{"id":2626,"date":"2017-04-27T07:20:46","date_gmt":"2017-04-27T06:20:46","guid":{"rendered":"http:\/\/www.jaif.or.jp\/en\/?p=2626"},"modified":"2017-05-17T08:28:24","modified_gmt":"2017-05-17T07:28:24","slug":"takahama-4-to-restart-in-may-first-such-case-following-court-ruling-to-suspend-operation","status":"publish","type":"post","link":"https:\/\/www.jaif.or.jp\/en\/news\/2626","title":{"rendered":"Takahama-4 to Restart in May, First Such Case Following Court Ruling to Suspend Operation"},"content":{"rendered":"<p>If plans proceed as planned, it will be the first time the two units have operated in one year and three months. That would bring the total of domestic NPPs in operation to five, including Sendai-1 and -2 of the Kyushu Electric Power Co. (Kagoshima Prefecture), and Ikata-3 of the Shikoku Electric Power Co. (Ehime Prefecture). Kansai EP will begin loading fuel to Unit 4 on April 28.<\/p>\n<p>According to the schedule, Unit 4 will start power generation and connect to the grid at the end of May, shifting to commercial operation in the middle of June. Meanwhile, fuel will be loaded into Unit 3 in mid-May, with grid connection targeted to begin in early June, and commercial operation in early July. The two units were each loaded with 157 fuel assemblies, of which four in Unit 4 and 24 in Unit 3 consists of MOX fuel.<\/p>\n<p><a href=\"https:\/\/www.jaif.or.jp\/en-renew\/takahama-4-restarted-takahama-3-resumes-commercial-service\/\" target=\"_blank\" rel=\"noopener noreferrer\">The two units had been restarted<\/a> in January and February of last year, but <a href=\"https:\/\/www.jaif.or.jp\/en-renew\/otsu-district-court-orders-halt-to-operation-of-takahama-3-4-npps\/\" target=\"_blank\" rel=\"noopener noreferrer\">were both suspended in March 2016<\/a>, due to a temporary disposition ruling by the Otsu District Court. In March of this year,<a href=\"https:\/\/www.jaif.or.jp\/en-renew\/osaka-high-court-lifts-injunction-against-operation-of-takahama-3-and-4\/\" target=\"_blank\" rel=\"noopener noreferrer\"> the Osaka High Court approved Kansai EP&#8217;s appeal, canceling the provisional disposition,<\/a> bringing the reactors into a legally operable state.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>If plans proceed as planned, it will be the first time the two units have operated in one year and three months. That would bring the total of domestic NPPs in operation to five, including Sendai-1 and -2 of the Kyushu Electric Power Co. (Kagoshima Prefecture), and Ikata-3 of the Shikoku Electric Power Co. (Ehime [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":945,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1,6,8,7],"tags":[345,45,91,20,136,19,18,284,285],"class_list":["post-2626","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-npps","category-policies","category-regulation-safety","tag-court","tag-fukui","tag-governor","tag-kansai","tag-local-government","tag-nra","tag-restart","tag-takahama-3","tag-takahama-4"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.5.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"If plans proceed as planned, it will be the first time the two units have operated in one year and three months. That would bring the total of domestic NPPs in operation to five, including Sendai-1 and -2 of the Kyushu Electric Power Co. (Kagoshima Prefecture), and Ikata-3 of the Shikoku Electric Power Co. (Ehime\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Kaoru Ohno\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.jaif.or.jp\/en\/news\/2626\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.5.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Takahama-4 to Restart in May, First Such Case Following Court Ruling to Suspend Operation - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:description\" content=\"If plans proceed as planned, it will be the first time the two units have operated in one year and three months. That would bring the total of domestic NPPs in operation to five, including Sendai-1 and -2 of the Kyushu Electric Power Co. (Kagoshima Prefecture), and Ikata-3 of the Shikoku Electric Power Co. (Ehime\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.jaif.or.jp\/en\/news\/2626\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/04\/\u9ad8\u6d5c34\u30ab\u30e9\u30fc-e1429065622370.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/04\/\u9ad8\u6d5c34\u30ab\u30e9\u30fc-e1429065622370.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"310\" \/>\n\t\t<meta property=\"og:image:height\" content=\"250\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2017-04-27T06:20:46+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2017-05-17T07:28:24+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@Atoms_in_Japan\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Takahama-4 to Restart in May, First Such Case Following Court Ruling to Suspend Operation - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta name=\"twitter:description\" content=\"If plans proceed as planned, it will be the first time the two units have operated in one year and three months. That would bring the total of domestic NPPs in operation to five, including Sendai-1 and -2 of the Kyushu Electric Power Co. (Kagoshima Prefecture), and Ikata-3 of the Shikoku Electric Power Co. (Ehime\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/04\/\u9ad8\u6d5c34\u30ab\u30e9\u30fc-e1429065622370.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/2626#blogposting\",\"name\":\"Takahama-4 to Restart in May, First Such Case Following Court Ruling to Suspend Operation - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"headline\":\"Takahama-4 to Restart in May, First Such Case Following Court Ruling to Suspend Operation\",\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/wp-content\\\/uploads\\\/2015\\\/04\\\/\\u9ad8\\u6d5c34\\u30ab\\u30e9\\u30fc-e1429065622370.jpg\",\"width\":310,\"height\":250,\"caption\":\"Takahama-3&4\"},\"datePublished\":\"2017-04-27T07:20:46+09:00\",\"dateModified\":\"2017-05-17T08:28:24+09:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/2626#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/2626#webpage\"},\"articleSection\":\"News, NPPs, Policies, Regulation &amp; Safety, court, Fukui, Governor, Kansai, local government, NRA, restart, Takahama-3, Takahama-4\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/2626#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"position\":2,\"name\":\"News\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"position\":3,\"name\":\"NPPs\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/2626#listItem\",\"name\":\"Takahama-4 to Restart in May, First Such Case Following Court Ruling to Suspend Operation\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/2626#listItem\",\"position\":4,\"name\":\"Takahama-4 to Restart in May, First Such Case Following Court Ruling to Suspend Operation\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno\",\"name\":\"Kaoru Ohno\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/2626#webpage\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/2626\",\"name\":\"Takahama-4 to Restart in May, First Such Case Following Court Ruling to Suspend Operation - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"description\":\"If plans proceed as planned, it will be the first time the two units have operated in one year and three months. That would bring the total of domestic NPPs in operation to five, including Sendai-1 and -2 of the Kyushu Electric Power Co. (Kagoshima Prefecture), and Ikata-3 of the Shikoku Electric Power Co. (Ehime\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/2626#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/wp-content\\\/uploads\\\/2015\\\/04\\\/\\u9ad8\\u6d5c34\\u30ab\\u30e9\\u30fc-e1429065622370.jpg\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/2626\\\/#mainImage\",\"width\":310,\"height\":250,\"caption\":\"Takahama-3&4\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/2626#mainImage\"},\"datePublished\":\"2017-04-27T07:20:46+09:00\",\"dateModified\":\"2017-05-17T08:28:24+09:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Takahama-4 to Restart in May, First Such Case Following Court Ruling to Suspend Operation - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"If plans proceed as planned, it will be the first time the two units have operated in one year and three months. That would bring the total of domestic NPPs in operation to five, including Sendai-1 and -2 of the Kyushu Electric Power Co. (Kagoshima Prefecture), and Ikata-3 of the Shikoku Electric Power Co. (Ehime","canonical_url":"https:\/\/www.jaif.or.jp\/en\/news\/2626","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.jaif.or.jp\/en\/news\/2626#blogposting","name":"Takahama-4 to Restart in May, First Such Case Following Court Ruling to Suspend Operation - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","headline":"Takahama-4 to Restart in May, First Such Case Following Court Ruling to Suspend Operation","author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/04\/\u9ad8\u6d5c34\u30ab\u30e9\u30fc-e1429065622370.jpg","width":310,"height":250,"caption":"Takahama-3&4"},"datePublished":"2017-04-27T07:20:46+09:00","dateModified":"2017-05-17T08:28:24+09:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/2626#webpage"},"isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/2626#webpage"},"articleSection":"News, NPPs, Policies, Regulation &amp; Safety, court, Fukui, Governor, Kansai, local government, NRA, restart, Takahama-3, Takahama-4"},{"@type":"BreadcrumbList","@id":"https:\/\/www.jaif.or.jp\/en\/news\/2626#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.jaif.or.jp\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","position":2,"name":"News","item":"https:\/\/www.jaif.or.jp\/en\/news","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","position":3,"name":"NPPs","item":"https:\/\/www.jaif.or.jp\/en\/news\/npps","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/2626#listItem","name":"Takahama-4 to Restart in May, First Such Case Following Court Ruling to Suspend Operation"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/2626#listItem","position":4,"name":"Takahama-4 to Restart in May, First Such Case Following Court Ruling to Suspend Operation","previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"}}]},{"@type":"Organization","@id":"https:\/\/www.jaif.or.jp\/en\/#organization","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","url":"https:\/\/www.jaif.or.jp\/en\/"},{"@type":"Person","@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author","url":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno","name":"Kaoru Ohno"},{"@type":"WebPage","@id":"https:\/\/www.jaif.or.jp\/en\/news\/2626#webpage","url":"https:\/\/www.jaif.or.jp\/en\/news\/2626","name":"Takahama-4 to Restart in May, First Such Case Following Court Ruling to Suspend Operation - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"If plans proceed as planned, it will be the first time the two units have operated in one year and three months. That would bring the total of domestic NPPs in operation to five, including Sendai-1 and -2 of the Kyushu Electric Power Co. (Kagoshima Prefecture), and Ikata-3 of the Shikoku Electric Power Co. (Ehime","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/2626#breadcrumblist"},"author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"creator":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/04\/\u9ad8\u6d5c34\u30ab\u30e9\u30fc-e1429065622370.jpg","@id":"https:\/\/www.jaif.or.jp\/en\/news\/2626\/#mainImage","width":310,"height":250,"caption":"Takahama-3&4"},"primaryImageOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/2626#mainImage"},"datePublished":"2017-04-27T07:20:46+09:00","dateModified":"2017-05-17T08:28:24+09:00"},{"@type":"WebSite","@id":"https:\/\/www.jaif.or.jp\/en\/#website","url":"https:\/\/www.jaif.or.jp\/en\/","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:type":"article","og:title":"Takahama-4 to Restart in May, First Such Case Following Court Ruling to Suspend Operation - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:description":"If plans proceed as planned, it will be the first time the two units have operated in one year and three months. That would bring the total of domestic NPPs in operation to five, including Sendai-1 and -2 of the Kyushu Electric Power Co. (Kagoshima Prefecture), and Ikata-3 of the Shikoku Electric Power Co. (Ehime","og:url":"https:\/\/www.jaif.or.jp\/en\/news\/2626","og:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/04\/\u9ad8\u6d5c34\u30ab\u30e9\u30fc-e1429065622370.jpg","og:image:secure_url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/04\/\u9ad8\u6d5c34\u30ab\u30e9\u30fc-e1429065622370.jpg","og:image:width":310,"og:image:height":250,"article:published_time":"2017-04-27T06:20:46+00:00","article:modified_time":"2017-05-17T07:28:24+00:00","twitter:card":"summary_large_image","twitter:site":"@Atoms_in_Japan","twitter:title":"Takahama-4 to Restart in May, First Such Case Following Court Ruling to Suspend Operation - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","twitter:description":"If plans proceed as planned, it will be the first time the two units have operated in one year and three months. That would bring the total of domestic NPPs in operation to five, including Sendai-1 and -2 of the Kyushu Electric Power Co. (Kagoshima Prefecture), and Ikata-3 of the Shikoku Electric Power Co. (Ehime","twitter:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/04\/\u9ad8\u6d5c34\u30ab\u30e9\u30fc-e1429065622370.jpg"},"aioseo_meta_data":{"post_id":"2626","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"limit_modified_date":false,"created":"2022-04-29 13:53:19","updated":"2026-10-29 00:51:45","focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\" title=\"News\">News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\/npps\" title=\"NPPs\">NPPs<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tTakahama-4 to Restart in May, First Such Case Following Court Ruling to Suspend Operation\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.jaif.or.jp\/en\/"},{"label":"News","link":"https:\/\/www.jaif.or.jp\/en\/news"},{"label":"NPPs","link":"https:\/\/www.jaif.or.jp\/en\/news\/npps"},{"label":"Takahama-4 to Restart in May, First Such Case Following Court Ruling to Suspend Operation","link":"https:\/\/www.jaif.or.jp\/en\/news\/2626"}],"_links":{"self":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/2626","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/comments?post=2626"}],"version-history":[{"count":1,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/2626\/revisions"}],"predecessor-version":[{"id":2627,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/2626\/revisions\/2627"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media\/945"}],"wp:attachment":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media?parent=2626"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/categories?post=2626"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/tags?post=2626"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}