{"id":1724,"date":"2015-12-28T01:32:55","date_gmt":"2015-12-28T01:32:55","guid":{"rendered":"http:\/\/www.jaif.or.jp\/en\/?p=1724"},"modified":"2016-01-22T04:26:12","modified_gmt":"2016-01-22T04:26:12","slug":"fuel-being-loaded-into-takahama-3-npp","status":"publish","type":"post","link":"https:\/\/www.jaif.or.jp\/en\/news\/1724","title":{"rendered":"Fuel Being Loaded into Takahama-3 NPP"},"content":{"rendered":"<p>When the fuel loading is complete, Kansai EP will receive a pre-service inspection of post-loading portions of the unit. The company expects to start up the reactor at the end of January 2016, connect it to the grid in early February, and resume commercial operation at the end of February.<\/p>\n<p>Of the total 157 fuel assemblies to be loaded, 68 will be fresh fuel and 89 will be recycled (partially burned) assemblies. Among the total, 24 will be the uranium-plutonium mixed oxide (MOX) fuel assemblies (16 fresh and 8 recycled). The loading operation is being carried out around the clock by thirteen workers in three shifts.<\/p>\n<p>As for the Takahama-4 (PWR, 870MWe), Kansai EP intends to start up the reactor at the end of February and resume commercial operation at the end of March.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>When the fuel loading is complete, Kansai EP will receive a pre-service inspection of post-loading portions of the unit. The company expects to start up the reactor at the end of January 2016, connect it to the grid in early February, and resume commercial operation at the end of February. Of the total 157 fuel [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":945,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1,6],"tags":[20,342,18,284,285],"class_list":["post-1724","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-npps","tag-kansai","tag-mox","tag-restart","tag-takahama-3","tag-takahama-4"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.4 - aioseo.com -->\n\t<meta name=\"description\" content=\"When the fuel loading is complete, Kansai EP will receive a pre-service inspection of post-loading portions of the unit. The company expects to start up the reactor at the end of January 2016, connect it to the grid in early February, and resume commercial operation at the end of February. Of the total 157 fuel\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Kaoru Ohno\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.jaif.or.jp\/en\/news\/1724\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.4\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Fuel Being Loaded into Takahama-3 NPP - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:description\" content=\"When the fuel loading is complete, Kansai EP will receive a pre-service inspection of post-loading portions of the unit. The company expects to start up the reactor at the end of January 2016, connect it to the grid in early February, and resume commercial operation at the end of February. Of the total 157 fuel\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.jaif.or.jp\/en\/news\/1724\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/04\/\u9ad8\u6d5c34\u30ab\u30e9\u30fc-e1429065622370.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/04\/\u9ad8\u6d5c34\u30ab\u30e9\u30fc-e1429065622370.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"310\" \/>\n\t\t<meta property=\"og:image:height\" content=\"250\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2015-12-28T01:32:55+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2016-01-22T04:26:12+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@Atoms_in_Japan\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Fuel Being Loaded into Takahama-3 NPP - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta name=\"twitter:description\" content=\"When the fuel loading is complete, Kansai EP will receive a pre-service inspection of post-loading portions of the unit. The company expects to start up the reactor at the end of January 2016, connect it to the grid in early February, and resume commercial operation at the end of February. Of the total 157 fuel\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/04\/\u9ad8\u6d5c34\u30ab\u30e9\u30fc-e1429065622370.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1724#blogposting\",\"name\":\"Fuel Being Loaded into Takahama-3 NPP - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"headline\":\"Fuel Being Loaded into Takahama-3 NPP\",\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/wp-content\\\/uploads\\\/2015\\\/04\\\/\\u9ad8\\u6d5c34\\u30ab\\u30e9\\u30fc-e1429065622370.jpg\",\"width\":310,\"height\":250,\"caption\":\"Takahama-3&4\"},\"datePublished\":\"2015-12-28T01:32:55+09:00\",\"dateModified\":\"2016-01-22T04:26:12+09:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1724#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1724#webpage\"},\"articleSection\":\"News, NPPs, Kansai, MOX, restart, Takahama-3, Takahama-4\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1724#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"position\":2,\"name\":\"News\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"position\":3,\"name\":\"NPPs\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1724#listItem\",\"name\":\"Fuel Being Loaded into Takahama-3 NPP\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1724#listItem\",\"position\":4,\"name\":\"Fuel Being Loaded into Takahama-3 NPP\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno\",\"name\":\"Kaoru Ohno\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1724#webpage\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1724\",\"name\":\"Fuel Being Loaded into Takahama-3 NPP - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"description\":\"When the fuel loading is complete, Kansai EP will receive a pre-service inspection of post-loading portions of the unit. The company expects to start up the reactor at the end of January 2016, connect it to the grid in early February, and resume commercial operation at the end of February. Of the total 157 fuel\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1724#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/wp-content\\\/uploads\\\/2015\\\/04\\\/\\u9ad8\\u6d5c34\\u30ab\\u30e9\\u30fc-e1429065622370.jpg\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1724\\\/#mainImage\",\"width\":310,\"height\":250,\"caption\":\"Takahama-3&4\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1724#mainImage\"},\"datePublished\":\"2015-12-28T01:32:55+09:00\",\"dateModified\":\"2016-01-22T04:26:12+09:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Fuel Being Loaded into Takahama-3 NPP - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"When the fuel loading is complete, Kansai EP will receive a pre-service inspection of post-loading portions of the unit. The company expects to start up the reactor at the end of January 2016, connect it to the grid in early February, and resume commercial operation at the end of February. Of the total 157 fuel","canonical_url":"https:\/\/www.jaif.or.jp\/en\/news\/1724","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1724#blogposting","name":"Fuel Being Loaded into Takahama-3 NPP - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","headline":"Fuel Being Loaded into Takahama-3 NPP","author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/04\/\u9ad8\u6d5c34\u30ab\u30e9\u30fc-e1429065622370.jpg","width":310,"height":250,"caption":"Takahama-3&4"},"datePublished":"2015-12-28T01:32:55+09:00","dateModified":"2016-01-22T04:26:12+09:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/1724#webpage"},"isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/1724#webpage"},"articleSection":"News, NPPs, Kansai, MOX, restart, Takahama-3, Takahama-4"},{"@type":"BreadcrumbList","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1724#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.jaif.or.jp\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","position":2,"name":"News","item":"https:\/\/www.jaif.or.jp\/en\/news","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","position":3,"name":"NPPs","item":"https:\/\/www.jaif.or.jp\/en\/news\/npps","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1724#listItem","name":"Fuel Being Loaded into Takahama-3 NPP"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1724#listItem","position":4,"name":"Fuel Being Loaded into Takahama-3 NPP","previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"}}]},{"@type":"Organization","@id":"https:\/\/www.jaif.or.jp\/en\/#organization","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","url":"https:\/\/www.jaif.or.jp\/en\/"},{"@type":"Person","@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author","url":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno","name":"Kaoru Ohno"},{"@type":"WebPage","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1724#webpage","url":"https:\/\/www.jaif.or.jp\/en\/news\/1724","name":"Fuel Being Loaded into Takahama-3 NPP - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"When the fuel loading is complete, Kansai EP will receive a pre-service inspection of post-loading portions of the unit. The company expects to start up the reactor at the end of January 2016, connect it to the grid in early February, and resume commercial operation at the end of February. Of the total 157 fuel","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/1724#breadcrumblist"},"author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"creator":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/04\/\u9ad8\u6d5c34\u30ab\u30e9\u30fc-e1429065622370.jpg","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1724\/#mainImage","width":310,"height":250,"caption":"Takahama-3&4"},"primaryImageOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/1724#mainImage"},"datePublished":"2015-12-28T01:32:55+09:00","dateModified":"2016-01-22T04:26:12+09:00"},{"@type":"WebSite","@id":"https:\/\/www.jaif.or.jp\/en\/#website","url":"https:\/\/www.jaif.or.jp\/en\/","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:type":"article","og:title":"Fuel Being Loaded into Takahama-3 NPP - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:description":"When the fuel loading is complete, Kansai EP will receive a pre-service inspection of post-loading portions of the unit. The company expects to start up the reactor at the end of January 2016, connect it to the grid in early February, and resume commercial operation at the end of February. Of the total 157 fuel","og:url":"https:\/\/www.jaif.or.jp\/en\/news\/1724","og:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/04\/\u9ad8\u6d5c34\u30ab\u30e9\u30fc-e1429065622370.jpg","og:image:secure_url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/04\/\u9ad8\u6d5c34\u30ab\u30e9\u30fc-e1429065622370.jpg","og:image:width":310,"og:image:height":250,"article:published_time":"2015-12-28T01:32:55+00:00","article:modified_time":"2016-01-22T04:26:12+00:00","twitter:card":"summary_large_image","twitter:site":"@Atoms_in_Japan","twitter:title":"Fuel Being Loaded into Takahama-3 NPP - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","twitter:description":"When the fuel loading is complete, Kansai EP will receive a pre-service inspection of post-loading portions of the unit. The company expects to start up the reactor at the end of January 2016, connect it to the grid in early February, and resume commercial operation at the end of February. Of the total 157 fuel","twitter:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/04\/\u9ad8\u6d5c34\u30ab\u30e9\u30fc-e1429065622370.jpg"},"aioseo_meta_data":{"post_id":"1724","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"limit_modified_date":false,"created":"2022-04-29 13:34:15","updated":"2026-10-29 00:22:59","focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\" title=\"News\">News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\/npps\" title=\"NPPs\">NPPs<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tFuel Being Loaded into Takahama-3 NPP\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.jaif.or.jp\/en\/"},{"label":"News","link":"https:\/\/www.jaif.or.jp\/en\/news"},{"label":"NPPs","link":"https:\/\/www.jaif.or.jp\/en\/news\/npps"},{"label":"Fuel Being Loaded into Takahama-3 NPP","link":"https:\/\/www.jaif.or.jp\/en\/news\/1724"}],"_links":{"self":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/1724","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/comments?post=1724"}],"version-history":[{"count":1,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/1724\/revisions"}],"predecessor-version":[{"id":1725,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/1724\/revisions\/1725"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media\/945"}],"wp:attachment":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media?parent=1724"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/categories?post=1724"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/tags?post=1724"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}