{"id":3097,"date":"2018-03-23T06:15:37","date_gmt":"2018-03-23T06:15:37","guid":{"rendered":"http:\/\/www.jaif.or.jp\/en\/?p=3097"},"modified":"2018-05-07T08:28:28","modified_gmt":"2018-05-07T07:28:28","slug":"seventh-npp-restarted-genkai-3","status":"publish","type":"post","link":"https:\/\/www.jaif.or.jp\/en\/news\/3097","title":{"rendered":"Seventh NPP Restarted: Genkai-3"},"content":{"rendered":"<p>The Genkai-3 resumes operation after 7 years and three months. It is expected to achieve criticality tonight and connect to the grid on March 25. Mixed uranium-plutonium oxide (MOX) fuel is included in the fuel for the unit.<\/p>\n<p>The Genkai-4 NPP, which cleared its compatibility examination by the Nuclear Regulation Authority (NRA) along with Unit 3, is expected to be restarted in May.<\/p>\n<p>The Kyushu Electric Power Co. foresees a monthly improvement of JPY9 billion (USD87 million at USD1=JPY104) to its income and expenditure situation through the returns to service of Genkai-3 and -4. It will, nevertheless, maintain its current power rates for the time being and focus on improving its weakened financial situation.<\/p>\n<p>There are eight municipalities in three prefectures \u2013 Saga, Fukuoka and Nagasaki \u2013 within a 30 kilometer radius of the NPP site, an area for which issuance of emergency evacuation plans is required. Four of the eight have expressed their objections to the restarts, and residents had sought a temporary injunction against operation of both units. On March 20, the Saga District Court turned down the request again, as it had in June 2017.<\/p>\n<p>In addition to Genkai-3, the Sendai-1 and -2 NPPs, owned and operated by the Kyushu Electric Power, in Satsumasendai City, Kagoshima Prefecture, the Ikata-3 NPP, owned and operated by the Shikoku Electric Power Co., in Ikata Town, Ehime Prefecture, and the Takahama-3 and -4 NPPs, owned and operated by Kansai EP, in Takahama Town, Fukui Prefecture, have all been restarted.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Genkai-3 resumes operation after 7 years and three months. It is expected to achieve criticality tonight and connect to the grid on March 25. Mixed uranium-plutonium oxide (MOX) fuel is included in the fuel for the unit. The Genkai-4 NPP, which cleared its compatibility examination by the Nuclear Regulation Authority (NRA) along with Unit [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":2471,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1,6,8],"tags":[450,451,67,37,19,18],"class_list":["post-3097","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-npps","category-policies","tag-genkai-3","tag-genkai-4","tag-jaif","tag-kyushu","tag-nra","tag-restart"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.4 - aioseo.com -->\n\t<meta name=\"description\" content=\"The Genkai-3 resumes operation after 7 years and three months. It is expected to achieve criticality tonight and connect to the grid on March 25. Mixed uranium-plutonium oxide (MOX) fuel is included in the fuel for the unit. The Genkai-4 NPP, which cleared its compatibility examination by the Nuclear Regulation Authority (NRA) along with Unit\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Kaoru Ohno\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.jaif.or.jp\/en\/news\/3097\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.4\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Seventh NPP Restarted: Genkai-3 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:description\" content=\"The Genkai-3 resumes operation after 7 years and three months. It is expected to achieve criticality tonight and connect to the grid on March 25. Mixed uranium-plutonium oxide (MOX) fuel is included in the fuel for the unit. The Genkai-4 NPP, which cleared its compatibility examination by the Nuclear Regulation Authority (NRA) along with Unit\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.jaif.or.jp\/en\/news\/3097\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2017\/01\/Genkai-2-e1484895208128.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2017\/01\/Genkai-2-e1484895208128.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"310\" \/>\n\t\t<meta property=\"og:image:height\" content=\"233\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2018-03-23T06:15:37+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2018-05-07T07:28:28+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@Atoms_in_Japan\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Seventh NPP Restarted: Genkai-3 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta name=\"twitter:description\" content=\"The Genkai-3 resumes operation after 7 years and three months. It is expected to achieve criticality tonight and connect to the grid on March 25. Mixed uranium-plutonium oxide (MOX) fuel is included in the fuel for the unit. The Genkai-4 NPP, which cleared its compatibility examination by the Nuclear Regulation Authority (NRA) along with Unit\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2017\/01\/Genkai-2-e1484895208128.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/3097#blogposting\",\"name\":\"Seventh NPP Restarted: Genkai-3 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"headline\":\"Seventh NPP Restarted: Genkai-3\",\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/wp-content\\\/uploads\\\/2017\\\/01\\\/Genkai-2-e1484895208128.jpg\",\"width\":310,\"height\":233,\"caption\":\"Genkai NPPs\"},\"datePublished\":\"2018-03-23T06:15:37+09:00\",\"dateModified\":\"2018-05-07T08:28:28+09:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/3097#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/3097#webpage\"},\"articleSection\":\"News, NPPs, Policies, Genkai-3, Genkai-4, JAIF, Kyushu, NRA, restart\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/3097#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"position\":2,\"name\":\"News\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"position\":3,\"name\":\"NPPs\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/3097#listItem\",\"name\":\"Seventh NPP Restarted: Genkai-3\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/3097#listItem\",\"position\":4,\"name\":\"Seventh NPP Restarted: Genkai-3\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno\",\"name\":\"Kaoru Ohno\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/3097#webpage\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/3097\",\"name\":\"Seventh NPP Restarted: Genkai-3 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"description\":\"The Genkai-3 resumes operation after 7 years and three months. It is expected to achieve criticality tonight and connect to the grid on March 25. Mixed uranium-plutonium oxide (MOX) fuel is included in the fuel for the unit. The Genkai-4 NPP, which cleared its compatibility examination by the Nuclear Regulation Authority (NRA) along with Unit\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/3097#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/wp-content\\\/uploads\\\/2017\\\/01\\\/Genkai-2-e1484895208128.jpg\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/3097\\\/#mainImage\",\"width\":310,\"height\":233,\"caption\":\"Genkai NPPs\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/3097#mainImage\"},\"datePublished\":\"2018-03-23T06:15:37+09:00\",\"dateModified\":\"2018-05-07T08:28:28+09:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Seventh NPP Restarted: Genkai-3 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"The Genkai-3 resumes operation after 7 years and three months. It is expected to achieve criticality tonight and connect to the grid on March 25. Mixed uranium-plutonium oxide (MOX) fuel is included in the fuel for the unit. The Genkai-4 NPP, which cleared its compatibility examination by the Nuclear Regulation Authority (NRA) along with Unit","canonical_url":"https:\/\/www.jaif.or.jp\/en\/news\/3097","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.jaif.or.jp\/en\/news\/3097#blogposting","name":"Seventh NPP Restarted: Genkai-3 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","headline":"Seventh NPP Restarted: Genkai-3","author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2017\/01\/Genkai-2-e1484895208128.jpg","width":310,"height":233,"caption":"Genkai NPPs"},"datePublished":"2018-03-23T06:15:37+09:00","dateModified":"2018-05-07T08:28:28+09:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/3097#webpage"},"isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/3097#webpage"},"articleSection":"News, NPPs, Policies, Genkai-3, Genkai-4, JAIF, Kyushu, NRA, restart"},{"@type":"BreadcrumbList","@id":"https:\/\/www.jaif.or.jp\/en\/news\/3097#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.jaif.or.jp\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","position":2,"name":"News","item":"https:\/\/www.jaif.or.jp\/en\/news","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","position":3,"name":"NPPs","item":"https:\/\/www.jaif.or.jp\/en\/news\/npps","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/3097#listItem","name":"Seventh NPP Restarted: Genkai-3"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/3097#listItem","position":4,"name":"Seventh NPP Restarted: Genkai-3","previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"}}]},{"@type":"Organization","@id":"https:\/\/www.jaif.or.jp\/en\/#organization","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","url":"https:\/\/www.jaif.or.jp\/en\/"},{"@type":"Person","@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author","url":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno","name":"Kaoru Ohno"},{"@type":"WebPage","@id":"https:\/\/www.jaif.or.jp\/en\/news\/3097#webpage","url":"https:\/\/www.jaif.or.jp\/en\/news\/3097","name":"Seventh NPP Restarted: Genkai-3 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"The Genkai-3 resumes operation after 7 years and three months. It is expected to achieve criticality tonight and connect to the grid on March 25. Mixed uranium-plutonium oxide (MOX) fuel is included in the fuel for the unit. The Genkai-4 NPP, which cleared its compatibility examination by the Nuclear Regulation Authority (NRA) along with Unit","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/3097#breadcrumblist"},"author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"creator":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2017\/01\/Genkai-2-e1484895208128.jpg","@id":"https:\/\/www.jaif.or.jp\/en\/news\/3097\/#mainImage","width":310,"height":233,"caption":"Genkai NPPs"},"primaryImageOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/3097#mainImage"},"datePublished":"2018-03-23T06:15:37+09:00","dateModified":"2018-05-07T08:28:28+09:00"},{"@type":"WebSite","@id":"https:\/\/www.jaif.or.jp\/en\/#website","url":"https:\/\/www.jaif.or.jp\/en\/","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:type":"article","og:title":"Seventh NPP Restarted: Genkai-3 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:description":"The Genkai-3 resumes operation after 7 years and three months. It is expected to achieve criticality tonight and connect to the grid on March 25. Mixed uranium-plutonium oxide (MOX) fuel is included in the fuel for the unit. The Genkai-4 NPP, which cleared its compatibility examination by the Nuclear Regulation Authority (NRA) along with Unit","og:url":"https:\/\/www.jaif.or.jp\/en\/news\/3097","og:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2017\/01\/Genkai-2-e1484895208128.jpg","og:image:secure_url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2017\/01\/Genkai-2-e1484895208128.jpg","og:image:width":310,"og:image:height":233,"article:published_time":"2018-03-23T06:15:37+00:00","article:modified_time":"2018-05-07T07:28:28+00:00","twitter:card":"summary_large_image","twitter:site":"@Atoms_in_Japan","twitter:title":"Seventh NPP Restarted: Genkai-3 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","twitter:description":"The Genkai-3 resumes operation after 7 years and three months. It is expected to achieve criticality tonight and connect to the grid on March 25. Mixed uranium-plutonium oxide (MOX) fuel is included in the fuel for the unit. The Genkai-4 NPP, which cleared its compatibility examination by the Nuclear Regulation Authority (NRA) along with Unit","twitter:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2017\/01\/Genkai-2-e1484895208128.jpg"},"aioseo_meta_data":{"post_id":"3097","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"limit_modified_date":false,"created":"2022-04-29 14:01:16","updated":"2026-10-29 01:05:54","focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\" title=\"News\">News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\/npps\" title=\"NPPs\">NPPs<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tSeventh NPP Restarted: Genkai-3\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.jaif.or.jp\/en\/"},{"label":"News","link":"https:\/\/www.jaif.or.jp\/en\/news"},{"label":"NPPs","link":"https:\/\/www.jaif.or.jp\/en\/news\/npps"},{"label":"Seventh NPP Restarted: Genkai-3","link":"https:\/\/www.jaif.or.jp\/en\/news\/3097"}],"_links":{"self":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/3097","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/comments?post=3097"}],"version-history":[{"count":1,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/3097\/revisions"}],"predecessor-version":[{"id":3098,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/3097\/revisions\/3098"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media\/2471"}],"wp:attachment":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media?parent=3097"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/categories?post=3097"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/tags?post=3097"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}