{"id":1362,"date":"2015-08-04T14:25:02","date_gmt":"2015-08-04T05:25:02","guid":{"rendered":"http:\/\/www.jaif.or.jp\/en\/?p=1362"},"modified":"2015-08-19T11:01:24","modified_gmt":"2015-08-19T02:01:24","slug":"fuel-handling-machine-removed-from-unit-3-spent-fuel-pool-at-fukushima-daiichi","status":"publish","type":"post","link":"https:\/\/www.jaif.or.jp\/en\/news\/fukushima\/1362","title":{"rendered":"Fuel Handling Machine Removed from Unit 3 Spent Fuel Pool at Fukushima Daiichi"},"content":{"rendered":"<p>The Tokyo Electric Power Co. (TEPCO), the owner of the facility, had taken various precautionary steps against risks experienced during the removal. Those included investigating the conditions inside the pool, designing a special machine to lift the large debris, and testing that on a mock-up of the debris. It also held meetings with local citizens, at which it explained what actions would be taken.<\/p>\n<p>Before removal operations were resumed, the power company&#8217;s preparations had included installing additional protective boards in the pool and designing equipment to lift the machine. On the day of the removal, all other work in the area was suspended to ensure the ability to react to any possible eventuality.<img loading=\"lazy\" decoding=\"async\" class=\"alignright size-full wp-image-1363\" src=\"https:\/\/www.jaif.or.jp\/en-renew\/wp-content\/uploads\/2015\/08\/\u71c3\u6599\u4ea4\u63db\u6a5f\u9ce5\u77b0\u56f3-e1438665583343.jpg\" alt=\"\" width=\"310\" height=\"211\" \/><\/p>\n<p>TEPCO said that the removal of the fuel handling machine was a major step forward toward the future removal of fuel assemblies.<\/p>\n<p>After an agent is sprayed to prevent the scattering of radioactive materials in the southwestern section of the space, the main body of the machine removed on August 2 will be cut into pieces for transfer. Those pieces will be temporarily sorted into high-level and low-level radioactive debris, and placed in the appropriate storage areas.<\/p>\n<p>According to the government&#8217;s latest mid-to-long-term roadmap toward the decommissioning, revised in June, TEPCO will begin removing the spent fuel assemblies at Unit 3 in FY17 (April 2017 to March 2018).<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Tokyo Electric Power Co. (TEPCO), the owner of the facility, had taken various precautionary steps against risks experienced during the removal. Those included investigating the conditions inside the pool, designing a special machine to lift the large debris, and testing that on a mock-up of the debris. It also held meetings with local citizens, [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":1364,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[10],"tags":[85,326,299,283,23,123],"class_list":["post-1362","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-fukushima","tag-decommissioning","tag-fuel-debris","tag-fuel-removal","tag-fukushima-daiichi-3","tag-tepco","tag-toshiba"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.4 - aioseo.com -->\n\t<meta name=\"description\" content=\"The Tokyo Electric Power Co. (TEPCO), the owner of the facility, had taken various precautionary steps against risks experienced during the removal. Those included investigating the conditions inside the pool, designing a special machine to lift the large debris, and testing that on a mock-up of the debris. It also held meetings with local citizens,\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Kaoru Ohno\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.jaif.or.jp\/en\/news\/fukushima\/1362\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.4\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Fuel Handling Machine Removed from Unit 3 Spent Fuel Pool at Fukushima Daiichi - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:description\" content=\"The Tokyo Electric Power Co. (TEPCO), the owner of the facility, had taken various precautionary steps against risks experienced during the removal. Those included investigating the conditions inside the pool, designing a special machine to lift the large debris, and testing that on a mock-up of the debris. It also held meetings with local citizens,\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.jaif.or.jp\/en\/news\/fukushima\/1362\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/08\/\u71c3\u6599\u4ea4\u63db\u6a5f\u540a\u4e0a-e1438665546614.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/08\/\u71c3\u6599\u4ea4\u63db\u6a5f\u540a\u4e0a-e1438665546614.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"310\" \/>\n\t\t<meta property=\"og:image:height\" content=\"225\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2015-08-04T05:25:02+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2015-08-19T02:01:24+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@Atoms_in_Japan\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Fuel Handling Machine Removed from Unit 3 Spent Fuel Pool at Fukushima Daiichi - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta name=\"twitter:description\" content=\"The Tokyo Electric Power Co. (TEPCO), the owner of the facility, had taken various precautionary steps against risks experienced during the removal. Those included investigating the conditions inside the pool, designing a special machine to lift the large debris, and testing that on a mock-up of the debris. It also held meetings with local citizens,\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/08\/\u71c3\u6599\u4ea4\u63db\u6a5f\u540a\u4e0a-e1438665546614.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/fukushima\\\/1362#blogposting\",\"name\":\"Fuel Handling Machine Removed from Unit 3 Spent Fuel Pool at Fukushima Daiichi - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"headline\":\"Fuel Handling Machine Removed from Unit 3 Spent Fuel Pool at Fukushima Daiichi\",\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/wp-content\\\/uploads\\\/2015\\\/08\\\/\\u71c3\\u6599\\u4ea4\\u63db\\u6a5f\\u540a\\u4e0a-e1438665546614.jpg\",\"width\":310,\"height\":225},\"datePublished\":\"2015-08-04T14:25:02+09:00\",\"dateModified\":\"2015-08-19T11:01:24+09:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/fukushima\\\/1362#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/fukushima\\\/1362#webpage\"},\"articleSection\":\"Fukushima, decommissioning, fuel debris, fuel removal, Fukushima Daiichi-3, TEPCO, Toshiba\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/fukushima\\\/1362#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"position\":2,\"name\":\"News\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/fukushima#listItem\",\"name\":\"Fukushima\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/fukushima#listItem\",\"position\":3,\"name\":\"Fukushima\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/fukushima\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/fukushima\\\/1362#listItem\",\"name\":\"Fuel Handling Machine Removed from Unit 3 Spent Fuel Pool at Fukushima Daiichi\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/fukushima\\\/1362#listItem\",\"position\":4,\"name\":\"Fuel Handling Machine Removed from Unit 3 Spent Fuel Pool at Fukushima Daiichi\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/fukushima#listItem\",\"name\":\"Fukushima\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno\",\"name\":\"Kaoru Ohno\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/fukushima\\\/1362#webpage\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/fukushima\\\/1362\",\"name\":\"Fuel Handling Machine Removed from Unit 3 Spent Fuel Pool at Fukushima Daiichi - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"description\":\"The Tokyo Electric Power Co. (TEPCO), the owner of the facility, had taken various precautionary steps against risks experienced during the removal. Those included investigating the conditions inside the pool, designing a special machine to lift the large debris, and testing that on a mock-up of the debris. It also held meetings with local citizens,\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/fukushima\\\/1362#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/wp-content\\\/uploads\\\/2015\\\/08\\\/\\u71c3\\u6599\\u4ea4\\u63db\\u6a5f\\u540a\\u4e0a-e1438665546614.jpg\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/fukushima\\\/1362\\\/#mainImage\",\"width\":310,\"height\":225},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/fukushima\\\/1362#mainImage\"},\"datePublished\":\"2015-08-04T14:25:02+09:00\",\"dateModified\":\"2015-08-19T11:01:24+09:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Fuel Handling Machine Removed from Unit 3 Spent Fuel Pool at Fukushima Daiichi - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"The Tokyo Electric Power Co. (TEPCO), the owner of the facility, had taken various precautionary steps against risks experienced during the removal. Those included investigating the conditions inside the pool, designing a special machine to lift the large debris, and testing that on a mock-up of the debris. It also held meetings with local citizens,","canonical_url":"https:\/\/www.jaif.or.jp\/en\/news\/fukushima\/1362","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.jaif.or.jp\/en\/news\/fukushima\/1362#blogposting","name":"Fuel Handling Machine Removed from Unit 3 Spent Fuel Pool at Fukushima Daiichi - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","headline":"Fuel Handling Machine Removed from Unit 3 Spent Fuel Pool at Fukushima Daiichi","author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/08\/\u71c3\u6599\u4ea4\u63db\u6a5f\u540a\u4e0a-e1438665546614.jpg","width":310,"height":225},"datePublished":"2015-08-04T14:25:02+09:00","dateModified":"2015-08-19T11:01:24+09:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/fukushima\/1362#webpage"},"isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/fukushima\/1362#webpage"},"articleSection":"Fukushima, decommissioning, fuel debris, fuel removal, Fukushima Daiichi-3, TEPCO, Toshiba"},{"@type":"BreadcrumbList","@id":"https:\/\/www.jaif.or.jp\/en\/news\/fukushima\/1362#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.jaif.or.jp\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","position":2,"name":"News","item":"https:\/\/www.jaif.or.jp\/en\/news","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/fukushima#listItem","name":"Fukushima"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/fukushima#listItem","position":3,"name":"Fukushima","item":"https:\/\/www.jaif.or.jp\/en\/news\/fukushima","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/fukushima\/1362#listItem","name":"Fuel Handling Machine Removed from Unit 3 Spent Fuel Pool at Fukushima Daiichi"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/fukushima\/1362#listItem","position":4,"name":"Fuel Handling Machine Removed from Unit 3 Spent Fuel Pool at Fukushima Daiichi","previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/fukushima#listItem","name":"Fukushima"}}]},{"@type":"Organization","@id":"https:\/\/www.jaif.or.jp\/en\/#organization","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","url":"https:\/\/www.jaif.or.jp\/en\/"},{"@type":"Person","@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author","url":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno","name":"Kaoru Ohno"},{"@type":"WebPage","@id":"https:\/\/www.jaif.or.jp\/en\/news\/fukushima\/1362#webpage","url":"https:\/\/www.jaif.or.jp\/en\/news\/fukushima\/1362","name":"Fuel Handling Machine Removed from Unit 3 Spent Fuel Pool at Fukushima Daiichi - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"The Tokyo Electric Power Co. (TEPCO), the owner of the facility, had taken various precautionary steps against risks experienced during the removal. Those included investigating the conditions inside the pool, designing a special machine to lift the large debris, and testing that on a mock-up of the debris. It also held meetings with local citizens,","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/fukushima\/1362#breadcrumblist"},"author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"creator":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/08\/\u71c3\u6599\u4ea4\u63db\u6a5f\u540a\u4e0a-e1438665546614.jpg","@id":"https:\/\/www.jaif.or.jp\/en\/news\/fukushima\/1362\/#mainImage","width":310,"height":225},"primaryImageOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/fukushima\/1362#mainImage"},"datePublished":"2015-08-04T14:25:02+09:00","dateModified":"2015-08-19T11:01:24+09:00"},{"@type":"WebSite","@id":"https:\/\/www.jaif.or.jp\/en\/#website","url":"https:\/\/www.jaif.or.jp\/en\/","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:type":"article","og:title":"Fuel Handling Machine Removed from Unit 3 Spent Fuel Pool at Fukushima Daiichi - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:description":"The Tokyo Electric Power Co. (TEPCO), the owner of the facility, had taken various precautionary steps against risks experienced during the removal. Those included investigating the conditions inside the pool, designing a special machine to lift the large debris, and testing that on a mock-up of the debris. It also held meetings with local citizens,","og:url":"https:\/\/www.jaif.or.jp\/en\/news\/fukushima\/1362","og:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/08\/\u71c3\u6599\u4ea4\u63db\u6a5f\u540a\u4e0a-e1438665546614.jpg","og:image:secure_url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/08\/\u71c3\u6599\u4ea4\u63db\u6a5f\u540a\u4e0a-e1438665546614.jpg","og:image:width":310,"og:image:height":225,"article:published_time":"2015-08-04T05:25:02+00:00","article:modified_time":"2015-08-19T02:01:24+00:00","twitter:card":"summary_large_image","twitter:site":"@Atoms_in_Japan","twitter:title":"Fuel Handling Machine Removed from Unit 3 Spent Fuel Pool at Fukushima Daiichi - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","twitter:description":"The Tokyo Electric Power Co. (TEPCO), the owner of the facility, had taken various precautionary steps against risks experienced during the removal. Those included investigating the conditions inside the pool, designing a special machine to lift the large debris, and testing that on a mock-up of the debris. It also held meetings with local citizens,","twitter:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/08\/\u71c3\u6599\u4ea4\u63db\u6a5f\u540a\u4e0a-e1438665546614.jpg"},"aioseo_meta_data":{"post_id":"1362","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"limit_modified_date":false,"created":"2022-04-29 13:27:16","updated":"2026-10-29 00:10:49","focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\" title=\"News\">News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\/fukushima\" title=\"Fukushima\">Fukushima<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tFuel Handling Machine Removed from Unit 3 Spent Fuel Pool at Fukushima Daiichi\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.jaif.or.jp\/en\/"},{"label":"News","link":"https:\/\/www.jaif.or.jp\/en\/news"},{"label":"Fukushima","link":"https:\/\/www.jaif.or.jp\/en\/news\/fukushima"},{"label":"Fuel Handling Machine Removed from Unit 3 Spent Fuel Pool at Fukushima Daiichi","link":"https:\/\/www.jaif.or.jp\/en\/news\/fukushima\/1362"}],"_links":{"self":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/1362","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/comments?post=1362"}],"version-history":[{"count":1,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/1362\/revisions"}],"predecessor-version":[{"id":1365,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/1362\/revisions\/1365"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media\/1364"}],"wp:attachment":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media?parent=1362"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/categories?post=1362"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/tags?post=1362"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}