{"id":1864,"date":"2016-04-11T02:24:24","date_gmt":"2016-04-11T01:24:24","guid":{"rendered":"http:\/\/www.jaif.or.jp\/en\/?p=1864"},"modified":"2016-04-18T06:21:40","modified_gmt":"2016-04-18T05:21:40","slug":"kyushu-electric-power-sees-capacity-reserve-margin-above-14-with-restart-of-npps","status":"publish","type":"post","link":"https:\/\/www.jaif.or.jp\/en\/news\/1864","title":{"rendered":"Kyushu Electric Power Sees Capacity Reserve Margin Above 14% With Restart of NPPs"},"content":{"rendered":"<p>The company foresees power demand of 14.69\u201315.64GW. The range is based on alternative assumptions of normal summer temperatures or temperatures as high as in 2010. As a result, it will ensure power supplies of 18.57GW in July and 17.85GW in August. Together with the Sendai units, the LNG combined cycle power plant in Oita City, Oita Prefecture, which is expected to start operation this July, will contribute to the stability of that supply.<\/p>\n<p>After the accident at the Fukushima Daiichi NPPs in March 2011, Kyushu Electric Power shut down all of its NPPs. Summer power supplies have been a virtual &#8220;tightrope walk&#8221; since then, with capacity reserve margins of a mere 3%, the minimum level for stable power supply, based on power interchanges with other companies.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The company foresees power demand of 14.69\u201315.64GW. The range is based on alternative assumptions of normal summer temperatures or temperatures as high as in 2010. As a result, it will ensure power supplies of 18.57GW in July and 17.85GW in August. Together with the Sendai units, the LNG combined cycle power plant in Oita City, [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":1375,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9,1,6],"tags":[115,37,429,18,271,286,354],"class_list":["post-1864","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry","category-news","category-npps","tag-electricity-system","tag-kyushu","tag-reserve-margin","tag-restart","tag-sendai-1","tag-sendai-2","tag-supply-and-demand"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.4 - aioseo.com -->\n\t<meta name=\"description\" content=\"The company foresees power demand of 14.69\u201315.64GW. The range is based on alternative assumptions of normal summer temperatures or temperatures as high as in 2010. As a result, it will ensure power supplies of 18.57GW in July and 17.85GW in August. Together with the Sendai units, the LNG combined cycle power plant in Oita City,\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Kaoru Ohno\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.jaif.or.jp\/en\/news\/1864\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.4\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Kyushu Electric Power Sees Capacity Reserve Margin Above 14% With Restart of NPPs - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:description\" content=\"The company foresees power demand of 14.69\u201315.64GW. The range is based on alternative assumptions of normal summer temperatures or temperatures as high as in 2010. As a result, it will ensure power supplies of 18.57GW in July and 17.85GW in August. Together with the Sendai units, the LNG combined cycle power plant in Oita City,\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.jaif.or.jp\/en\/news\/1864\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/08\/\u5ddd\u5185\u5916\u89b3\u5199\u771f\uff13\uff08\u6700\u65b0\uff09-e1439284155629.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/08\/\u5ddd\u5185\u5916\u89b3\u5199\u771f\uff13\uff08\u6700\u65b0\uff09-e1439284155629.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"310\" \/>\n\t\t<meta property=\"og:image:height\" content=\"180\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2016-04-11T01:24:24+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2016-04-18T05:21:40+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@Atoms_in_Japan\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Kyushu Electric Power Sees Capacity Reserve Margin Above 14% With Restart of NPPs - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta name=\"twitter:description\" content=\"The company foresees power demand of 14.69\u201315.64GW. The range is based on alternative assumptions of normal summer temperatures or temperatures as high as in 2010. As a result, it will ensure power supplies of 18.57GW in July and 17.85GW in August. Together with the Sendai units, the LNG combined cycle power plant in Oita City,\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/08\/\u5ddd\u5185\u5916\u89b3\u5199\u771f\uff13\uff08\u6700\u65b0\uff09-e1439284155629.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1864#blogposting\",\"name\":\"Kyushu Electric Power Sees Capacity Reserve Margin Above 14% With Restart of NPPs - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"headline\":\"Kyushu Electric Power Sees Capacity Reserve Margin Above 14% With Restart of NPPs\",\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/wp-content\\\/uploads\\\/2015\\\/08\\\/\\u5ddd\\u5185\\u5916\\u89b3\\u5199\\u771f\\uff13\\uff08\\u6700\\u65b0\\uff09-e1439284155629.jpg\",\"width\":310,\"height\":180,\"caption\":\"Kyushu Electric Power's Sendai NPPs\"},\"datePublished\":\"2016-04-11T02:24:24+09:00\",\"dateModified\":\"2016-04-18T06:21:40+09:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1864#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1864#webpage\"},\"articleSection\":\"Industry, News, NPPs, electricity system, Kyushu, reserve margin, restart, Sendai-1, Sendai-2, supply and demand\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1864#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"position\":2,\"name\":\"News\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"position\":3,\"name\":\"NPPs\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1864#listItem\",\"name\":\"Kyushu Electric Power Sees Capacity Reserve Margin Above 14% With Restart of NPPs\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1864#listItem\",\"position\":4,\"name\":\"Kyushu Electric Power Sees Capacity Reserve Margin Above 14% With Restart of NPPs\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno\",\"name\":\"Kaoru Ohno\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1864#webpage\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1864\",\"name\":\"Kyushu Electric Power Sees Capacity Reserve Margin Above 14% With Restart of NPPs - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"description\":\"The company foresees power demand of 14.69\\u201315.64GW. The range is based on alternative assumptions of normal summer temperatures or temperatures as high as in 2010. As a result, it will ensure power supplies of 18.57GW in July and 17.85GW in August. Together with the Sendai units, the LNG combined cycle power plant in Oita City,\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1864#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/wp-content\\\/uploads\\\/2015\\\/08\\\/\\u5ddd\\u5185\\u5916\\u89b3\\u5199\\u771f\\uff13\\uff08\\u6700\\u65b0\\uff09-e1439284155629.jpg\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1864\\\/#mainImage\",\"width\":310,\"height\":180,\"caption\":\"Kyushu Electric Power's Sendai NPPs\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/1864#mainImage\"},\"datePublished\":\"2016-04-11T02:24:24+09:00\",\"dateModified\":\"2016-04-18T06:21:40+09:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Kyushu Electric Power Sees Capacity Reserve Margin Above 14% With Restart of NPPs - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"The company foresees power demand of 14.69\u201315.64GW. The range is based on alternative assumptions of normal summer temperatures or temperatures as high as in 2010. As a result, it will ensure power supplies of 18.57GW in July and 17.85GW in August. Together with the Sendai units, the LNG combined cycle power plant in Oita City,","canonical_url":"https:\/\/www.jaif.or.jp\/en\/news\/1864","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1864#blogposting","name":"Kyushu Electric Power Sees Capacity Reserve Margin Above 14% With Restart of NPPs - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","headline":"Kyushu Electric Power Sees Capacity Reserve Margin Above 14% With Restart of NPPs","author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/08\/\u5ddd\u5185\u5916\u89b3\u5199\u771f\uff13\uff08\u6700\u65b0\uff09-e1439284155629.jpg","width":310,"height":180,"caption":"Kyushu Electric Power's Sendai NPPs"},"datePublished":"2016-04-11T02:24:24+09:00","dateModified":"2016-04-18T06:21:40+09:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/1864#webpage"},"isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/1864#webpage"},"articleSection":"Industry, News, NPPs, electricity system, Kyushu, reserve margin, restart, Sendai-1, Sendai-2, supply and demand"},{"@type":"BreadcrumbList","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1864#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.jaif.or.jp\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","position":2,"name":"News","item":"https:\/\/www.jaif.or.jp\/en\/news","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","position":3,"name":"NPPs","item":"https:\/\/www.jaif.or.jp\/en\/news\/npps","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1864#listItem","name":"Kyushu Electric Power Sees Capacity Reserve Margin Above 14% With Restart of NPPs"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1864#listItem","position":4,"name":"Kyushu Electric Power Sees Capacity Reserve Margin Above 14% With Restart of NPPs","previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"}}]},{"@type":"Organization","@id":"https:\/\/www.jaif.or.jp\/en\/#organization","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","url":"https:\/\/www.jaif.or.jp\/en\/"},{"@type":"Person","@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author","url":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno","name":"Kaoru Ohno"},{"@type":"WebPage","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1864#webpage","url":"https:\/\/www.jaif.or.jp\/en\/news\/1864","name":"Kyushu Electric Power Sees Capacity Reserve Margin Above 14% With Restart of NPPs - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"The company foresees power demand of 14.69\u201315.64GW. The range is based on alternative assumptions of normal summer temperatures or temperatures as high as in 2010. As a result, it will ensure power supplies of 18.57GW in July and 17.85GW in August. Together with the Sendai units, the LNG combined cycle power plant in Oita City,","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/1864#breadcrumblist"},"author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"creator":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/08\/\u5ddd\u5185\u5916\u89b3\u5199\u771f\uff13\uff08\u6700\u65b0\uff09-e1439284155629.jpg","@id":"https:\/\/www.jaif.or.jp\/en\/news\/1864\/#mainImage","width":310,"height":180,"caption":"Kyushu Electric Power's Sendai NPPs"},"primaryImageOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/1864#mainImage"},"datePublished":"2016-04-11T02:24:24+09:00","dateModified":"2016-04-18T06:21:40+09:00"},{"@type":"WebSite","@id":"https:\/\/www.jaif.or.jp\/en\/#website","url":"https:\/\/www.jaif.or.jp\/en\/","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:type":"article","og:title":"Kyushu Electric Power Sees Capacity Reserve Margin Above 14% With Restart of NPPs - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:description":"The company foresees power demand of 14.69\u201315.64GW. The range is based on alternative assumptions of normal summer temperatures or temperatures as high as in 2010. As a result, it will ensure power supplies of 18.57GW in July and 17.85GW in August. Together with the Sendai units, the LNG combined cycle power plant in Oita City,","og:url":"https:\/\/www.jaif.or.jp\/en\/news\/1864","og:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/08\/\u5ddd\u5185\u5916\u89b3\u5199\u771f\uff13\uff08\u6700\u65b0\uff09-e1439284155629.jpg","og:image:secure_url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/08\/\u5ddd\u5185\u5916\u89b3\u5199\u771f\uff13\uff08\u6700\u65b0\uff09-e1439284155629.jpg","og:image:width":310,"og:image:height":180,"article:published_time":"2016-04-11T01:24:24+00:00","article:modified_time":"2016-04-18T05:21:40+00:00","twitter:card":"summary_large_image","twitter:site":"@Atoms_in_Japan","twitter:title":"Kyushu Electric Power Sees Capacity Reserve Margin Above 14% With Restart of NPPs - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","twitter:description":"The company foresees power demand of 14.69\u201315.64GW. The range is based on alternative assumptions of normal summer temperatures or temperatures as high as in 2010. As a result, it will ensure power supplies of 18.57GW in July and 17.85GW in August. Together with the Sendai units, the LNG combined cycle power plant in Oita City,","twitter:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/08\/\u5ddd\u5185\u5916\u89b3\u5199\u771f\uff13\uff08\u6700\u65b0\uff09-e1439284155629.jpg"},"aioseo_meta_data":{"post_id":"1864","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"limit_modified_date":false,"created":"2022-04-29 13:38:15","updated":"2026-10-29 00:29:49","focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\" title=\"News\">News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\/npps\" title=\"NPPs\">NPPs<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tKyushu Electric Power Sees Capacity Reserve Margin Above 14% With Restart of NPPs\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.jaif.or.jp\/en\/"},{"label":"News","link":"https:\/\/www.jaif.or.jp\/en\/news"},{"label":"NPPs","link":"https:\/\/www.jaif.or.jp\/en\/news\/npps"},{"label":"Kyushu Electric Power Sees Capacity Reserve Margin Above 14% With Restart of NPPs","link":"https:\/\/www.jaif.or.jp\/en\/news\/1864"}],"_links":{"self":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/1864","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/comments?post=1864"}],"version-history":[{"count":1,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/1864\/revisions"}],"predecessor-version":[{"id":1865,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/1864\/revisions\/1865"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media\/1375"}],"wp:attachment":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media?parent=1864"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/categories?post=1864"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/tags?post=1864"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}