{"id":1323,"date":"2015-07-17T09:26:41","date_gmt":"2015-07-17T00:26:41","guid":{"rendered":"http:\/\/www.jaif.or.jp\/en\/?p=1323"},"modified":"2015-07-23T09:27:55","modified_gmt":"2015-07-23T00:27:55","slug":"nra-confirms-progress-in-inspections-at-sendai-1-before-restart","status":"publish","type":"post","link":"https:\/\/www.jaif.or.jp\/en\/news\/1323","title":{"rendered":"NRA Confirms Progress in Inspections at Sendai-1 before Restart"},"content":{"rendered":"<p>After it approved a change to the reactor&#8217;s basic design in September 2014, the NRA gave its first-ever approval at Sendai-1 to an examination of a reactor&#8217;s compatibility with new regulatory standards. Later, in March of this year, it approved the construction work plan (i.e., a fleshed-out design based on the basic design), and approved revisions to the operational safety program two months later in May.<\/p>\n<p>Currently, it is carrying out a pre-service inspection toward the restart of Sendai-1, concurrently with an inspection of Sendai-2. On July 10, Kyushu Electric Power completed its loading of fuel assemblies at Unit 1.<\/p>\n<p>The pre-service inspections, which began on March 30, have looked at the state of reactor buildings, as provided for in the first five clauses of the relevant ordinance. So far, inspection of the items in the first three clauses has been completed at Unit 1. Also, a revised operational safety program came into effect on June 5, after the approval given in May.<\/p>\n<p>Accordingly, from June 8 to 26, the NRA conducted its first safety pre-service inspection of the year to confirm that improved measures for severe accidents and other contingencies were properly reflected in operational safety activities, and that they were being implemented. After that, from July 6 to 14, the NRA inspected operations for loading fuel assemblies into the reactor.<\/p>\n<p>From now on, the NRA will inspect comprehensive drills for severe accidents prior to restarting Sendai-1. It is also redoing a periodic inspection of the unit that had been underway when the new regulatory standards came into effect, so as to confirm that it abides by the new standards, while also looking at items previously inspected.<\/p>\n<p>After listening to explanations from staff of the NRA secretariat responsible for specific inspections, NRA Chairman Shunichi Tanaka said, \u201cSafety must remain our consistent priority to the end, and not merely following a schedule.\u201d That demonstrated his determination for inspections as time progresses, as Japan will soon see the first restart of an NPP that has cleared the new regulatory standards.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>After it approved a change to the reactor&#8217;s basic design in September 2014, the NRA gave its first-ever approval at Sendai-1 to an examination of a reactor&#8217;s compatibility with new regulatory standards. Later, in March of this year, it approved the construction work plan (i.e., a fleshed-out design based on the basic design), and approved [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":899,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1,6,7],"tags":[37,19,313,18,271,149],"class_list":["post-1323","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-npps","category-regulation-safety","tag-kyushu","tag-nra","tag-pre-service-inspection","tag-restart","tag-sendai-1","tag-shunichi-tanaka"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.5.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"After it approved a change to the reactor&#039;s basic design in September 2014, the NRA gave its first-ever approval at Sendai-1 to an examination of a reactor&#039;s compatibility with new regulatory standards. Later, in March of this year, it approved the construction work plan (i.e., a fleshed-out design based on the basic design), and approved\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Kaoru Ohno\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.jaif.or.jp\/en\/news\/1323\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.5.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"NRA Confirms Progress in Inspections at Sendai-1 before Restart - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:description\" content=\"After it approved a change to the reactor&#039;s basic design in September 2014, the NRA gave its first-ever approval at Sendai-1 to an examination of a reactor&#039;s compatibility with new regulatory standards. Later, in March of this year, it approved the construction work plan (i.e., a fleshed-out design based on the basic design), and approved\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.jaif.or.jp\/en\/news\/1323\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/04\/\u5ddd\u5185\u539f\u5b50\u529b\u767a\u96fb\u6240071019-e1428025298795.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/04\/\u5ddd\u5185\u539f\u5b50\u529b\u767a\u96fb\u6240071019-e1428025298795.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"310\" \/>\n\t\t<meta property=\"og:image:height\" content=\"218\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2015-07-17T00:26:41+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2015-07-23T00:27:55+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@Atoms_in_Japan\" \/>\n\t\t<meta name=\"twitter:title\" content=\"NRA Confirms Progress in Inspections at Sendai-1 before Restart - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta name=\"twitter:description\" content=\"After it approved a change to the reactor&#039;s basic design in September 2014, the NRA gave its first-ever approval at Sendai-1 to an examination of a reactor&#039;s compatibility with new regulatory standards. Later, in March of this year, it approved the construction work plan (i.e., a fleshed-out design based on the basic design), and approved\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/04\/\u5ddd\u5185\u539f\u5b50\u529b\u767a\u96fb\u6240071019-e1428025298795.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1323#blogposting\",\"name\":\"NRA Confirms Progress in Inspections at Sendai-1 before Restart - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"headline\":\"NRA Confirms Progress in Inspections at Sendai-1 before Restart\",\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/wp-content\\\/uploads\\\/2015\\\/04\\\/\\u5ddd\\u5185\\u539f\\u5b50\\u529b\\u767a\\u96fb\\u6240071019-e1428025298795.jpg\",\"width\":310,\"height\":218,\"caption\":\"Sendai NPPs\"},\"datePublished\":\"2015-07-17T09:26:41+09:00\",\"dateModified\":\"2015-07-23T09:27:55+09:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1323#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1323#webpage\"},\"articleSection\":\"News, NPPs, Regulation &amp; Safety, Kyushu, NRA, pre-service inspection, restart, Sendai-1, Shunichi Tanaka\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1323#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"position\":2,\"name\":\"News\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"position\":3,\"name\":\"NPPs\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1323#listItem\",\"name\":\"NRA Confirms Progress in Inspections at Sendai-1 before Restart\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1323#listItem\",\"position\":4,\"name\":\"NRA Confirms Progress in Inspections at Sendai-1 before Restart\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno\",\"name\":\"Kaoru Ohno\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1323#webpage\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1323\",\"name\":\"NRA Confirms Progress in Inspections at Sendai-1 before Restart - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"description\":\"After it approved a change to the reactor's basic design in September 2014, the NRA gave its first-ever approval at Sendai-1 to an examination of a reactor's compatibility with new regulatory standards. Later, in March of this year, it approved the construction work plan (i.e., a fleshed-out design based on the basic design), and approved\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1323#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/wp-content\\\/uploads\\\/2015\\\/04\\\/\\u5ddd\\u5185\\u539f\\u5b50\\u529b\\u767a\\u96fb\\u6240071019-e1428025298795.jpg\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1323\\\/#mainImage\",\"width\":310,\"height\":218,\"caption\":\"Sendai NPPs\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1323#mainImage\"},\"datePublished\":\"2015-07-17T09:26:41+09:00\",\"dateModified\":\"2015-07-23T09:27:55+09:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"NRA Confirms Progress in Inspections at Sendai-1 before Restart - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"After it approved a change to the reactor's basic design in September 2014, the NRA gave its first-ever approval at Sendai-1 to an examination of a reactor's compatibility with new regulatory standards. Later, in March of this year, it approved the construction work plan (i.e., a fleshed-out design based on the basic design), and approved","canonical_url":"https:\/\/www.jaif.or.jp\/en\/news\/1323","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1323#blogposting","name":"NRA Confirms Progress in Inspections at Sendai-1 before Restart - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","headline":"NRA Confirms Progress in Inspections at Sendai-1 before Restart","author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/04\/\u5ddd\u5185\u539f\u5b50\u529b\u767a\u96fb\u6240071019-e1428025298795.jpg","width":310,"height":218,"caption":"Sendai NPPs"},"datePublished":"2015-07-17T09:26:41+09:00","dateModified":"2015-07-23T09:27:55+09:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/1323#webpage"},"isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/1323#webpage"},"articleSection":"News, NPPs, Regulation &amp; Safety, Kyushu, NRA, pre-service inspection, restart, Sendai-1, Shunichi Tanaka"},{"@type":"BreadcrumbList","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1323#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.jaif.or.jp\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","position":2,"name":"News","item":"https:\/\/www.jaif.or.jp\/en\/news","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","position":3,"name":"NPPs","item":"https:\/\/www.jaif.or.jp\/en\/news\/npps","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1323#listItem","name":"NRA Confirms Progress in Inspections at Sendai-1 before Restart"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1323#listItem","position":4,"name":"NRA Confirms Progress in Inspections at Sendai-1 before Restart","previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"}}]},{"@type":"Organization","@id":"https:\/\/www.jaif.or.jp\/en\/#organization","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","url":"https:\/\/www.jaif.or.jp\/en\/"},{"@type":"Person","@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author","url":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno","name":"Kaoru Ohno"},{"@type":"WebPage","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1323#webpage","url":"https:\/\/www.jaif.or.jp\/en\/news\/1323","name":"NRA Confirms Progress in Inspections at Sendai-1 before Restart - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"After it approved a change to the reactor's basic design in September 2014, the NRA gave its first-ever approval at Sendai-1 to an examination of a reactor's compatibility with new regulatory standards. Later, in March of this year, it approved the construction work plan (i.e., a fleshed-out design based on the basic design), and approved","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/1323#breadcrumblist"},"author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"creator":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/04\/\u5ddd\u5185\u539f\u5b50\u529b\u767a\u96fb\u6240071019-e1428025298795.jpg","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1323\/#mainImage","width":310,"height":218,"caption":"Sendai NPPs"},"primaryImageOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/1323#mainImage"},"datePublished":"2015-07-17T09:26:41+09:00","dateModified":"2015-07-23T09:27:55+09:00"},{"@type":"WebSite","@id":"https:\/\/www.jaif.or.jp\/en\/#website","url":"https:\/\/www.jaif.or.jp\/en\/","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:type":"article","og:title":"NRA Confirms Progress in Inspections at Sendai-1 before Restart - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:description":"After it approved a change to the reactor's basic design in September 2014, the NRA gave its first-ever approval at Sendai-1 to an examination of a reactor's compatibility with new regulatory standards. Later, in March of this year, it approved the construction work plan (i.e., a fleshed-out design based on the basic design), and approved","og:url":"https:\/\/www.jaif.or.jp\/en\/news\/1323","og:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/04\/\u5ddd\u5185\u539f\u5b50\u529b\u767a\u96fb\u6240071019-e1428025298795.jpg","og:image:secure_url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/04\/\u5ddd\u5185\u539f\u5b50\u529b\u767a\u96fb\u6240071019-e1428025298795.jpg","og:image:width":310,"og:image:height":218,"article:published_time":"2015-07-17T00:26:41+00:00","article:modified_time":"2015-07-23T00:27:55+00:00","twitter:card":"summary_large_image","twitter:site":"@Atoms_in_Japan","twitter:title":"NRA Confirms Progress in Inspections at Sendai-1 before Restart - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","twitter:description":"After it approved a change to the reactor's basic design in September 2014, the NRA gave its first-ever approval at Sendai-1 to an examination of a reactor's compatibility with new regulatory standards. Later, in March of this year, it approved the construction work plan (i.e., a fleshed-out design based on the basic design), and approved","twitter:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/04\/\u5ddd\u5185\u539f\u5b50\u529b\u767a\u96fb\u6240071019-e1428025298795.jpg"},"aioseo_meta_data":{"post_id":"1323","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"limit_modified_date":false,"created":"2022-04-29 13:26:16","updated":"2026-10-29 00:09:45","focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\" title=\"News\">News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\/npps\" title=\"NPPs\">NPPs<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tNRA Confirms Progress in Inspections at Sendai-1 before Restart\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.jaif.or.jp\/en\/"},{"label":"News","link":"https:\/\/www.jaif.or.jp\/en\/news"},{"label":"NPPs","link":"https:\/\/www.jaif.or.jp\/en\/news\/npps"},{"label":"NRA Confirms Progress in Inspections at Sendai-1 before Restart","link":"https:\/\/www.jaif.or.jp\/en\/news\/1323"}],"_links":{"self":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/1323","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/comments?post=1323"}],"version-history":[{"count":1,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/1323\/revisions"}],"predecessor-version":[{"id":1324,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/1323\/revisions\/1324"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media\/899"}],"wp:attachment":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media?parent=1323"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/categories?post=1323"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/tags?post=1323"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}