331437896.jpg","og:image:secure_url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/07\/\u9ad8\u6d5c2\u30dc\u30ab\u30b7-e1436331437896.jpg","og:image:width":310,"og:image:height":201,"article:published_time":"2015-07-08T05:02:16+00:00","article:modified_time":"2015-07-10T00:32:25+00:00","twitter:card":"summary_large_image","twitter:site":"@Atoms_in_Japan","twitter:title":"Kansai EP Files Applications for Construction Plans for Takahama-1 &amp; -2 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","twitter:description":"In the same regard, it had earlier filed applications for permission to change reactor installations on March 17, but had to submit the construction work plans separately, as it took additional time for seismic safety evaluations on account of changes in the basic design earthquake ground motion level from 550 gals to 700 gals. Similarly,","twitter:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/07\/\u9ad8\u6d5c2\u30dc\u30ab\u30b7-e1436331437896.jpg"},"aioseo_meta_data":{"post_id":"1298","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"limit_modified_date":false,"created":"2022-04-29 13:25:16","updated":"2026-10-29 00:07:59","focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\" title=\"News\">News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\/npps\" title=\"NPPs\">NPPs<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tKansai EP Files Applications for Construction Plans for Takahama-1 &amp; -2\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.jaif.or.jp\/en\/"},{"label":"News","link":"https:\/\/www.jaif.or.jp\/en\/news"},{"label":"NPPs","link":"https:\/\/www.jaif.or.jp\/en\/news\/npps"},{"label":"Kansai EP Files Applications for Construction Plans for Takahama-1 &#038; -2","link":"https:\/\/www.jaif.or.jp\/en\/news\/1298"}],"_links":{"self":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/1298","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/comments?post=1298"}],"version-history":[{"count":1,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/1298\/revisions"}],"predecessor-version":[{"id":1301,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/1298\/revisions\/1301"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media\/1300"}],"wp:attachment":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media?parent=1298"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/categories?post=1298"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/tags?post=1298"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}