{"id":2608,"date":"2017-04-20T05:40:28","date_gmt":"2017-04-20T04:40:28","guid":{"rendered":"http:\/\/www.jaif.or.jp\/en\/?p=2608"},"modified":"2017-04-26T02:52:38","modified_gmt":"2017-04-26T01:52:38","slug":"second-nuclear-fuel-facility-clears-nras-safety-examination","status":"publish","type":"post","link":"https:\/\/www.jaif.or.jp\/en\/news\/2608","title":{"rendered":"Second Nuclear Fuel Facility Clears NRA&#8217;s Safety Examination"},"content":{"rendered":"<p>This means that the plant has essentially passed the examination\u2014the second nuclear fuel facility to do so since the new standards took effect. The first was a fuel fabrication plant owned by Global Nuclear Fuel-Japan Co. (GNF-J), in Yokosuka City (Kanagawa Prefecture). The draft report will be made official after receiving input from the head of the Ministry of Economy, Trade and Industry (METI).<\/p>\n<p>The enrichment plant began operation back in 1992. In December 2013, the new regulatory standards came into effect. In the following month\u2014January 2014\u2014JNFL filed an application for the examination.<\/p>\n<p>Under the terms for a grace period for existing facilities not having substantial exposure effects on residents of surrounding areas, the plant was allowed to continue in operation for five years after the new standards came into effect. As a result, part of the plant has continued in operation since then.<\/p>\n<p>Meanwhile, it was revealed last year that the department at JNFL responsible for quality assurance had reported internally that business reform had been completed, whereas in fact it had not been. The NRA thereupon examined anew the company&#8217;s internal control system, resulting in a delay in finalizing the review report.<\/p>\n<p>Major examinations have also been completed for JNFL&#8217;s spent fuel reprocessing plant and others, all of which are integral to national nuclear fuel cycle policy.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>This means that the plant has essentially passed the examination\u2014the second nuclear fuel facility to do so since the new standards took effect. The first was a fuel fabrication plant owned by Global Nuclear Fuel-Japan Co. (GNF-J), in Yokosuka City (Kanagawa Prefecture). The draft report will be made official after receiving input from the head [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":2609,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9,1,6,7],"tags":[517,511,141,340,510,139,32,19,265,138,137],"class_list":["post-2608","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry","category-news","category-npps","category-regulation-safety","tag-enrichment","tag-fabrication","tag-fuel-assemblies","tag-fuel-cycle","tag-gnf-j","tag-jnfl","tag-meti","tag-nra","tag-regulatory-standard","tag-reprocess","tag-rokkasho"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.5.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"This means that the plant has essentially passed the examination\u2014the second nuclear fuel facility to do so since the new standards took effect. The first was a fuel fabrication plant owned by Global Nuclear Fuel-Japan Co. (GNF-J), in Yokosuka City (Kanagawa Prefecture). The draft report will be made official after receiving input from the head\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Kaoru Ohno\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.jaif.or.jp\/en\/news\/2608\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.5.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Second Nuclear Fuel Facility Clears NRA\u2019s Safety Examination - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:description\" content=\"This means that the plant has essentially passed the examination\u2014the second nuclear fuel facility to do so since the new standards took effect. The first was a fuel fabrication plant owned by Global Nuclear Fuel-Japan Co. (GNF-J), in Yokosuka City (Kanagawa Prefecture). The draft report will be made official after receiving input from the head\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.jaif.or.jp\/en\/news\/2608\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2017\/04\/\u30a6\u30e9\u30f3\u6fc3\u7e2e\u5de5\u5834\uff0896\u5e746\u6708\uff09-2-e1492663251290.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2017\/04\/\u30a6\u30e9\u30f3\u6fc3\u7e2e\u5de5\u5834\uff0896\u5e746\u6708\uff09-2-e1492663251290.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"310\" \/>\n\t\t<meta property=\"og:image:height\" content=\"179\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2017-04-20T04:40:28+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2017-04-26T01:52:38+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@Atoms_in_Japan\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Second Nuclear Fuel Facility Clears NRA\u2019s Safety Examination - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta name=\"twitter:description\" content=\"This means that the plant has essentially passed the examination\u2014the second nuclear fuel facility to do so since the new standards took effect. The first was a fuel fabrication plant owned by Global Nuclear Fuel-Japan Co. (GNF-J), in Yokosuka City (Kanagawa Prefecture). The draft report will be made official after receiving input from the head\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2017\/04\/\u30a6\u30e9\u30f3\u6fc3\u7e2e\u5de5\u5834\uff0896\u5e746\u6708\uff09-2-e1492663251290.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/2608#blogposting\",\"name\":\"Second Nuclear Fuel Facility Clears NRA\\u2019s Safety Examination - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"headline\":\"Second Nuclear Fuel Facility Clears NRA&#8217;s Safety Examination\",\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/wp-content\\\/uploads\\\/2017\\\/04\\\/\\u30a6\\u30e9\\u30f3\\u6fc3\\u7e2e\\u5de5\\u5834\\uff0896\\u5e746\\u6708\\uff09-2-e1492663251290.jpg\",\"width\":310,\"height\":179,\"caption\":\"JNFL's Uranium Enrichment Plant in 1996\"},\"datePublished\":\"2017-04-20T05:40:28+09:00\",\"dateModified\":\"2017-04-26T02:52:38+09:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/2608#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/2608#webpage\"},\"articleSection\":\"Industry, News, NPPs, Regulation &amp; Safety, enrichment, fabrication, fuel assemblies, fuel cycle, GNF-J, JNFL, METI, NRA, regulatory standard, reprocess, Rokkasho\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/2608#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"position\":2,\"name\":\"News\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"position\":3,\"name\":\"NPPs\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/2608#listItem\",\"name\":\"Second Nuclear Fuel Facility Clears NRA&#8217;s Safety Examination\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/2608#listItem\",\"position\":4,\"name\":\"Second Nuclear Fuel Facility Clears NRA&#8217;s Safety Examination\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno\",\"name\":\"Kaoru Ohno\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/2608#webpage\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/2608\",\"name\":\"Second Nuclear Fuel Facility Clears NRA\\u2019s Safety Examination - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"description\":\"This means that the plant has essentially passed the examination\\u2014the second nuclear fuel facility to do so since the new standards took effect. The first was a fuel fabrication plant owned by Global Nuclear Fuel-Japan Co. (GNF-J), in Yokosuka City (Kanagawa Prefecture). The draft report will be made official after receiving input from the head\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/2608#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/wp-content\\\/uploads\\\/2017\\\/04\\\/\\u30a6\\u30e9\\u30f3\\u6fc3\\u7e2e\\u5de5\\u5834\\uff0896\\u5e746\\u6708\\uff09-2-e1492663251290.jpg\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/2608\\\/#mainImage\",\"width\":310,\"height\":179,\"caption\":\"JNFL's Uranium Enrichment Plant in 1996\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/2608#mainImage\"},\"datePublished\":\"2017-04-20T05:40:28+09:00\",\"dateModified\":\"2017-04-26T02:52:38+09:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Second Nuclear Fuel Facility Clears NRA\u2019s Safety Examination - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"This means that the plant has essentially passed the examination\u2014the second nuclear fuel facility to do so since the new standards took effect. The first was a fuel fabrication plant owned by Global Nuclear Fuel-Japan Co. (GNF-J), in Yokosuka City (Kanagawa Prefecture). The draft report will be made official after receiving input from the head","canonical_url":"https:\/\/www.jaif.or.jp\/en\/news\/2608","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.jaif.or.jp\/en\/news\/2608#blogposting","name":"Second Nuclear Fuel Facility Clears NRA\u2019s Safety Examination - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","headline":"Second Nuclear Fuel Facility Clears NRA&#8217;s Safety Examination","author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2017\/04\/\u30a6\u30e9\u30f3\u6fc3\u7e2e\u5de5\u5834\uff0896\u5e746\u6708\uff09-2-e1492663251290.jpg","width":310,"height":179,"caption":"JNFL's Uranium Enrichment Plant in 1996"},"datePublished":"2017-04-20T05:40:28+09:00","dateModified":"2017-04-26T02:52:38+09:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/2608#webpage"},"isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/2608#webpage"},"articleSection":"Industry, News, NPPs, Regulation &amp; Safety, enrichment, fabrication, fuel assemblies, fuel cycle, GNF-J, JNFL, METI, NRA, regulatory standard, reprocess, Rokkasho"},{"@type":"BreadcrumbList","@id":"https:\/\/www.jaif.or.jp\/en\/news\/2608#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.jaif.or.jp\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","position":2,"name":"News","item":"https:\/\/www.jaif.or.jp\/en\/news","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","position":3,"name":"NPPs","item":"https:\/\/www.jaif.or.jp\/en\/news\/npps","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/2608#listItem","name":"Second Nuclear Fuel Facility Clears NRA&#8217;s Safety Examination"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/2608#listItem","position":4,"name":"Second Nuclear Fuel Facility Clears NRA&#8217;s Safety Examination","previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"}}]},{"@type":"Organization","@id":"https:\/\/www.jaif.or.jp\/en\/#organization","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","url":"https:\/\/www.jaif.or.jp\/en\/"},{"@type":"Person","@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author","url":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno","name":"Kaoru Ohno"},{"@type":"WebPage","@id":"https:\/\/www.jaif.or.jp\/en\/news\/2608#webpage","url":"https:\/\/www.jaif.or.jp\/en\/news\/2608","name":"Second Nuclear Fuel Facility Clears NRA\u2019s Safety Examination - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"This means that the plant has essentially passed the examination\u2014the second nuclear fuel facility to do so since the new standards took effect. The first was a fuel fabrication plant owned by Global Nuclear Fuel-Japan Co. (GNF-J), in Yokosuka City (Kanagawa Prefecture). The draft report will be made official after receiving input from the head","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/2608#breadcrumblist"},"author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"creator":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2017\/04\/\u30a6\u30e9\u30f3\u6fc3\u7e2e\u5de5\u5834\uff0896\u5e746\u6708\uff09-2-e1492663251290.jpg","@id":"https:\/\/www.jaif.or.jp\/en\/news\/2608\/#mainImage","width":310,"height":179,"caption":"JNFL's Uranium Enrichment Plant in 1996"},"primaryImageOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/2608#mainImage"},"datePublished":"2017-04-20T05:40:28+09:00","dateModified":"2017-04-26T02:52:38+09:00"},{"@type":"WebSite","@id":"https:\/\/www.jaif.or.jp\/en\/#website","url":"https:\/\/www.jaif.or.jp\/en\/","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:type":"article","og:title":"Second Nuclear Fuel Facility Clears NRA\u2019s Safety Examination - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:description":"This means that the plant has essentially passed the examination\u2014the second nuclear fuel facility to do so since the new standards took effect. The first was a fuel fabrication plant owned by Global Nuclear Fuel-Japan Co. (GNF-J), in Yokosuka City (Kanagawa Prefecture). The draft report will be made official after receiving input from the head","og:url":"https:\/\/www.jaif.or.jp\/en\/news\/2608","og:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2017\/04\/\u30a6\u30e9\u30f3\u6fc3\u7e2e\u5de5\u5834\uff0896\u5e746\u6708\uff09-2-e1492663251290.jpg","og:image:secure_url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2017\/04\/\u30a6\u30e9\u30f3\u6fc3\u7e2e\u5de5\u5834\uff0896\u5e746\u6708\uff09-2-e1492663251290.jpg","og:image:width":310,"og:image:height":179,"article:published_time":"2017-04-20T04:40:28+00:00","article:modified_time":"2017-04-26T01:52:38+00:00","twitter:card":"summary_large_image","twitter:site":"@Atoms_in_Japan","twitter:title":"Second Nuclear Fuel Facility Clears NRA\u2019s Safety Examination - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","twitter:description":"This means that the plant has essentially passed the examination\u2014the second nuclear fuel facility to do so since the new standards took effect. The first was a fuel fabrication plant owned by Global Nuclear Fuel-Japan Co. (GNF-J), in Yokosuka City (Kanagawa Prefecture). The draft report will be made official after receiving input from the head","twitter:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2017\/04\/\u30a6\u30e9\u30f3\u6fc3\u7e2e\u5de5\u5834\uff0896\u5e746\u6708\uff09-2-e1492663251290.jpg"},"aioseo_meta_data":{"post_id":"2608","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"limit_modified_date":false,"created":"2022-04-29 13:52:07","updated":"2026-10-29 00:50:04","focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\" title=\"News\">News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\/npps\" title=\"NPPs\">NPPs<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tSecond Nuclear Fuel Facility Clears NRA\u2019s Safety Examination\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.jaif.or.jp\/en\/"},{"label":"News","link":"https:\/\/www.jaif.or.jp\/en\/news"},{"label":"NPPs","link":"https:\/\/www.jaif.or.jp\/en\/news\/npps"},{"label":"Second Nuclear Fuel Facility Clears NRA&#8217;s Safety Examination","link":"https:\/\/www.jaif.or.jp\/en\/news\/2608"}],"_links":{"self":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/2608","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/comments?post=2608"}],"version-history":[{"count":1,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/2608\/revisions"}],"predecessor-version":[{"id":2610,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/2608\/revisions\/2610"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media\/2609"}],"wp:attachment":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media?parent=2608"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/categories?post=2608"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/tags?post=2608"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}