{"id":2919,"date":"2017-11-08T09:20:08","date_gmt":"2017-11-08T09:20:08","guid":{"rendered":"http:\/\/www.jaif.or.jp\/en\/?p=2919"},"modified":"2018-01-05T01:11:29","modified_gmt":"2018-01-05T01:11:29","slug":"fuel-removal-system-leaves-yokohama-headed-for-fukushima-daiichi-3","status":"publish","type":"post","link":"https:\/\/www.jaif.or.jp\/en\/news\/2919","title":{"rendered":"Fuel Removal System Leaves Yokohama, Headed for Fukushima Daiichi-3"},"content":{"rendered":"<p>Before the roof can be completed, though, a fuel removal system (FRS) must first be installed on the operating floor at the top of the reactor building. On November 5, the system was shipped from Honmoku Pier in Yokohama port, located along Tokyo Bay.<\/p>\n<p>The FRS consists of both a fuel handling machine (FHM) and a crane. The FHM is designed to remove debris and fuel from the spent fuel pool in a safe and secure manner, as well as to minimize radiation exposure. Operations to remove the debris and fuel can be monitored by cameras installed on two manipulators. Various auxiliary tools (such as cables, rebar-cutting devices, and grippers) can be installed at the tip of each manipulator.<\/p>\n<p>After the fuel is removed from the pool, it will be placed in a transfer vessel, lifted by crane, and moved to a ground-level floor of the reactor building for transportation to a temporary storage site.<\/p>\n<p>Using multiple cameras and other devices, the FRS will be remotely operated from a building near the Main Anti-Earthquake Building: an approach not seen in the past. Toshiba Energy Systems &amp; Solutions Corporation, which made the system, carried out extensive testing and training of operators before it shipped the FRS to the Fukushima Daiichi NPPs.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-2921\" src=\"https:\/\/www.jaif.or.jp\/en-renew\/wp-content\/uploads\/2017\/11\/DSC09874-2-e1510132660289.jpg\" alt=\"FHM (foreground) and crane are loaded onto a vessel at the port (photo provided by Toshiba Corporation).\" width=\"310\" height=\"207\" \/><\/p>\n<p>After arrival, the FRS will be installed at Unit 3 around the middle of this month.<\/p>\n<p>According to the schedule announced by TEPCO, the installation of the dome will be completed in early fiscal 2018 (starting in April of next year) and removal will begin about around October or so.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Before the roof can be completed, though, a fuel removal system (FRS) must first be installed on the operating floor at the top of the reactor building. On November 5, the system was shipped from Honmoku Pier in Yokohama port, located along Tokyo Bay. The FRS consists of both a fuel handling machine (FHM) and [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":2922,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[10,1],"tags":[85,535,326,21,82,28,182,125,23,123],"class_list":["post-2919","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-fukushima","category-news","tag-decommissioning","tag-fhm","tag-fuel-debris","tag-fukushima-daiichi","tag-ndf","tag-radiation","tag-robot","tag-spent-fuel","tag-tepco","tag-toshiba"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.4 - aioseo.com -->\n\t<meta name=\"description\" content=\"Before the roof can be completed, though, a fuel removal system (FRS) must first be installed on the operating floor at the top of the reactor building. On November 5, the system was shipped from Honmoku Pier in Yokohama port, located along Tokyo Bay. The FRS consists of both a fuel handling machine (FHM) and\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Kaoru Ohno\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.jaif.or.jp\/en\/news\/2919\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.4\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Fuel Removal System Leaves Yokohama, Headed for Fukushima Daiichi-3 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:description\" content=\"Before the roof can be completed, though, a fuel removal system (FRS) must first be installed on the operating floor at the top of the reactor building. On November 5, the system was shipped from Honmoku Pier in Yokohama port, located along Tokyo Bay. The FRS consists of both a fuel handling machine (FHM) and\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.jaif.or.jp\/en\/news\/2919\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2017\/11\/DSC09905-2-e1510132453726.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2017\/11\/DSC09905-2-e1510132453726.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"310\" \/>\n\t\t<meta property=\"og:image:height\" content=\"465\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2017-11-08T09:20:08+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2018-01-05T01:11:29+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@Atoms_in_Japan\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Fuel Removal System Leaves Yokohama, Headed for Fukushima Daiichi-3 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Before the roof can be completed, though, a fuel removal system (FRS) must first be installed on the operating floor at the top of the reactor building. On November 5, the system was shipped from Honmoku Pier in Yokohama port, located along Tokyo Bay. The FRS consists of both a fuel handling machine (FHM) and\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2017\/11\/DSC09905-2-e1510132453726.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/2919#blogposting\",\"name\":\"Fuel Removal System Leaves Yokohama, Headed for Fukushima Daiichi-3 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"headline\":\"Fuel Removal System Leaves Yokohama, Headed for Fukushima Daiichi-3\",\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/wp-content\\\/uploads\\\/2017\\\/11\\\/DSC09905-2-e1510132453726.jpg\",\"width\":310,\"height\":465,\"caption\":\"The vessel leaves the port at dawn for the Fukushima Daiichi NPS (photo provided by Toshiba Corporation).\"},\"datePublished\":\"2017-11-08T09:20:08+09:00\",\"dateModified\":\"2018-01-05T01:11:29+09:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/2919#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/2919#webpage\"},\"articleSection\":\"Fukushima, News, decommissioning, FHM, fuel debris, Fukushima Daiichi, NDF, radiation, robot, spent fuel, TEPCO, Toshiba\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/2919#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"position\":2,\"name\":\"News\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/fukushima#listItem\",\"name\":\"Fukushima\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/fukushima#listItem\",\"position\":3,\"name\":\"Fukushima\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/fukushima\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/2919#listItem\",\"name\":\"Fuel Removal System Leaves Yokohama, Headed for Fukushima Daiichi-3\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/2919#listItem\",\"position\":4,\"name\":\"Fuel Removal System Leaves Yokohama, Headed for Fukushima Daiichi-3\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/fukushima#listItem\",\"name\":\"Fukushima\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno\",\"name\":\"Kaoru Ohno\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/2919#webpage\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/2919\",\"name\":\"Fuel Removal System Leaves Yokohama, Headed for Fukushima Daiichi-3 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"description\":\"Before the roof can be completed, though, a fuel removal system (FRS) must first be installed on the operating floor at the top of the reactor building. On November 5, the system was shipped from Honmoku Pier in Yokohama port, located along Tokyo Bay. The FRS consists of both a fuel handling machine (FHM) and\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/2919#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/wp-content\\\/uploads\\\/2017\\\/11\\\/DSC09905-2-e1510132453726.jpg\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/2919\\\/#mainImage\",\"width\":310,\"height\":465,\"caption\":\"The vessel leaves the port at dawn for the Fukushima Daiichi NPS (photo provided by Toshiba Corporation).\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/2919#mainImage\"},\"datePublished\":\"2017-11-08T09:20:08+09:00\",\"dateModified\":\"2018-01-05T01:11:29+09:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Fuel Removal System Leaves Yokohama, Headed for Fukushima Daiichi-3 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"Before the roof can be completed, though, a fuel removal system (FRS) must first be installed on the operating floor at the top of the reactor building. On November 5, the system was shipped from Honmoku Pier in Yokohama port, located along Tokyo Bay. The FRS consists of both a fuel handling machine (FHM) and","canonical_url":"https:\/\/www.jaif.or.jp\/en\/news\/2919","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.jaif.or.jp\/en\/news\/2919#blogposting","name":"Fuel Removal System Leaves Yokohama, Headed for Fukushima Daiichi-3 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","headline":"Fuel Removal System Leaves Yokohama, Headed for Fukushima Daiichi-3","author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2017\/11\/DSC09905-2-e1510132453726.jpg","width":310,"height":465,"caption":"The vessel leaves the port at dawn for the Fukushima Daiichi NPS (photo provided by Toshiba Corporation)."},"datePublished":"2017-11-08T09:20:08+09:00","dateModified":"2018-01-05T01:11:29+09:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/2919#webpage"},"isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/2919#webpage"},"articleSection":"Fukushima, News, decommissioning, FHM, fuel debris, Fukushima Daiichi, NDF, radiation, robot, spent fuel, TEPCO, Toshiba"},{"@type":"BreadcrumbList","@id":"https:\/\/www.jaif.or.jp\/en\/news\/2919#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.jaif.or.jp\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","position":2,"name":"News","item":"https:\/\/www.jaif.or.jp\/en\/news","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/fukushima#listItem","name":"Fukushima"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/fukushima#listItem","position":3,"name":"Fukushima","item":"https:\/\/www.jaif.or.jp\/en\/news\/fukushima","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/2919#listItem","name":"Fuel Removal System Leaves Yokohama, Headed for Fukushima Daiichi-3"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/2919#listItem","position":4,"name":"Fuel Removal System Leaves Yokohama, Headed for Fukushima Daiichi-3","previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/fukushima#listItem","name":"Fukushima"}}]},{"@type":"Organization","@id":"https:\/\/www.jaif.or.jp\/en\/#organization","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","url":"https:\/\/www.jaif.or.jp\/en\/"},{"@type":"Person","@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author","url":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno","name":"Kaoru Ohno"},{"@type":"WebPage","@id":"https:\/\/www.jaif.or.jp\/en\/news\/2919#webpage","url":"https:\/\/www.jaif.or.jp\/en\/news\/2919","name":"Fuel Removal System Leaves Yokohama, Headed for Fukushima Daiichi-3 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"Before the roof can be completed, though, a fuel removal system (FRS) must first be installed on the operating floor at the top of the reactor building. On November 5, the system was shipped from Honmoku Pier in Yokohama port, located along Tokyo Bay. The FRS consists of both a fuel handling machine (FHM) and","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/2919#breadcrumblist"},"author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"creator":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2017\/11\/DSC09905-2-e1510132453726.jpg","@id":"https:\/\/www.jaif.or.jp\/en\/news\/2919\/#mainImage","width":310,"height":465,"caption":"The vessel leaves the port at dawn for the Fukushima Daiichi NPS (photo provided by Toshiba Corporation)."},"primaryImageOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/2919#mainImage"},"datePublished":"2017-11-08T09:20:08+09:00","dateModified":"2018-01-05T01:11:29+09:00"},{"@type":"WebSite","@id":"https:\/\/www.jaif.or.jp\/en\/#website","url":"https:\/\/www.jaif.or.jp\/en\/","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:type":"article","og:title":"Fuel Removal System Leaves Yokohama, Headed for Fukushima Daiichi-3 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:description":"Before the roof can be completed, though, a fuel removal system (FRS) must first be installed on the operating floor at the top of the reactor building. On November 5, the system was shipped from Honmoku Pier in Yokohama port, located along Tokyo Bay. The FRS consists of both a fuel handling machine (FHM) and","og:url":"https:\/\/www.jaif.or.jp\/en\/news\/2919","og:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2017\/11\/DSC09905-2-e1510132453726.jpg","og:image:secure_url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2017\/11\/DSC09905-2-e1510132453726.jpg","og:image:width":310,"og:image:height":465,"article:published_time":"2017-11-08T09:20:08+00:00","article:modified_time":"2018-01-05T01:11:29+00:00","twitter:card":"summary_large_image","twitter:site":"@Atoms_in_Japan","twitter:title":"Fuel Removal System Leaves Yokohama, Headed for Fukushima Daiichi-3 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","twitter:description":"Before the roof can be completed, though, a fuel removal system (FRS) must first be installed on the operating floor at the top of the reactor building. On November 5, the system was shipped from Honmoku Pier in Yokohama port, located along Tokyo Bay. The FRS consists of both a fuel handling machine (FHM) and","twitter:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2017\/11\/DSC09905-2-e1510132453726.jpg"},"aioseo_meta_data":{"post_id":"2919","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"limit_modified_date":false,"created":"2022-04-29 13:58:16","updated":"2026-10-29 01:00:04","focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\" title=\"News\">News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\/fukushima\" title=\"Fukushima\">Fukushima<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tFuel Removal System Leaves Yokohama, Headed for Fukushima Daiichi-3\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.jaif.or.jp\/en\/"},{"label":"News","link":"https:\/\/www.jaif.or.jp\/en\/news"},{"label":"Fukushima","link":"https:\/\/www.jaif.or.jp\/en\/news\/fukushima"},{"label":"Fuel Removal System Leaves Yokohama, Headed for Fukushima Daiichi-3","link":"https:\/\/www.jaif.or.jp\/en\/news\/2919"}],"_links":{"self":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/2919","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/comments?post=2919"}],"version-history":[{"count":3,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/2919\/revisions"}],"predecessor-version":[{"id":2926,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/2919\/revisions\/2926"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media\/2922"}],"wp:attachment":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media?parent=2919"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/categories?post=2919"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/tags?post=2919"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}