{"id":290,"date":"2015-02-06T01:58:32","date_gmt":"2015-02-06T01:58:32","guid":{"rendered":"http:\/\/www.jaif.or.jp\/en\/?p=290"},"modified":"2015-03-25T08:49:25","modified_gmt":"2015-03-25T08:49:25","slug":"kagoshima-governor-comments-on-slow-restart-of-sendai-nps","status":"publish","type":"post","link":"https:\/\/www.jaif.or.jp\/en\/news\/290","title":{"rendered":"Kagoshima Governor Comments on Slow Restart of Sendai NPS"},"content":{"rendered":"<p>At a press conference on January 30, Governor Yuichiro Ito of Kagoshima Prefecture commented on the slow pace toward restarting the Sendai Nuclear Power Station (NPS), owned and operated by the Kyushu Electric Power Co. The reactors have been shut down since the March 2011 accident at the Fukushima Daiichi NPS following a tsunami.<\/p>\n<p>Referring to the cautious approach of the Nuclear Regulation Authority (NRA) in its examination, he said, \u201cIt was inevitable that it would take time given that this is the first case. There is nothing for us to do now but wait for a while and see how things will develop.\u201d<\/p>\n<p>The governor next commented the on-site inspection made at the NPS one day earlier, on January 29, by Kagoshima Prefecture and nine municipalities in the neighborhood of the NPS.<\/p>\n<p>He said that after the power company explained its emergency action plan, the governmental officials confirmed the deployment of disaster prevention materials and equipment, as well as the state of the emergency response office required under the new regulatory standards.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>At a press conference on January 30, Governor Yuichiro Ito of Kagoshima Prefecture commented on the slow pace toward restarting the Sendai Nuclear Power Station (NPS), owned and operated by the Kyushu Electric Power Co. The reactors have been shut down since the March 2011 accident at the Fukushima Daiichi NPS following a tsunami. Referring [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":296,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1,6,7],"tags":[38,37,18,36,271,286],"class_list":["post-290","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-npps","category-regulation-safety","tag-kagoshima","tag-kyushu","tag-restart","tag-sendai","tag-sendai-1","tag-sendai-2"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.5.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"At a press conference on January 30, Governor Yuichiro Ito of Kagoshima Prefecture commented on the slow pace toward restarting the Sendai Nuclear Power Station (NPS), owned and operated by the Kyushu Electric Power Co. The reactors have been shut down since the March 2011 accident at the Fukushima Daiichi NPS following a tsunami. Referring\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Kaoru Ohno\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.jaif.or.jp\/en\/news\/290\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.5.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Kagoshima Governor Comments on Slow Restart of Sendai NPS - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:description\" content=\"At a press conference on January 30, Governor Yuichiro Ito of Kagoshima Prefecture commented on the slow pace toward restarting the Sendai Nuclear Power Station (NPS), owned and operated by the Kyushu Electric Power Co. The reactors have been shut down since the March 2011 accident at the Fukushima Daiichi NPS following a tsunami. Referring\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.jaif.or.jp\/en\/news\/290\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/02\/\u5ddd\u5185\u5916\u89b3\u5199\u771f\uff13\uff08\u6700\u65b0\uff09-e1424139918191.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/02\/\u5ddd\u5185\u5916\u89b3\u5199\u771f\uff13\uff08\u6700\u65b0\uff09-e1424139918191.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"310\" \/>\n\t\t<meta property=\"og:image:height\" content=\"205\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2015-02-06T01:58:32+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2015-03-25T08:49:25+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@Atoms_in_Japan\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Kagoshima Governor Comments on Slow Restart of Sendai NPS - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta name=\"twitter:description\" content=\"At a press conference on January 30, Governor Yuichiro Ito of Kagoshima Prefecture commented on the slow pace toward restarting the Sendai Nuclear Power Station (NPS), owned and operated by the Kyushu Electric Power Co. The reactors have been shut down since the March 2011 accident at the Fukushima Daiichi NPS following a tsunami. Referring\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/02\/\u5ddd\u5185\u5916\u89b3\u5199\u771f\uff13\uff08\u6700\u65b0\uff09-e1424139918191.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/290#blogposting\",\"name\":\"Kagoshima Governor Comments on Slow Restart of Sendai NPS - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"headline\":\"Kagoshima Governor Comments on Slow Restart of Sendai NPS\",\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/wp-content\\\/uploads\\\/2015\\\/02\\\/\\u5ddd\\u5185\\u5916\\u89b3\\u5199\\u771f\\uff13\\uff08\\u6700\\u65b0\\uff09-e1424139918191.jpg\",\"width\":310,\"height\":205,\"caption\":\"There are 2 PWRs at Sendai NPS, both of which have a gross electrical output of 890 MW.\"},\"datePublished\":\"2015-02-06T01:58:32+09:00\",\"dateModified\":\"2015-03-25T08:49:25+09:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/290#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/290#webpage\"},\"articleSection\":\"News, NPPs, Regulation &amp; Safety, Kagoshima, Kyushu, restart, Sendai, Sendai-1, Sendai-2\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/290#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"position\":2,\"name\":\"News\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"position\":3,\"name\":\"NPPs\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/290#listItem\",\"name\":\"Kagoshima Governor Comments on Slow Restart of Sendai NPS\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/290#listItem\",\"position\":4,\"name\":\"Kagoshima Governor Comments on Slow Restart of Sendai NPS\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno\",\"name\":\"Kaoru Ohno\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/290#webpage\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/290\",\"name\":\"Kagoshima Governor Comments on Slow Restart of Sendai NPS - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"description\":\"At a press conference on January 30, Governor Yuichiro Ito of Kagoshima Prefecture commented on the slow pace toward restarting the Sendai Nuclear Power Station (NPS), owned and operated by the Kyushu Electric Power Co. The reactors have been shut down since the March 2011 accident at the Fukushima Daiichi NPS following a tsunami. Referring\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/290#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/wp-content\\\/uploads\\\/2015\\\/02\\\/\\u5ddd\\u5185\\u5916\\u89b3\\u5199\\u771f\\uff13\\uff08\\u6700\\u65b0\\uff09-e1424139918191.jpg\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/290\\\/#mainImage\",\"width\":310,\"height\":205,\"caption\":\"There are 2 PWRs at Sendai NPS, both of which have a gross electrical output of 890 MW.\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/290#mainImage\"},\"datePublished\":\"2015-02-06T01:58:32+09:00\",\"dateModified\":\"2015-03-25T08:49:25+09:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Kagoshima Governor Comments on Slow Restart of Sendai NPS - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"At a press conference on January 30, Governor Yuichiro Ito of Kagoshima Prefecture commented on the slow pace toward restarting the Sendai Nuclear Power Station (NPS), owned and operated by the Kyushu Electric Power Co. The reactors have been shut down since the March 2011 accident at the Fukushima Daiichi NPS following a tsunami. Referring","canonical_url":"https:\/\/www.jaif.or.jp\/en\/news\/290","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.jaif.or.jp\/en\/news\/290#blogposting","name":"Kagoshima Governor Comments on Slow Restart of Sendai NPS - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","headline":"Kagoshima Governor Comments on Slow Restart of Sendai NPS","author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/02\/\u5ddd\u5185\u5916\u89b3\u5199\u771f\uff13\uff08\u6700\u65b0\uff09-e1424139918191.jpg","width":310,"height":205,"caption":"There are 2 PWRs at Sendai NPS, both of which have a gross electrical output of 890 MW."},"datePublished":"2015-02-06T01:58:32+09:00","dateModified":"2015-03-25T08:49:25+09:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/290#webpage"},"isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/290#webpage"},"articleSection":"News, NPPs, Regulation &amp; Safety, Kagoshima, Kyushu, restart, Sendai, Sendai-1, Sendai-2"},{"@type":"BreadcrumbList","@id":"https:\/\/www.jaif.or.jp\/en\/news\/290#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.jaif.or.jp\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","position":2,"name":"News","item":"https:\/\/www.jaif.or.jp\/en\/news","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","position":3,"name":"NPPs","item":"https:\/\/www.jaif.or.jp\/en\/news\/npps","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/290#listItem","name":"Kagoshima Governor Comments on Slow Restart of Sendai NPS"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/290#listItem","position":4,"name":"Kagoshima Governor Comments on Slow Restart of Sendai NPS","previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"}}]},{"@type":"Organization","@id":"https:\/\/www.jaif.or.jp\/en\/#organization","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","url":"https:\/\/www.jaif.or.jp\/en\/"},{"@type":"Person","@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author","url":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno","name":"Kaoru Ohno"},{"@type":"WebPage","@id":"https:\/\/www.jaif.or.jp\/en\/news\/290#webpage","url":"https:\/\/www.jaif.or.jp\/en\/news\/290","name":"Kagoshima Governor Comments on Slow Restart of Sendai NPS - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"At a press conference on January 30, Governor Yuichiro Ito of Kagoshima Prefecture commented on the slow pace toward restarting the Sendai Nuclear Power Station (NPS), owned and operated by the Kyushu Electric Power Co. The reactors have been shut down since the March 2011 accident at the Fukushima Daiichi NPS following a tsunami. Referring","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/290#breadcrumblist"},"author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"creator":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/02\/\u5ddd\u5185\u5916\u89b3\u5199\u771f\uff13\uff08\u6700\u65b0\uff09-e1424139918191.jpg","@id":"https:\/\/www.jaif.or.jp\/en\/news\/290\/#mainImage","width":310,"height":205,"caption":"There are 2 PWRs at Sendai NPS, both of which have a gross electrical output of 890 MW."},"primaryImageOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/290#mainImage"},"datePublished":"2015-02-06T01:58:32+09:00","dateModified":"2015-03-25T08:49:25+09:00"},{"@type":"WebSite","@id":"https:\/\/www.jaif.or.jp\/en\/#website","url":"https:\/\/www.jaif.or.jp\/en\/","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:type":"article","og:title":"Kagoshima Governor Comments on Slow Restart of Sendai NPS - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:description":"At a press conference on January 30, Governor Yuichiro Ito of Kagoshima Prefecture commented on the slow pace toward restarting the Sendai Nuclear Power Station (NPS), owned and operated by the Kyushu Electric Power Co. The reactors have been shut down since the March 2011 accident at the Fukushima Daiichi NPS following a tsunami. Referring","og:url":"https:\/\/www.jaif.or.jp\/en\/news\/290","og:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/02\/\u5ddd\u5185\u5916\u89b3\u5199\u771f\uff13\uff08\u6700\u65b0\uff09-e1424139918191.jpg","og:image:secure_url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/02\/\u5ddd\u5185\u5916\u89b3\u5199\u771f\uff13\uff08\u6700\u65b0\uff09-e1424139918191.jpg","og:image:width":310,"og:image:height":205,"article:published_time":"2015-02-06T01:58:32+00:00","article:modified_time":"2015-03-25T08:49:25+00:00","twitter:card":"summary_large_image","twitter:site":"@Atoms_in_Japan","twitter:title":"Kagoshima Governor Comments on Slow Restart of Sendai NPS - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","twitter:description":"At a press conference on January 30, Governor Yuichiro Ito of Kagoshima Prefecture commented on the slow pace toward restarting the Sendai Nuclear Power Station (NPS), owned and operated by the Kyushu Electric Power Co. The reactors have been shut down since the March 2011 accident at the Fukushima Daiichi NPS following a tsunami. Referring","twitter:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/02\/\u5ddd\u5185\u5916\u89b3\u5199\u771f\uff13\uff08\u6700\u65b0\uff09-e1424139918191.jpg"},"aioseo_meta_data":{"post_id":"290","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"limit_modified_date":false,"created":"2022-04-29 13:12:15","updated":"2026-10-28 23:47:02","focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\" title=\"News\">News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\/npps\" title=\"NPPs\">NPPs<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tKagoshima Governor Comments on Slow Restart of Sendai NPS\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.jaif.or.jp\/en\/"},{"label":"News","link":"https:\/\/www.jaif.or.jp\/en\/news"},{"label":"NPPs","link":"https:\/\/www.jaif.or.jp\/en\/news\/npps"},{"label":"Kagoshima Governor Comments on Slow Restart of Sendai NPS","link":"https:\/\/www.jaif.or.jp\/en\/news\/290"}],"_links":{"self":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/290","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/comments?post=290"}],"version-history":[{"count":1,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/290\/revisions"}],"predecessor-version":[{"id":291,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/290\/revisions\/291"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media\/296"}],"wp:attachment":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media?parent=290"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/categories?post=290"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/tags?post=290"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}