{"id":1610,"date":"2015-11-19T05:30:23","date_gmt":"2015-11-19T05:30:23","guid":{"rendered":"http:\/\/www.jaif.or.jp\/en\/?p=1610"},"modified":"2015-12-10T04:04:08","modified_gmt":"2015-12-10T04:04:08","slug":"sendai-2-returns-to-normal-operation","status":"publish","type":"post","link":"https:\/\/www.jaif.or.jp\/en\/news\/1610","title":{"rendered":"Sendai-2 Returns to Normal Operation"},"content":{"rendered":"<p>This is the second NPP in the country, following its sister reactor Sendai-1, to clear the new regulatory standards.<\/p>\n<p>Toward resuming the operation of the two units, Kyushu Electric Power applied to the NRA in July 2013 for examinations to be held to confirm their compatibility with the new regulatory standards. As the units were designated as NPPs to be examined \u201cwith priority,\u201d their examinations were carried out intensively, with permission granted for changes to their reactor installations related to basic design on September 10, 2014.<\/p>\n<p>One year later, on September 10, 2015, Sendai-1 resumed commercial operation. On October 15, then, <a href=\"https:\/\/www.jaif.or.jp\/en-renew\/sendai-2-restarted\/\" target=\"_blank\">Sendai-2 was started up<\/a>, and <a href=\"https:\/\/www.jaif.or.jp\/en-renew\/sendai-2-resumes-power-generation\/\" target=\"_blank\">resumed power generation<\/a> six days later, on October 21.<\/p>\n<p>Besides those two units, Ikata-3, owned and operated by the Shikoku Electric Power Co., and Takahama-3 and -4, owned and operated by the Kansai Electric Power Co., have received permission for their basic designs to be changed. Another 21 reactors are also undergoing similar examinations of compatibility with the new regulatory standards.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>This is the second NPP in the country, following its sister reactor Sendai-1, to clear the new regulatory standards. Toward resuming the operation of the two units, Kyushu Electric Power applied to the NRA in July 2013 for examinations to be held to confirm their compatibility with the new regulatory standards. As the units were [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":899,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1,6,7],"tags":[37,19,18,271,286],"class_list":["post-1610","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-npps","category-regulation-safety","tag-kyushu","tag-nra","tag-restart","tag-sendai-1","tag-sendai-2"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.5.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"This is the second NPP in the country, following its sister reactor Sendai-1, to clear the new regulatory standards. Toward resuming the operation of the two units, Kyushu Electric Power applied to the NRA in July 2013 for examinations to be held to confirm their compatibility with the new regulatory standards. As the units were\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Kaoru Ohno\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.jaif.or.jp\/en\/news\/1610\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.5.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Sendai-2 Returns to Normal Operation - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:description\" content=\"This is the second NPP in the country, following its sister reactor Sendai-1, to clear the new regulatory standards. Toward resuming the operation of the two units, Kyushu Electric Power applied to the NRA in July 2013 for examinations to be held to confirm their compatibility with the new regulatory standards. As the units were\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.jaif.or.jp\/en\/news\/1610\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/04\/\u5ddd\u5185\u539f\u5b50\u529b\u767a\u96fb\u6240071019-e1428025298795.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/04\/\u5ddd\u5185\u539f\u5b50\u529b\u767a\u96fb\u6240071019-e1428025298795.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"310\" \/>\n\t\t<meta property=\"og:image:height\" content=\"218\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2015-11-19T05:30:23+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2015-12-10T04:04:08+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@Atoms_in_Japan\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Sendai-2 Returns to Normal Operation - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta name=\"twitter:description\" content=\"This is the second NPP in the country, following its sister reactor Sendai-1, to clear the new regulatory standards. Toward resuming the operation of the two units, Kyushu Electric Power applied to the NRA in July 2013 for examinations to be held to confirm their compatibility with the new regulatory standards. As the units were\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/04\/\u5ddd\u5185\u539f\u5b50\u529b\u767a\u96fb\u6240071019-e1428025298795.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1610#blogposting\",\"name\":\"Sendai-2 Returns to Normal Operation - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"headline\":\"Sendai-2 Returns to Normal Operation\",\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/wp-content\\\/uploads\\\/2015\\\/04\\\/\\u5ddd\\u5185\\u539f\\u5b50\\u529b\\u767a\\u96fb\\u6240071019-e1428025298795.jpg\",\"width\":310,\"height\":218,\"caption\":\"Sendai NPPs\"},\"datePublished\":\"2015-11-19T05:30:23+09:00\",\"dateModified\":\"2015-12-10T04:04:08+09:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1610#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1610#webpage\"},\"articleSection\":\"News, NPPs, Regulation &amp; Safety, Kyushu, NRA, restart, Sendai-1, Sendai-2\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1610#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"position\":2,\"name\":\"News\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"position\":3,\"name\":\"NPPs\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1610#listItem\",\"name\":\"Sendai-2 Returns to Normal Operation\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1610#listItem\",\"position\":4,\"name\":\"Sendai-2 Returns to Normal Operation\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno\",\"name\":\"Kaoru Ohno\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1610#webpage\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1610\",\"name\":\"Sendai-2 Returns to Normal Operation - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"description\":\"This is the second NPP in the country, following its sister reactor Sendai-1, to clear the new regulatory standards. Toward resuming the operation of the two units, Kyushu Electric Power applied to the NRA in July 2013 for examinations to be held to confirm their compatibility with the new regulatory standards. As the units were\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1610#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/wp-content\\\/uploads\\\/2015\\\/04\\\/\\u5ddd\\u5185\\u539f\\u5b50\\u529b\\u767a\\u96fb\\u6240071019-e1428025298795.jpg\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1610\\\/#mainImage\",\"width\":310,\"height\":218,\"caption\":\"Sendai NPPs\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1610#mainImage\"},\"datePublished\":\"2015-11-19T05:30:23+09:00\",\"dateModified\":\"2015-12-10T04:04:08+09:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Sendai-2 Returns to Normal Operation - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"This is the second NPP in the country, following its sister reactor Sendai-1, to clear the new regulatory standards. Toward resuming the operation of the two units, Kyushu Electric Power applied to the NRA in July 2013 for examinations to be held to confirm their compatibility with the new regulatory standards. As the units were","canonical_url":"https:\/\/www.jaif.or.jp\/en\/news\/1610","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1610#blogposting","name":"Sendai-2 Returns to Normal Operation - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","headline":"Sendai-2 Returns to Normal Operation","author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/04\/\u5ddd\u5185\u539f\u5b50\u529b\u767a\u96fb\u6240071019-e1428025298795.jpg","width":310,"height":218,"caption":"Sendai NPPs"},"datePublished":"2015-11-19T05:30:23+09:00","dateModified":"2015-12-10T04:04:08+09:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/1610#webpage"},"isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/1610#webpage"},"articleSection":"News, NPPs, Regulation &amp; Safety, Kyushu, NRA, restart, Sendai-1, Sendai-2"},{"@type":"BreadcrumbList","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1610#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.jaif.or.jp\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","position":2,"name":"News","item":"https:\/\/www.jaif.or.jp\/en\/news","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","position":3,"name":"NPPs","item":"https:\/\/www.jaif.or.jp\/en\/news\/npps","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1610#listItem","name":"Sendai-2 Returns to Normal Operation"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1610#listItem","position":4,"name":"Sendai-2 Returns to Normal Operation","previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"}}]},{"@type":"Organization","@id":"https:\/\/www.jaif.or.jp\/en\/#organization","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","url":"https:\/\/www.jaif.or.jp\/en\/"},{"@type":"Person","@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author","url":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno","name":"Kaoru Ohno"},{"@type":"WebPage","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1610#webpage","url":"https:\/\/www.jaif.or.jp\/en\/news\/1610","name":"Sendai-2 Returns to Normal Operation - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"This is the second NPP in the country, following its sister reactor Sendai-1, to clear the new regulatory standards. Toward resuming the operation of the two units, Kyushu Electric Power applied to the NRA in July 2013 for examinations to be held to confirm their compatibility with the new regulatory standards. As the units were","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/1610#breadcrumblist"},"author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"creator":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/04\/\u5ddd\u5185\u539f\u5b50\u529b\u767a\u96fb\u6240071019-e1428025298795.jpg","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1610\/#mainImage","width":310,"height":218,"caption":"Sendai NPPs"},"primaryImageOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/1610#mainImage"},"datePublished":"2015-11-19T05:30:23+09:00","dateModified":"2015-12-10T04:04:08+09:00"},{"@type":"WebSite","@id":"https:\/\/www.jaif.or.jp\/en\/#website","url":"https:\/\/www.jaif.or.jp\/en\/","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:type":"article","og:title":"Sendai-2 Returns to Normal Operation - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:description":"This is the second NPP in the country, following its sister reactor Sendai-1, to clear the new regulatory standards. Toward resuming the operation of the two units, Kyushu Electric Power applied to the NRA in July 2013 for examinations to be held to confirm their compatibility with the new regulatory standards. As the units were","og:url":"https:\/\/www.jaif.or.jp\/en\/news\/1610","og:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/04\/\u5ddd\u5185\u539f\u5b50\u529b\u767a\u96fb\u6240071019-e1428025298795.jpg","og:image:secure_url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/04\/\u5ddd\u5185\u539f\u5b50\u529b\u767a\u96fb\u6240071019-e1428025298795.jpg","og:image:width":310,"og:image:height":218,"article:published_time":"2015-11-19T05:30:23+00:00","article:modified_time":"2015-12-10T04:04:08+00:00","twitter:card":"summary_large_image","twitter:site":"@Atoms_in_Japan","twitter:title":"Sendai-2 Returns to Normal Operation - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","twitter:description":"This is the second NPP in the country, following its sister reactor Sendai-1, to clear the new regulatory standards. Toward resuming the operation of the two units, Kyushu Electric Power applied to the NRA in July 2013 for examinations to be held to confirm their compatibility with the new regulatory standards. As the units were","twitter:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/04\/\u5ddd\u5185\u539f\u5b50\u529b\u767a\u96fb\u6240071019-e1428025298795.jpg"},"aioseo_meta_data":{"post_id":"1610","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"limit_modified_date":false,"created":"2022-04-29 13:32:15","updated":"2026-10-29 00:19:46","focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\" title=\"News\">News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\/npps\" title=\"NPPs\">NPPs<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tSendai-2 Returns to Normal Operation\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.jaif.or.jp\/en\/"},{"label":"News","link":"https:\/\/www.jaif.or.jp\/en\/news"},{"label":"NPPs","link":"https:\/\/www.jaif.or.jp\/en\/news\/npps"},{"label":"Sendai-2 Returns to Normal Operation","link":"https:\/\/www.jaif.or.jp\/en\/news\/1610"}],"_links":{"self":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/1610","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/comments?post=1610"}],"version-history":[{"count":3,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/1610\/revisions"}],"predecessor-version":[{"id":1613,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/1610\/revisions\/1613"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media\/899"}],"wp:attachment":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media?parent=1610"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/categories?post=1610"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/tags?post=1610"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}