{"id":1772,"date":"2016-02-08T01:40:39","date_gmt":"2016-02-08T01:40:39","guid":{"rendered":"http:\/\/www.jaif.or.jp\/en\/?p=1772"},"modified":"2016-02-25T05:36:46","modified_gmt":"2016-02-25T05:36:46","slug":"fuel-loading-completed-at-takahama-4-npp","status":"publish","type":"post","link":"https:\/\/www.jaif.or.jp\/en\/news\/1772","title":{"rendered":"Fuel Loading Completed at Takahama-4 NPP"},"content":{"rendered":"<p>The power company plans to restart power generation at the unit at the end of this month. Four uranium-plutonium mixed oxide (MOX) fuel assemblies were included in the 157 assemblies loaded into <a href=\"https:\/\/www.jaif.or.jp\/en-renew\/npps\/takahama-4\/\" target=\"_blank\">Takahama-4<\/a>, so it will soon be generating electricity with MOX fuel for the first time.<\/p>\n<p>Historically, the reactor will be the fourth NPP in Japan to generate power with MOX fuel, following the <a href=\"https:\/\/www.jaif.or.jp\/en-renew\/npps\/genkai-3\/\" target=\"_blank\">Genkai-3<\/a> (PWR, 1180MWe), owned and operated by the Kyushu Electric Power Co., the <a href=\"https:\/\/www.jaif.or.jp\/en-renew\/npps\/ikata-3\/\" target=\"_blank\">Ikata-3<\/a> (PWR, 890MWe), owned and operated by the Shikoku Electric Power Co., and Kansai EP\u2019s <a href=\"https:\/\/www.jaif.or.jp\/en-renew\/npps\/takahama-3\/\" target=\"_blank\">Takahama-3<\/a> (PWR, 870MWe).<\/p>\n<p>Meanwhile, the Takahama-3, which was started up on January 29, resumed power generation on February 1. Since then, it has gradually increased output during an integrated performance test. On February 4, it achieved 100% output, after which it began operating at rated thermal output.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The power company plans to restart power generation at the unit at the end of this month. Four uranium-plutonium mixed oxide (MOX) fuel assemblies were included in the 157 assemblies loaded into Takahama-4, so it will soon be generating electricity with MOX fuel for the first time. Historically, the reactor will be the fourth NPP [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":945,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1,6,7],"tags":[20,342,18,284,285],"class_list":["post-1772","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-npps","category-regulation-safety","tag-kansai","tag-mox","tag-restart","tag-takahama-3","tag-takahama-4"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.5.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"The power company plans to restart power generation at the unit at the end of this month. Four uranium-plutonium mixed oxide (MOX) fuel assemblies were included in the 157 assemblies loaded into Takahama-4, so it will soon be generating electricity with MOX fuel for the first time. Historically, the reactor will be the fourth NPP\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Kaoru Ohno\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.jaif.or.jp\/en\/news\/1772\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.5.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Fuel Loading Completed at Takahama-4 NPP - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:description\" content=\"The power company plans to restart power generation at the unit at the end of this month. Four uranium-plutonium mixed oxide (MOX) fuel assemblies were included in the 157 assemblies loaded into Takahama-4, so it will soon be generating electricity with MOX fuel for the first time. Historically, the reactor will be the fourth NPP\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.jaif.or.jp\/en\/news\/1772\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/04\/\u9ad8\u6d5c34\u30ab\u30e9\u30fc-e1429065622370.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/04\/\u9ad8\u6d5c34\u30ab\u30e9\u30fc-e1429065622370.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"310\" \/>\n\t\t<meta property=\"og:image:height\" content=\"250\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2016-02-08T01:40:39+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2016-02-25T05:36:46+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@Atoms_in_Japan\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Fuel Loading Completed at Takahama-4 NPP - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta name=\"twitter:description\" content=\"The power company plans to restart power generation at the unit at the end of this month. Four uranium-plutonium mixed oxide (MOX) fuel assemblies were included in the 157 assemblies loaded into Takahama-4, so it will soon be generating electricity with MOX fuel for the first time. Historically, the reactor will be the fourth NPP\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/04\/\u9ad8\u6d5c34\u30ab\u30e9\u30fc-e1429065622370.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1772#blogposting\",\"name\":\"Fuel Loading Completed at Takahama-4 NPP - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"headline\":\"Fuel Loading Completed at Takahama-4 NPP\",\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/wp-content\\\/uploads\\\/2015\\\/04\\\/\\u9ad8\\u6d5c34\\u30ab\\u30e9\\u30fc-e1429065622370.jpg\",\"width\":310,\"height\":250,\"caption\":\"Takahama-3&4\"},\"datePublished\":\"2016-02-08T01:40:39+09:00\",\"dateModified\":\"2016-02-25T05:36:46+09:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1772#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1772#webpage\"},\"articleSection\":\"News, NPPs, Regulation &amp; Safety, Kansai, MOX, restart, Takahama-3, Takahama-4\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1772#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"position\":2,\"name\":\"News\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"position\":3,\"name\":\"NPPs\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1772#listItem\",\"name\":\"Fuel Loading Completed at Takahama-4 NPP\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1772#listItem\",\"position\":4,\"name\":\"Fuel Loading Completed at Takahama-4 NPP\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno\",\"name\":\"Kaoru Ohno\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1772#webpage\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1772\",\"name\":\"Fuel Loading Completed at Takahama-4 NPP - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"description\":\"The power company plans to restart power generation at the unit at the end of this month. Four uranium-plutonium mixed oxide (MOX) fuel assemblies were included in the 157 assemblies loaded into Takahama-4, so it will soon be generating electricity with MOX fuel for the first time. Historically, the reactor will be the fourth NPP\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1772#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/wp-content\\\/uploads\\\/2015\\\/04\\\/\\u9ad8\\u6d5c34\\u30ab\\u30e9\\u30fc-e1429065622370.jpg\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1772\\\/#mainImage\",\"width\":310,\"height\":250,\"caption\":\"Takahama-3&4\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1772#mainImage\"},\"datePublished\":\"2016-02-08T01:40:39+09:00\",\"dateModified\":\"2016-02-25T05:36:46+09:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Fuel Loading Completed at Takahama-4 NPP - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"The power company plans to restart power generation at the unit at the end of this month. Four uranium-plutonium mixed oxide (MOX) fuel assemblies were included in the 157 assemblies loaded into Takahama-4, so it will soon be generating electricity with MOX fuel for the first time. Historically, the reactor will be the fourth NPP","canonical_url":"https:\/\/www.jaif.or.jp\/en\/news\/1772","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1772#blogposting","name":"Fuel Loading Completed at Takahama-4 NPP - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","headline":"Fuel Loading Completed at Takahama-4 NPP","author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/04\/\u9ad8\u6d5c34\u30ab\u30e9\u30fc-e1429065622370.jpg","width":310,"height":250,"caption":"Takahama-3&4"},"datePublished":"2016-02-08T01:40:39+09:00","dateModified":"2016-02-25T05:36:46+09:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/1772#webpage"},"isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/1772#webpage"},"articleSection":"News, NPPs, Regulation &amp; Safety, Kansai, MOX, restart, Takahama-3, Takahama-4"},{"@type":"BreadcrumbList","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1772#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.jaif.or.jp\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","position":2,"name":"News","item":"https:\/\/www.jaif.or.jp\/en\/news","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","position":3,"name":"NPPs","item":"https:\/\/www.jaif.or.jp\/en\/news\/npps","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1772#listItem","name":"Fuel Loading Completed at Takahama-4 NPP"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1772#listItem","position":4,"name":"Fuel Loading Completed at Takahama-4 NPP","previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"}}]},{"@type":"Organization","@id":"https:\/\/www.jaif.or.jp\/en\/#organization","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","url":"https:\/\/www.jaif.or.jp\/en\/"},{"@type":"Person","@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author","url":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno","name":"Kaoru Ohno"},{"@type":"WebPage","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1772#webpage","url":"https:\/\/www.jaif.or.jp\/en\/news\/1772","name":"Fuel Loading Completed at Takahama-4 NPP - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"The power company plans to restart power generation at the unit at the end of this month. Four uranium-plutonium mixed oxide (MOX) fuel assemblies were included in the 157 assemblies loaded into Takahama-4, so it will soon be generating electricity with MOX fuel for the first time. Historically, the reactor will be the fourth NPP","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/1772#breadcrumblist"},"author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"creator":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/04\/\u9ad8\u6d5c34\u30ab\u30e9\u30fc-e1429065622370.jpg","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1772\/#mainImage","width":310,"height":250,"caption":"Takahama-3&4"},"primaryImageOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/1772#mainImage"},"datePublished":"2016-02-08T01:40:39+09:00","dateModified":"2016-02-25T05:36:46+09:00"},{"@type":"WebSite","@id":"https:\/\/www.jaif.or.jp\/en\/#website","url":"https:\/\/www.jaif.or.jp\/en\/","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:type":"article","og:title":"Fuel Loading Completed at Takahama-4 NPP - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:description":"The power company plans to restart power generation at the unit at the end of this month. Four uranium-plutonium mixed oxide (MOX) fuel assemblies were included in the 157 assemblies loaded into Takahama-4, so it will soon be generating electricity with MOX fuel for the first time. Historically, the reactor will be the fourth NPP","og:url":"https:\/\/www.jaif.or.jp\/en\/news\/1772","og:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/04\/\u9ad8\u6d5c34\u30ab\u30e9\u30fc-e1429065622370.jpg","og:image:secure_url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/04\/\u9ad8\u6d5c34\u30ab\u30e9\u30fc-e1429065622370.jpg","og:image:width":310,"og:image:height":250,"article:published_time":"2016-02-08T01:40:39+00:00","article:modified_time":"2016-02-25T05:36:46+00:00","twitter:card":"summary_large_image","twitter:site":"@Atoms_in_Japan","twitter:title":"Fuel Loading Completed at Takahama-4 NPP - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","twitter:description":"The power company plans to restart power generation at the unit at the end of this month. Four uranium-plutonium mixed oxide (MOX) fuel assemblies were included in the 157 assemblies loaded into Takahama-4, so it will soon be generating electricity with MOX fuel for the first time. Historically, the reactor will be the fourth NPP","twitter:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/04\/\u9ad8\u6d5c34\u30ab\u30e9\u30fc-e1429065622370.jpg"},"aioseo_meta_data":{"post_id":"1772","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"limit_modified_date":false,"created":"2022-04-29 13:35:16","updated":"2026-10-29 00:26:45","focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\" title=\"News\">News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\/npps\" title=\"NPPs\">NPPs<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tFuel Loading Completed at Takahama-4 NPP\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.jaif.or.jp\/en\/"},{"label":"News","link":"https:\/\/www.jaif.or.jp\/en\/news"},{"label":"NPPs","link":"https:\/\/www.jaif.or.jp\/en\/news\/npps"},{"label":"Fuel Loading Completed at Takahama-4 NPP","link":"https:\/\/www.jaif.or.jp\/en\/news\/1772"}],"_links":{"self":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/1772","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/comments?post=1772"}],"version-history":[{"count":1,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/1772\/revisions"}],"predecessor-version":[{"id":1773,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/1772\/revisions\/1773"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media\/945"}],"wp:attachment":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media?parent=1772"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/categories?post=1772"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/tags?post=1772"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}