{"id":1410,"date":"2015-08-19T10:59:44","date_gmt":"2015-08-19T01:59:44","guid":{"rendered":"http:\/\/www.jaif.or.jp\/en\/?p=1410"},"modified":"2015-09-25T14:17:54","modified_gmt":"2015-09-25T05:17:54","slug":"nra-begins-pre-service-inspections-on-takahama-3","status":"publish","type":"post","link":"https:\/\/www.jaif.or.jp\/en\/news\/1410","title":{"rendered":"NRA Begins Pre-service Inspections on Takahama-3"},"content":{"rendered":"<p>The reactor had been certified in February 12 of this year for meeting newly-established regulatory standards, thereby getting permission for its NPP basic design to be altered. After that, the construction work plans for equipment and facilities at the plant were approved on August 4.<\/p>\n<p>The pre-service inspections, which aim to confirm whether or not the safety countermeasures taken actually follow what was in the approved plan, must be cleared before the reactor can be restarted. The outlook is for the commercial operation of <a href=\"https:\/\/www.jaif.or.jp\/en-renew\/npps\/takahama-3\/\" target=\"_blank\">Takahama-3<\/a> to resume around mid-November.<\/p>\n<p>In a press conference held by the NRA on August 18, reporters queried about the schedules for inspections at Takahama-3. According to <a href=\"https:\/\/www.jaif.or.jp\/en-renew\/owner\/kansai_epco\/\" target=\"_blank\">the Kansai Electric Power<\/a>, those are not expected to take as much time as those for <a href=\"https:\/\/www.jaif.or.jp\/en-renew\/npps\/sendai-1\/\" target=\"_blank\">Sendai-1<\/a> of <a href=\"https:\/\/www.jaif.or.jp\/en-renew\/owner\/kyushu_epco\/\" target=\"_blank\">the Kyushu Electric Power Co.<\/a>, which resumed power generation on August 14. In response, the NRA representatives said they would, to the last, deal with the matter without holding any preconceptions.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The reactor had been certified in February 12 of this year for meeting newly-established regulatory standards, thereby getting permission for its NPP basic design to be altered. After that, the construction work plans for equipment and facilities at the plant were approved on August 4. The pre-service inspections, which aim to confirm whether or not [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":945,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1,6,7],"tags":[20,19,313,18,284],"class_list":["post-1410","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-npps","category-regulation-safety","tag-kansai","tag-nra","tag-pre-service-inspection","tag-restart","tag-takahama-3"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.5.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"The reactor had been certified in February 12 of this year for meeting newly-established regulatory standards, thereby getting permission for its NPP basic design to be altered. After that, the construction work plans for equipment and facilities at the plant were approved on August 4. The pre-service inspections, which aim to confirm whether or not\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Kaoru Ohno\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.jaif.or.jp\/en\/news\/1410\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.5.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"NRA Begins Pre-service Inspections on Takahama-3 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:description\" content=\"The reactor had been certified in February 12 of this year for meeting newly-established regulatory standards, thereby getting permission for its NPP basic design to be altered. After that, the construction work plans for equipment and facilities at the plant were approved on August 4. The pre-service inspections, which aim to confirm whether or not\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.jaif.or.jp\/en\/news\/1410\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/04\/\u9ad8\u6d5c34\u30ab\u30e9\u30fc-e1429065622370.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/04\/\u9ad8\u6d5c34\u30ab\u30e9\u30fc-e1429065622370.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"310\" \/>\n\t\t<meta property=\"og:image:height\" content=\"250\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2015-08-19T01:59:44+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2015-09-25T05:17:54+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@Atoms_in_Japan\" \/>\n\t\t<meta name=\"twitter:title\" content=\"NRA Begins Pre-service Inspections on Takahama-3 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta name=\"twitter:description\" content=\"The reactor had been certified in February 12 of this year for meeting newly-established regulatory standards, thereby getting permission for its NPP basic design to be altered. After that, the construction work plans for equipment and facilities at the plant were approved on August 4. The pre-service inspections, which aim to confirm whether or not\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/04\/\u9ad8\u6d5c34\u30ab\u30e9\u30fc-e1429065622370.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1410#blogposting\",\"name\":\"NRA Begins Pre-service Inspections on Takahama-3 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"headline\":\"NRA Begins Pre-service Inspections on Takahama-3\",\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/wp-content\\\/uploads\\\/2015\\\/04\\\/\\u9ad8\\u6d5c34\\u30ab\\u30e9\\u30fc-e1429065622370.jpg\",\"width\":310,\"height\":250,\"caption\":\"Takahama-3&4\"},\"datePublished\":\"2015-08-19T10:59:44+09:00\",\"dateModified\":\"2015-09-25T14:17:54+09:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1410#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1410#webpage\"},\"articleSection\":\"News, NPPs, Regulation &amp; Safety, Kansai, NRA, pre-service inspection, restart, Takahama-3\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1410#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"position\":2,\"name\":\"News\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"position\":3,\"name\":\"NPPs\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1410#listItem\",\"name\":\"NRA Begins Pre-service Inspections on Takahama-3\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1410#listItem\",\"position\":4,\"name\":\"NRA Begins Pre-service Inspections on Takahama-3\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno\",\"name\":\"Kaoru Ohno\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1410#webpage\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1410\",\"name\":\"NRA Begins Pre-service Inspections on Takahama-3 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"description\":\"The reactor had been certified in February 12 of this year for meeting newly-established regulatory standards, thereby getting permission for its NPP basic design to be altered. After that, the construction work plans for equipment and facilities at the plant were approved on August 4. The pre-service inspections, which aim to confirm whether or not\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1410#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/wp-content\\\/uploads\\\/2015\\\/04\\\/\\u9ad8\\u6d5c34\\u30ab\\u30e9\\u30fc-e1429065622370.jpg\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1410\\\/#mainImage\",\"width\":310,\"height\":250,\"caption\":\"Takahama-3&4\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1410#mainImage\"},\"datePublished\":\"2015-08-19T10:59:44+09:00\",\"dateModified\":\"2015-09-25T14:17:54+09:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"NRA Begins Pre-service Inspections on Takahama-3 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"The reactor had been certified in February 12 of this year for meeting newly-established regulatory standards, thereby getting permission for its NPP basic design to be altered. After that, the construction work plans for equipment and facilities at the plant were approved on August 4. The pre-service inspections, which aim to confirm whether or not","canonical_url":"https:\/\/www.jaif.or.jp\/en\/news\/1410","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1410#blogposting","name":"NRA Begins Pre-service Inspections on Takahama-3 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","headline":"NRA Begins Pre-service Inspections on Takahama-3","author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/04\/\u9ad8\u6d5c34\u30ab\u30e9\u30fc-e1429065622370.jpg","width":310,"height":250,"caption":"Takahama-3&4"},"datePublished":"2015-08-19T10:59:44+09:00","dateModified":"2015-09-25T14:17:54+09:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/1410#webpage"},"isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/1410#webpage"},"articleSection":"News, NPPs, Regulation &amp; Safety, Kansai, NRA, pre-service inspection, restart, Takahama-3"},{"@type":"BreadcrumbList","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1410#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.jaif.or.jp\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","position":2,"name":"News","item":"https:\/\/www.jaif.or.jp\/en\/news","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","position":3,"name":"NPPs","item":"https:\/\/www.jaif.or.jp\/en\/news\/npps","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1410#listItem","name":"NRA Begins Pre-service Inspections on Takahama-3"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1410#listItem","position":4,"name":"NRA Begins Pre-service Inspections on Takahama-3","previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"}}]},{"@type":"Organization","@id":"https:\/\/www.jaif.or.jp\/en\/#organization","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","url":"https:\/\/www.jaif.or.jp\/en\/"},{"@type":"Person","@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author","url":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno","name":"Kaoru Ohno"},{"@type":"WebPage","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1410#webpage","url":"https:\/\/www.jaif.or.jp\/en\/news\/1410","name":"NRA Begins Pre-service Inspections on Takahama-3 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"The reactor had been certified in February 12 of this year for meeting newly-established regulatory standards, thereby getting permission for its NPP basic design to be altered. After that, the construction work plans for equipment and facilities at the plant were approved on August 4. The pre-service inspections, which aim to confirm whether or not","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/1410#breadcrumblist"},"author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"creator":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/04\/\u9ad8\u6d5c34\u30ab\u30e9\u30fc-e1429065622370.jpg","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1410\/#mainImage","width":310,"height":250,"caption":"Takahama-3&4"},"primaryImageOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/1410#mainImage"},"datePublished":"2015-08-19T10:59:44+09:00","dateModified":"2015-09-25T14:17:54+09:00"},{"@type":"WebSite","@id":"https:\/\/www.jaif.or.jp\/en\/#website","url":"https:\/\/www.jaif.or.jp\/en\/","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:type":"article","og:title":"NRA Begins Pre-service Inspections on Takahama-3 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:description":"The reactor had been certified in February 12 of this year for meeting newly-established regulatory standards, thereby getting permission for its NPP basic design to be altered. After that, the construction work plans for equipment and facilities at the plant were approved on August 4. The pre-service inspections, which aim to confirm whether or not","og:url":"https:\/\/www.jaif.or.jp\/en\/news\/1410","og:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/04\/\u9ad8\u6d5c34\u30ab\u30e9\u30fc-e1429065622370.jpg","og:image:secure_url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/04\/\u9ad8\u6d5c34\u30ab\u30e9\u30fc-e1429065622370.jpg","og:image:width":310,"og:image:height":250,"article:published_time":"2015-08-19T01:59:44+00:00","article:modified_time":"2015-09-25T05:17:54+00:00","twitter:card":"summary_large_image","twitter:site":"@Atoms_in_Japan","twitter:title":"NRA Begins Pre-service Inspections on Takahama-3 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","twitter:description":"The reactor had been certified in February 12 of this year for meeting newly-established regulatory standards, thereby getting permission for its NPP basic design to be altered. After that, the construction work plans for equipment and facilities at the plant were approved on August 4. The pre-service inspections, which aim to confirm whether or not","twitter:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/04\/\u9ad8\u6d5c34\u30ab\u30e9\u30fc-e1429065622370.jpg"},"aioseo_meta_data":{"post_id":"1410","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"limit_modified_date":false,"created":"2022-04-29 13:28:18","updated":"2026-10-29 00:12:59","focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\" title=\"News\">News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\/npps\" title=\"NPPs\">NPPs<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tNRA Begins Pre-service Inspections on Takahama-3\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.jaif.or.jp\/en\/"},{"label":"News","link":"https:\/\/www.jaif.or.jp\/en\/news"},{"label":"NPPs","link":"https:\/\/www.jaif.or.jp\/en\/news\/npps"},{"label":"NRA Begins Pre-service Inspections on Takahama-3","link":"https:\/\/www.jaif.or.jp\/en\/news\/1410"}],"_links":{"self":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/1410","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/comments?post=1410"}],"version-history":[{"count":1,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/1410\/revisions"}],"predecessor-version":[{"id":1411,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/1410\/revisions\/1411"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media\/945"}],"wp:attachment":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media?parent=1410"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/categories?post=1410"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/tags?post=1410"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}