{"id":1427,"date":"2015-09-01T16:33:32","date_gmt":"2015-09-01T07:33:32","guid":{"rendered":"http:\/\/www.jaif.or.jp\/en\/?p=1427"},"modified":"2015-09-01T16:45:25","modified_gmt":"2015-09-01T07:45:25","slug":"electricity-supply-and-demand-outlook-is-revised-upon-full-operation-of-sendai-1","status":"publish","type":"post","link":"https:\/\/www.jaif.or.jp\/en\/news\/1427","title":{"rendered":"Electricity Supply and Demand Outlook is Revised upon Full Operation of Sendai-1"},"content":{"rendered":"<p>According to an electricity supply-demand projection for this summer formulated by the Advisory Committee for Natural Resources and Energy in April, the capacity reserve margin in the service area of the Kyushu Electric Power Co. was expected to be a negative 1.5% in September without power accommodations from another electric power companies, even taking into account energy conservation efforts and introduction of solar and other renewable energies.<\/p>\n<p>With Sendai-1 NPP back in service, the company on its own is expected to secure a capacity reserve margin of 6.7%. According to a trial calculation, Kyushu Electric Power\u2019s supply capacity for its service area in September has increased from 15.32 GWe (including accommodation power) to 15.86 GWe.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>According to an electricity supply-demand projection for this summer formulated by the Advisory Committee for Natural Resources and Energy in April, the capacity reserve margin in the service area of the Kyushu Electric Power Co. was expected to be a negative 1.5% in September without power accommodations from another electric power companies, even taking into [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1,6],"tags":[37],"class_list":["post-1427","post","type-post","status-publish","format-standard","hentry","category-news","category-npps","tag-kyushu"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.4 - aioseo.com -->\n\t<meta name=\"description\" content=\"According to an electricity supply-demand projection for this summer formulated by the Advisory Committee for Natural Resources and Energy in April, the capacity reserve margin in the service area of the Kyushu Electric Power Co. was expected to be a negative 1.5% in September without power accommodations from another electric power companies, even taking into\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Kaoru Ohno\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.jaif.or.jp\/en\/news\/1427\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.4\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Electricity Supply and Demand Outlook is Revised upon Full Operation of Sendai-1 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:description\" content=\"According to an electricity supply-demand projection for this summer formulated by the Advisory Committee for Natural Resources and Energy in April, the capacity reserve margin in the service area of the Kyushu Electric Power Co. was expected to be a negative 1.5% in September without power accommodations from another electric power companies, even taking into\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.jaif.or.jp\/en\/news\/1427\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2022\/04\/dummy-scaled.webp\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2022\/04\/dummy-scaled.webp\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2015-09-01T07:33:32+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2015-09-01T07:45:25+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@Atoms_in_Japan\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Electricity Supply and Demand Outlook is Revised upon Full Operation of Sendai-1 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta name=\"twitter:description\" content=\"According to an electricity supply-demand projection for this summer formulated by the Advisory Committee for Natural Resources and Energy in April, the capacity reserve margin in the service area of the Kyushu Electric Power Co. was expected to be a negative 1.5% in September without power accommodations from another electric power companies, even taking into\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2022\/04\/dummy-scaled.webp\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1427#blogposting\",\"name\":\"Electricity Supply and Demand Outlook is Revised upon Full Operation of Sendai-1 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"headline\":\"Electricity Supply and Demand Outlook is Revised upon Full Operation of Sendai-1\",\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"},\"datePublished\":\"2015-09-01T16:33:32+09:00\",\"dateModified\":\"2015-09-01T16:45:25+09:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1427#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1427#webpage\"},\"articleSection\":\"News, NPPs, Kyushu\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1427#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"position\":2,\"name\":\"News\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"position\":3,\"name\":\"NPPs\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1427#listItem\",\"name\":\"Electricity Supply and Demand Outlook is Revised upon Full Operation of Sendai-1\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1427#listItem\",\"position\":4,\"name\":\"Electricity Supply and Demand Outlook is Revised upon Full Operation of Sendai-1\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno\",\"name\":\"Kaoru Ohno\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1427#webpage\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1427\",\"name\":\"Electricity Supply and Demand Outlook is Revised upon Full Operation of Sendai-1 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"description\":\"According to an electricity supply-demand projection for this summer formulated by the Advisory Committee for Natural Resources and Energy in April, the capacity reserve margin in the service area of the Kyushu Electric Power Co. was expected to be a negative 1.5% in September without power accommodations from another electric power companies, even taking into\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1427#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"datePublished\":\"2015-09-01T16:33:32+09:00\",\"dateModified\":\"2015-09-01T16:45:25+09:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Electricity Supply and Demand Outlook is Revised upon Full Operation of Sendai-1 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"According to an electricity supply-demand projection for this summer formulated by the Advisory Committee for Natural Resources and Energy in April, the capacity reserve margin in the service area of the Kyushu Electric Power Co. was expected to be a negative 1.5% in September without power accommodations from another electric power companies, even taking into","canonical_url":"https:\/\/www.jaif.or.jp\/en\/news\/1427","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1427#blogposting","name":"Electricity Supply and Demand Outlook is Revised upon Full Operation of Sendai-1 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","headline":"Electricity Supply and Demand Outlook is Revised upon Full Operation of Sendai-1","author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"},"datePublished":"2015-09-01T16:33:32+09:00","dateModified":"2015-09-01T16:45:25+09:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/1427#webpage"},"isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/1427#webpage"},"articleSection":"News, NPPs, Kyushu"},{"@type":"BreadcrumbList","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1427#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.jaif.or.jp\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","position":2,"name":"News","item":"https:\/\/www.jaif.or.jp\/en\/news","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","position":3,"name":"NPPs","item":"https:\/\/www.jaif.or.jp\/en\/news\/npps","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1427#listItem","name":"Electricity Supply and Demand Outlook is Revised upon Full Operation of Sendai-1"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1427#listItem","position":4,"name":"Electricity Supply and Demand Outlook is Revised upon Full Operation of Sendai-1","previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"}}]},{"@type":"Organization","@id":"https:\/\/www.jaif.or.jp\/en\/#organization","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","url":"https:\/\/www.jaif.or.jp\/en\/"},{"@type":"Person","@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author","url":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno","name":"Kaoru Ohno"},{"@type":"WebPage","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1427#webpage","url":"https:\/\/www.jaif.or.jp\/en\/news\/1427","name":"Electricity Supply and Demand Outlook is Revised upon Full Operation of Sendai-1 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"According to an electricity supply-demand projection for this summer formulated by the Advisory Committee for Natural Resources and Energy in April, the capacity reserve margin in the service area of the Kyushu Electric Power Co. was expected to be a negative 1.5% in September without power accommodations from another electric power companies, even taking into","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/1427#breadcrumblist"},"author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"creator":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"datePublished":"2015-09-01T16:33:32+09:00","dateModified":"2015-09-01T16:45:25+09:00"},{"@type":"WebSite","@id":"https:\/\/www.jaif.or.jp\/en\/#website","url":"https:\/\/www.jaif.or.jp\/en\/","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:type":"article","og:title":"Electricity Supply and Demand Outlook is Revised upon Full Operation of Sendai-1 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:description":"According to an electricity supply-demand projection for this summer formulated by the Advisory Committee for Natural Resources and Energy in April, the capacity reserve margin in the service area of the Kyushu Electric Power Co. was expected to be a negative 1.5% in September without power accommodations from another electric power companies, even taking into","og:url":"https:\/\/www.jaif.or.jp\/en\/news\/1427","og:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2022\/04\/dummy-scaled.webp","og:image:secure_url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2022\/04\/dummy-scaled.webp","article:published_time":"2015-09-01T07:33:32+00:00","article:modified_time":"2015-09-01T07:45:25+00:00","twitter:card":"summary_large_image","twitter:site":"@Atoms_in_Japan","twitter:title":"Electricity Supply and Demand Outlook is Revised upon Full Operation of Sendai-1 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","twitter:description":"According to an electricity supply-demand projection for this summer formulated by the Advisory Committee for Natural Resources and Energy in April, the capacity reserve margin in the service area of the Kyushu Electric Power Co. was expected to be a negative 1.5% in September without power accommodations from another electric power companies, even taking into","twitter:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2022\/04\/dummy-scaled.webp"},"aioseo_meta_data":{"post_id":"1427","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"limit_modified_date":false,"created":"2022-04-29 13:28:18","updated":"2026-10-29 00:12:59","focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\" title=\"News\">News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\/npps\" title=\"NPPs\">NPPs<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tElectricity Supply and Demand Outlook is Revised upon Full Operation of Sendai-1\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.jaif.or.jp\/en\/"},{"label":"News","link":"https:\/\/www.jaif.or.jp\/en\/news"},{"label":"NPPs","link":"https:\/\/www.jaif.or.jp\/en\/news\/npps"},{"label":"Electricity Supply and Demand Outlook is Revised upon Full Operation of Sendai-1","link":"https:\/\/www.jaif.or.jp\/en\/news\/1427"}],"_links":{"self":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/1427","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/comments?post=1427"}],"version-history":[{"count":1,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/1427\/revisions"}],"predecessor-version":[{"id":1428,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/1427\/revisions\/1428"}],"wp:attachment":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media?parent=1427"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/categories?post=1427"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/tags?post=1427"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}