{"id":2002,"date":"2016-06-28T03:27:41","date_gmt":"2016-06-28T02:27:41","guid":{"rendered":"http:\/\/www.jaif.or.jp\/en\/?p=2002"},"modified":"2016-07-15T02:40:20","modified_gmt":"2016-07-15T01:40:20","slug":"ikata-3-fuel-loading-completed-with-commercial-operation-to-resume-in-august","status":"publish","type":"post","link":"https:\/\/www.jaif.or.jp\/en\/news\/2002","title":{"rendered":"Ikata-3 Fuel Loading Completed, with Commercial Operation to Resume in August"},"content":{"rendered":"<p>Ikata-3 has already cleared a safety examination by the Nuclear Regulation Authority (NRA), confirming its compatibility with the new regulatory standards, with permission granted to make changes to the reactor installation (basic design approval) in July 2015. The NRA approved the construction work plan (detailed design approval) in March of this year. It has also been making pre-service inspections of the reactor since April to confirm that the equipment and facilities are functioning as determined in the compatibility examination.<\/p>\n<p>In regard to facilities designed to respond to specific severe accident situations, including terrorist attacks, as required under the new regulatory standards, the NRA gave Shikoku Electric Power a five-year grace period from the time of the detailed design approval (i.e., this year), but the power utility expects to complete that work by FY19 (which begins in April 2019).<\/p>\n<p>After loading the fuel assemblies, Shikoku Electric Power will carry out tests to confirm plant functions and performance before it starts the reactor up again. According to the FY16 management plan issued by the company at the end of April, Ikata-3 is expected to begin generating power at the end of July, and re-enter commercial service in mid-August.<\/p>\n<p>That will make Ikata-3 Japan\u2019s fifth reactor to be restarted after meeting the new regulatory standards, joining the Sendai-1 and -2 NPPs, owned and operated by the Kyushu Electric Power Co. and the Takahama-3 and -4 NPPs, owned and operated by the Kansai Electric Power Co. (Kansai EP).<\/p>\n<p>Shikoku Electric Power\u2019s previously-issued outlook for energy supply and demand for this coming summer was made on the assumption that it would not restart any NPPs. The power utility now says, though, that it is striving to restart Ikata-3 as soon as possible in anticipation of increased power demand for the summer.<\/p>\n<p>In order to ensure stable supplies of electricity, it has pressed aging thermal-power generation facilities into service, creating various burdens. For example, periodic inspections at Shikoku Electric Power\u2019s Anan-2 oil-fired plant (220MWe), 47 years old, have already been deferred twice under the act on special measures for earthquake-related special cases.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Ikata-3 has already cleared a safety examination by the Nuclear Regulation Authority (NRA), confirming its compatibility with the new regulatory standards, with permission granted to make changes to the reactor installation (basic design approval) in July 2015. The NRA approved the construction work plan (detailed design approval) in March of this year. It has also [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":1321,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1,6,7],"tags":[380,76,378,19,18,379],"class_list":["post-2002","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-npps","category-regulation-safety","tag-ehime","tag-ikata","tag-ikata-3","tag-nra","tag-restart","tag-shikoku"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.5.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"Ikata-3 has already cleared a safety examination by the Nuclear Regulation Authority (NRA), confirming its compatibility with the new regulatory standards, with permission granted to make changes to the reactor installation (basic design approval) in July 2015. The NRA approved the construction work plan (detailed design approval) in March of this year. It has also\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Kaoru Ohno\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.jaif.or.jp\/en\/news\/2002\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.5.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Ikata-3 Fuel Loading Completed, with Commercial Operation to Resume in August - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:description\" content=\"Ikata-3 has already cleared a safety examination by the Nuclear Regulation Authority (NRA), confirming its compatibility with the new regulatory standards, with permission granted to make changes to the reactor installation (basic design approval) in July 2015. The NRA approved the construction work plan (detailed design approval) in March of this year. It has also\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.jaif.or.jp\/en\/news\/2002\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/07\/\u4f0a\u65b9\u767a\u96fb\u6240\u5168\u666f\u516c\u5f0f\u4f7f\u7528Ver\uff09-e1437012606118.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/07\/\u4f0a\u65b9\u767a\u96fb\u6240\u5168\u666f\u516c\u5f0f\u4f7f\u7528Ver\uff09-e1437012606118.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"310\" \/>\n\t\t<meta property=\"og:image:height\" content=\"204\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2016-06-28T02:27:41+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2016-07-15T01:40:20+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@Atoms_in_Japan\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Ikata-3 Fuel Loading Completed, with Commercial Operation to Resume in August - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Ikata-3 has already cleared a safety examination by the Nuclear Regulation Authority (NRA), confirming its compatibility with the new regulatory standards, with permission granted to make changes to the reactor installation (basic design approval) in July 2015. The NRA approved the construction work plan (detailed design approval) in March of this year. It has also\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/07\/\u4f0a\u65b9\u767a\u96fb\u6240\u5168\u666f\u516c\u5f0f\u4f7f\u7528Ver\uff09-e1437012606118.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/2002#blogposting\",\"name\":\"Ikata-3 Fuel Loading Completed, with Commercial Operation to Resume in August - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"headline\":\"Ikata-3 Fuel Loading Completed, with Commercial Operation to Resume in August\",\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/wp-content\\\/uploads\\\/2015\\\/07\\\/\\u4f0a\\u65b9\\u767a\\u96fb\\u6240\\u5168\\u666f\\u516c\\u5f0f\\u4f7f\\u7528Ver\\uff09-e1437012606118.jpg\",\"width\":310,\"height\":204,\"caption\":\"Shikoku Electric Power's Ikata NPPs\"},\"datePublished\":\"2016-06-28T03:27:41+09:00\",\"dateModified\":\"2016-07-15T02:40:20+09:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/2002#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/2002#webpage\"},\"articleSection\":\"News, NPPs, Regulation &amp; Safety, Ehime, Ikata, Ikata-3, NRA, restart, Shikoku\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/2002#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"position\":2,\"name\":\"News\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"position\":3,\"name\":\"NPPs\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/2002#listItem\",\"name\":\"Ikata-3 Fuel Loading Completed, with Commercial Operation to Resume in August\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/2002#listItem\",\"position\":4,\"name\":\"Ikata-3 Fuel Loading Completed, with Commercial Operation to Resume in August\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno\",\"name\":\"Kaoru Ohno\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/2002#webpage\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/2002\",\"name\":\"Ikata-3 Fuel Loading Completed, with Commercial Operation to Resume in August - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"description\":\"Ikata-3 has already cleared a safety examination by the Nuclear Regulation Authority (NRA), confirming its compatibility with the new regulatory standards, with permission granted to make changes to the reactor installation (basic design approval) in July 2015. The NRA approved the construction work plan (detailed design approval) in March of this year. It has also\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/2002#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/wp-content\\\/uploads\\\/2015\\\/07\\\/\\u4f0a\\u65b9\\u767a\\u96fb\\u6240\\u5168\\u666f\\u516c\\u5f0f\\u4f7f\\u7528Ver\\uff09-e1437012606118.jpg\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/2002\\\/#mainImage\",\"width\":310,\"height\":204,\"caption\":\"Shikoku Electric Power's Ikata NPPs\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/2002#mainImage\"},\"datePublished\":\"2016-06-28T03:27:41+09:00\",\"dateModified\":\"2016-07-15T02:40:20+09:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Ikata-3 Fuel Loading Completed, with Commercial Operation to Resume in August - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"Ikata-3 has already cleared a safety examination by the Nuclear Regulation Authority (NRA), confirming its compatibility with the new regulatory standards, with permission granted to make changes to the reactor installation (basic design approval) in July 2015. The NRA approved the construction work plan (detailed design approval) in March of this year. It has also","canonical_url":"https:\/\/www.jaif.or.jp\/en\/news\/2002","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.jaif.or.jp\/en\/news\/2002#blogposting","name":"Ikata-3 Fuel Loading Completed, with Commercial Operation to Resume in August - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","headline":"Ikata-3 Fuel Loading Completed, with Commercial Operation to Resume in August","author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/07\/\u4f0a\u65b9\u767a\u96fb\u6240\u5168\u666f\u516c\u5f0f\u4f7f\u7528Ver\uff09-e1437012606118.jpg","width":310,"height":204,"caption":"Shikoku Electric Power's Ikata NPPs"},"datePublished":"2016-06-28T03:27:41+09:00","dateModified":"2016-07-15T02:40:20+09:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/2002#webpage"},"isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/2002#webpage"},"articleSection":"News, NPPs, Regulation &amp; Safety, Ehime, Ikata, Ikata-3, NRA, restart, Shikoku"},{"@type":"BreadcrumbList","@id":"https:\/\/www.jaif.or.jp\/en\/news\/2002#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.jaif.or.jp\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","position":2,"name":"News","item":"https:\/\/www.jaif.or.jp\/en\/news","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","position":3,"name":"NPPs","item":"https:\/\/www.jaif.or.jp\/en\/news\/npps","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/2002#listItem","name":"Ikata-3 Fuel Loading Completed, with Commercial Operation to Resume in August"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/2002#listItem","position":4,"name":"Ikata-3 Fuel Loading Completed, with Commercial Operation to Resume in August","previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"}}]},{"@type":"Organization","@id":"https:\/\/www.jaif.or.jp\/en\/#organization","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","url":"https:\/\/www.jaif.or.jp\/en\/"},{"@type":"Person","@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author","url":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno","name":"Kaoru Ohno"},{"@type":"WebPage","@id":"https:\/\/www.jaif.or.jp\/en\/news\/2002#webpage","url":"https:\/\/www.jaif.or.jp\/en\/news\/2002","name":"Ikata-3 Fuel Loading Completed, with Commercial Operation to Resume in August - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"Ikata-3 has already cleared a safety examination by the Nuclear Regulation Authority (NRA), confirming its compatibility with the new regulatory standards, with permission granted to make changes to the reactor installation (basic design approval) in July 2015. The NRA approved the construction work plan (detailed design approval) in March of this year. It has also","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/2002#breadcrumblist"},"author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"creator":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/07\/\u4f0a\u65b9\u767a\u96fb\u6240\u5168\u666f\u516c\u5f0f\u4f7f\u7528Ver\uff09-e1437012606118.jpg","@id":"https:\/\/www.jaif.or.jp\/en\/news\/2002\/#mainImage","width":310,"height":204,"caption":"Shikoku Electric Power's Ikata NPPs"},"primaryImageOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/2002#mainImage"},"datePublished":"2016-06-28T03:27:41+09:00","dateModified":"2016-07-15T02:40:20+09:00"},{"@type":"WebSite","@id":"https:\/\/www.jaif.or.jp\/en\/#website","url":"https:\/\/www.jaif.or.jp\/en\/","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:type":"article","og:title":"Ikata-3 Fuel Loading Completed, with Commercial Operation to Resume in August - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:description":"Ikata-3 has already cleared a safety examination by the Nuclear Regulation Authority (NRA), confirming its compatibility with the new regulatory standards, with permission granted to make changes to the reactor installation (basic design approval) in July 2015. The NRA approved the construction work plan (detailed design approval) in March of this year. It has also","og:url":"https:\/\/www.jaif.or.jp\/en\/news\/2002","og:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/07\/\u4f0a\u65b9\u767a\u96fb\u6240\u5168\u666f\u516c\u5f0f\u4f7f\u7528Ver\uff09-e1437012606118.jpg","og:image:secure_url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/07\/\u4f0a\u65b9\u767a\u96fb\u6240\u5168\u666f\u516c\u5f0f\u4f7f\u7528Ver\uff09-e1437012606118.jpg","og:image:width":310,"og:image:height":204,"article:published_time":"2016-06-28T02:27:41+00:00","article:modified_time":"2016-07-15T01:40:20+00:00","twitter:card":"summary_large_image","twitter:site":"@Atoms_in_Japan","twitter:title":"Ikata-3 Fuel Loading Completed, with Commercial Operation to Resume in August - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","twitter:description":"Ikata-3 has already cleared a safety examination by the Nuclear Regulation Authority (NRA), confirming its compatibility with the new regulatory standards, with permission granted to make changes to the reactor installation (basic design approval) in July 2015. The NRA approved the construction work plan (detailed design approval) in March of this year. It has also","twitter:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/07\/\u4f0a\u65b9\u767a\u96fb\u6240\u5168\u666f\u516c\u5f0f\u4f7f\u7528Ver\uff09-e1437012606118.jpg"},"aioseo_meta_data":{"post_id":"2002","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"limit_modified_date":false,"created":"2022-04-29 13:41:17","updated":"2026-10-29 00:33:47","focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\" title=\"News\">News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\/npps\" title=\"NPPs\">NPPs<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tIkata-3 Fuel Loading Completed, with Commercial Operation to Resume in August\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.jaif.or.jp\/en\/"},{"label":"News","link":"https:\/\/www.jaif.or.jp\/en\/news"},{"label":"NPPs","link":"https:\/\/www.jaif.or.jp\/en\/news\/npps"},{"label":"Ikata-3 Fuel Loading Completed, with Commercial Operation to Resume in August","link":"https:\/\/www.jaif.or.jp\/en\/news\/2002"}],"_links":{"self":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/2002","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/comments?post=2002"}],"version-history":[{"count":1,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/2002\/revisions"}],"predecessor-version":[{"id":2003,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/2002\/revisions\/2003"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media\/1321"}],"wp:attachment":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media?parent=2002"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/categories?post=2002"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/tags?post=2002"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}