{"id":297,"date":"2015-02-06T02:26:39","date_gmt":"2015-02-06T02:26:39","guid":{"rendered":"http:\/\/www.jaif.or.jp\/en\/?p=297"},"modified":"2015-03-25T08:47:32","modified_gmt":"2015-03-25T08:47:32","slug":"decision-on-decommissioning-mihama-1-2-to-come-before-april-2015","status":"publish","type":"post","link":"https:\/\/www.jaif.or.jp\/en\/news\/297","title":{"rendered":"Decision on Decommissioning Mihama-1 &#038; -2 to Come Before April 2015"},"content":{"rendered":"<p>Kansai EP said it would consider measures necessary to meet the new regulatory standards and decide sometime before the end of the fiscal year (i.e., by March 31, 2015) whether or not to extend the units\u2019 service periods. Mihama-1 is a 340 MW-class PWR and Mihama-2 is a 500 MW-class PWR.<\/p>\n<p>Regarding Takahama-1 &#038; -2 (PWRs, 826 MW each), which have been operating for 40 and 39 years, respectively, and for which legally required special inspections to extend their service periods have been underway since December 2014, Kansai EP said it would file applications for permission to change a reactor installation before the end of the fiscal year, or by March 31, 2015.<\/p>\n<p>The power company also plans to file a similar application for Mihama-3 (PWR, 826 MW), so far operating for 38 years, and is also preparing applications for its Ohi-1 &#038; -2 (PWRs, 1175 MW each), both now operating for 35 years.<\/p>\n<p>The Nuclear Regulation Authority (NRA) has been examining four units \u2014 Takahama-3 &#038; -4 (PWRs, 870 MW each) and Ohi-3 &#038; -4 (PWRs, 1180 MW each) \u2014 for compatibility with the new regulatory standards.<\/p>\n<p>Because Mihama-1 &#038; -2 and Takahama-1 &#038; -2 have all been operating for 40 years or more, Kansai EP will have to file applications with the NRA between April and July this year if it wishes to extend their service periods. If so, special inspections will be required.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Kansai EP said it would consider measures necessary to meet the new regulatory standards and decide sometime before the end of the fiscal year (i.e., by March 31, 2015) whether or not to extend the units\u2019 service periods. Mihama-1 is a 340 MW-class PWR and Mihama-2 is a 500 MW-class PWR. Regarding Takahama-1 &#038; -2 [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":298,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1,6,7],"tags":[46,45,20,44,273,274,18],"class_list":["post-297","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-npps","category-regulation-safety","tag-decommission","tag-fukui","tag-kansai","tag-mihama","tag-mihama-1","tag-mihama-2","tag-restart"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.5.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"Kansai EP said it would consider measures necessary to meet the new regulatory standards and decide sometime before the end of the fiscal year (i.e., by March 31, 2015) whether or not to extend the units\u2019 service periods. Mihama-1 is a 340 MW-class PWR and Mihama-2 is a 500 MW-class PWR. Regarding Takahama-1 &amp; -2\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Kaoru Ohno\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.jaif.or.jp\/en\/news\/297\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.5.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Decision on Decommissioning Mihama-1 &amp; -2 to Come Before April 2015 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:description\" content=\"Kansai EP said it would consider measures necessary to meet the new regulatory standards and decide sometime before the end of the fiscal year (i.e., by March 31, 2015) whether or not to extend the units\u2019 service periods. Mihama-1 is a 340 MW-class PWR and Mihama-2 is a 500 MW-class PWR. Regarding Takahama-1 &amp; -2\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.jaif.or.jp\/en\/news\/297\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/02\/\u7f8e\u6d5c\u767a\u96fb\u6240\u5168\u666f-06.8\u5165\u624b-e1424140146130.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/02\/\u7f8e\u6d5c\u767a\u96fb\u6240\u5168\u666f-06.8\u5165\u624b-e1424140146130.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"310\" \/>\n\t\t<meta property=\"og:image:height\" content=\"242\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2015-02-06T02:26:39+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2015-03-25T08:47:32+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@Atoms_in_Japan\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Decision on Decommissioning Mihama-1 &amp; -2 to Come Before April 2015 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Kansai EP said it would consider measures necessary to meet the new regulatory standards and decide sometime before the end of the fiscal year (i.e., by March 31, 2015) whether or not to extend the units\u2019 service periods. Mihama-1 is a 340 MW-class PWR and Mihama-2 is a 500 MW-class PWR. Regarding Takahama-1 &amp; -2\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/02\/\u7f8e\u6d5c\u767a\u96fb\u6240\u5168\u666f-06.8\u5165\u624b-e1424140146130.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/297#blogposting\",\"name\":\"Decision on Decommissioning Mihama-1 & -2 to Come Before April 2015 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"headline\":\"Decision on Decommissioning Mihama-1 &#038; -2 to Come Before April 2015\",\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/wp-content\\\/uploads\\\/2015\\\/02\\\/\\u7f8e\\u6d5c\\u767a\\u96fb\\u6240\\u5168\\u666f-06.8\\u5165\\u624b-e1424140146130.jpg\",\"width\":310,\"height\":242,\"caption\":\"Mihama-1 and -2 are left\"},\"datePublished\":\"2015-02-06T02:26:39+09:00\",\"dateModified\":\"2015-03-25T08:47:32+09:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/297#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/297#webpage\"},\"articleSection\":\"News, NPPs, Regulation &amp; Safety, decommission, Fukui, Kansai, Mihama, Mihama-1, Mihama-2, restart\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/297#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"position\":2,\"name\":\"News\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"position\":3,\"name\":\"NPPs\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/297#listItem\",\"name\":\"Decision on Decommissioning Mihama-1 &#038; -2 to Come Before April 2015\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/297#listItem\",\"position\":4,\"name\":\"Decision on Decommissioning Mihama-1 &#038; -2 to Come Before April 2015\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno\",\"name\":\"Kaoru Ohno\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/297#webpage\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/297\",\"name\":\"Decision on Decommissioning Mihama-1 & -2 to Come Before April 2015 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"description\":\"Kansai EP said it would consider measures necessary to meet the new regulatory standards and decide sometime before the end of the fiscal year (i.e., by March 31, 2015) whether or not to extend the units\\u2019 service periods. Mihama-1 is a 340 MW-class PWR and Mihama-2 is a 500 MW-class PWR. Regarding Takahama-1 & -2\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/297#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/wp-content\\\/uploads\\\/2015\\\/02\\\/\\u7f8e\\u6d5c\\u767a\\u96fb\\u6240\\u5168\\u666f-06.8\\u5165\\u624b-e1424140146130.jpg\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/297\\\/#mainImage\",\"width\":310,\"height\":242,\"caption\":\"Mihama-1 and -2 are left\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/297#mainImage\"},\"datePublished\":\"2015-02-06T02:26:39+09:00\",\"dateModified\":\"2015-03-25T08:47:32+09:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Decision on Decommissioning Mihama-1 & -2 to Come Before April 2015 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"Kansai EP said it would consider measures necessary to meet the new regulatory standards and decide sometime before the end of the fiscal year (i.e., by March 31, 2015) whether or not to extend the units\u2019 service periods. Mihama-1 is a 340 MW-class PWR and Mihama-2 is a 500 MW-class PWR. Regarding Takahama-1 & -2","canonical_url":"https:\/\/www.jaif.or.jp\/en\/news\/297","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.jaif.or.jp\/en\/news\/297#blogposting","name":"Decision on Decommissioning Mihama-1 & -2 to Come Before April 2015 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","headline":"Decision on Decommissioning Mihama-1 &#038; -2 to Come Before April 2015","author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/02\/\u7f8e\u6d5c\u767a\u96fb\u6240\u5168\u666f-06.8\u5165\u624b-e1424140146130.jpg","width":310,"height":242,"caption":"Mihama-1 and -2 are left"},"datePublished":"2015-02-06T02:26:39+09:00","dateModified":"2015-03-25T08:47:32+09:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/297#webpage"},"isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/297#webpage"},"articleSection":"News, NPPs, Regulation &amp; Safety, decommission, Fukui, Kansai, Mihama, Mihama-1, Mihama-2, restart"},{"@type":"BreadcrumbList","@id":"https:\/\/www.jaif.or.jp\/en\/news\/297#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.jaif.or.jp\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","position":2,"name":"News","item":"https:\/\/www.jaif.or.jp\/en\/news","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","position":3,"name":"NPPs","item":"https:\/\/www.jaif.or.jp\/en\/news\/npps","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/297#listItem","name":"Decision on Decommissioning Mihama-1 &#038; -2 to Come Before April 2015"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/297#listItem","position":4,"name":"Decision on Decommissioning Mihama-1 &#038; -2 to Come Before April 2015","previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"}}]},{"@type":"Organization","@id":"https:\/\/www.jaif.or.jp\/en\/#organization","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","url":"https:\/\/www.jaif.or.jp\/en\/"},{"@type":"Person","@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author","url":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno","name":"Kaoru Ohno"},{"@type":"WebPage","@id":"https:\/\/www.jaif.or.jp\/en\/news\/297#webpage","url":"https:\/\/www.jaif.or.jp\/en\/news\/297","name":"Decision on Decommissioning Mihama-1 & -2 to Come Before April 2015 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"Kansai EP said it would consider measures necessary to meet the new regulatory standards and decide sometime before the end of the fiscal year (i.e., by March 31, 2015) whether or not to extend the units\u2019 service periods. Mihama-1 is a 340 MW-class PWR and Mihama-2 is a 500 MW-class PWR. Regarding Takahama-1 & -2","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/297#breadcrumblist"},"author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"creator":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/02\/\u7f8e\u6d5c\u767a\u96fb\u6240\u5168\u666f-06.8\u5165\u624b-e1424140146130.jpg","@id":"https:\/\/www.jaif.or.jp\/en\/news\/297\/#mainImage","width":310,"height":242,"caption":"Mihama-1 and -2 are left"},"primaryImageOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/297#mainImage"},"datePublished":"2015-02-06T02:26:39+09:00","dateModified":"2015-03-25T08:47:32+09:00"},{"@type":"WebSite","@id":"https:\/\/www.jaif.or.jp\/en\/#website","url":"https:\/\/www.jaif.or.jp\/en\/","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:type":"article","og:title":"Decision on Decommissioning Mihama-1 &amp; -2 to Come Before April 2015 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:description":"Kansai EP said it would consider measures necessary to meet the new regulatory standards and decide sometime before the end of the fiscal year (i.e., by March 31, 2015) whether or not to extend the units\u2019 service periods. Mihama-1 is a 340 MW-class PWR and Mihama-2 is a 500 MW-class PWR. Regarding Takahama-1 &amp; -2","og:url":"https:\/\/www.jaif.or.jp\/en\/news\/297","og:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/02\/\u7f8e\u6d5c\u767a\u96fb\u6240\u5168\u666f-06.8\u5165\u624b-e1424140146130.jpg","og:image:secure_url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/02\/\u7f8e\u6d5c\u767a\u96fb\u6240\u5168\u666f-06.8\u5165\u624b-e1424140146130.jpg","og:image:width":310,"og:image:height":242,"article:published_time":"2015-02-06T02:26:39+00:00","article:modified_time":"2015-03-25T08:47:32+00:00","twitter:card":"summary_large_image","twitter:site":"@Atoms_in_Japan","twitter:title":"Decision on Decommissioning Mihama-1 &amp; -2 to Come Before April 2015 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","twitter:description":"Kansai EP said it would consider measures necessary to meet the new regulatory standards and decide sometime before the end of the fiscal year (i.e., by March 31, 2015) whether or not to extend the units\u2019 service periods. Mihama-1 is a 340 MW-class PWR and Mihama-2 is a 500 MW-class PWR. Regarding Takahama-1 &amp; -2","twitter:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/02\/\u7f8e\u6d5c\u767a\u96fb\u6240\u5168\u666f-06.8\u5165\u624b-e1424140146130.jpg"},"aioseo_meta_data":{"post_id":"297","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"limit_modified_date":false,"created":"2022-04-29 13:12:15","updated":"2026-10-28 23:47:02","focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\" title=\"News\">News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\/npps\" title=\"NPPs\">NPPs<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tDecision on Decommissioning Mihama-1 &amp; -2 to Come Before April 2015\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.jaif.or.jp\/en\/"},{"label":"News","link":"https:\/\/www.jaif.or.jp\/en\/news"},{"label":"NPPs","link":"https:\/\/www.jaif.or.jp\/en\/news\/npps"},{"label":"Decision on Decommissioning Mihama-1 &#038; -2 to Come Before April 2015","link":"https:\/\/www.jaif.or.jp\/en\/news\/297"}],"_links":{"self":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/297","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/comments?post=297"}],"version-history":[{"count":1,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/297\/revisions"}],"predecessor-version":[{"id":299,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/297\/revisions\/299"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media\/298"}],"wp:attachment":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media?parent=297"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/categories?post=297"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/tags?post=297"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}