{"id":333,"date":"2015-02-02T05:04:31","date_gmt":"2015-02-02T05:04:31","guid":{"rendered":"http:\/\/www.jaif.or.jp\/en\/?p=333"},"modified":"2015-03-11T06:21:42","modified_gmt":"2015-03-11T06:21:42","slug":"chubu-electric-power-applies-to-build-interim-storage-facility-at-hamaoka","status":"publish","type":"post","link":"https:\/\/www.jaif.or.jp\/en\/news\/333","title":{"rendered":"Chubu Electric Power Applies to Build Interim Storage Facility at Hamaoka"},"content":{"rendered":"<p>On January 26, Chubu Electric Power Co. filed an application with the Nuclear Regulation Authority (NRA) for a permit to change its reactor installation in way that would enable it to construct a spent fuel dry storage facility at its Hamaoka Nuclear Power Station.<\/p>\n<p>Aiming to start operation of the facility in FY18 (April 2018 to March 2019), the power company intends to respond affirmatively to the NRA\u2019s examination once it is made<\/p>\n<p>At the dry storage facility, Chubu Electric Power will put spent fuel \u2014 already cooled in a pool for a decade or longer \u2014 into radiation-shielded metal casks, storing it in an environment with circulated cooled natural air until the fuel can be delivered to a reprocessing facility.  According to its plan, the facility will be capable of storing 2,200 spent fuel assemblies.<\/p>\n<p>The power company had been preparing to file the application for the construction of the dry storage facility since 2008, when it first announced the plan.  When it submitted a separate application to the NRA in February 2014 for an examination of its Hamaoka Unit 4 reactor for compatibility with the new regulatory standards, it also addressed the matter of the interim storage facility.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>On January 26, Chubu Electric Power Co. filed an application with the Nuclear Regulation Authority (NRA) for a permit to change its reactor installation in way that would enable it to construct a spent fuel dry storage facility at its Hamaoka Nuclear Power Station. Aiming to start operation of the facility in FY18 (April 2018 [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1,6],"tags":[155,156,41],"class_list":["post-333","post","type-post","status-publish","format-standard","hentry","category-news","category-npps","tag-chubu","tag-hamaoka","tag-interim-storage"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.4 - aioseo.com -->\n\t<meta name=\"description\" content=\"On January 26, Chubu Electric Power Co. filed an application with the Nuclear Regulation Authority (NRA) for a permit to change its reactor installation in way that would enable it to construct a spent fuel dry storage facility at its Hamaoka Nuclear Power Station. Aiming to start operation of the facility in FY18 (April 2018\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Kaoru Ohno\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.jaif.or.jp\/en\/news\/333\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.4\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Chubu Electric Power Applies to Build Interim Storage Facility at Hamaoka - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:description\" content=\"On January 26, Chubu Electric Power Co. filed an application with the Nuclear Regulation Authority (NRA) for a permit to change its reactor installation in way that would enable it to construct a spent fuel dry storage facility at its Hamaoka Nuclear Power Station. Aiming to start operation of the facility in FY18 (April 2018\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.jaif.or.jp\/en\/news\/333\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2022\/04\/dummy-scaled.webp\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2022\/04\/dummy-scaled.webp\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2015-02-02T05:04:31+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2015-03-11T06:21:42+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@Atoms_in_Japan\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Chubu Electric Power Applies to Build Interim Storage Facility at Hamaoka - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta name=\"twitter:description\" content=\"On January 26, Chubu Electric Power Co. filed an application with the Nuclear Regulation Authority (NRA) for a permit to change its reactor installation in way that would enable it to construct a spent fuel dry storage facility at its Hamaoka Nuclear Power Station. Aiming to start operation of the facility in FY18 (April 2018\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2022\/04\/dummy-scaled.webp\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/333#blogposting\",\"name\":\"Chubu Electric Power Applies to Build Interim Storage Facility at Hamaoka - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"headline\":\"Chubu Electric Power Applies to Build Interim Storage Facility at Hamaoka\",\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"},\"datePublished\":\"2015-02-02T05:04:31+09:00\",\"dateModified\":\"2015-03-11T06:21:42+09:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/333#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/333#webpage\"},\"articleSection\":\"News, NPPs, Chubu, Hamaoka, interim storage\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/333#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"position\":2,\"name\":\"News\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"position\":3,\"name\":\"NPPs\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/333#listItem\",\"name\":\"Chubu Electric Power Applies to Build Interim Storage Facility at Hamaoka\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/333#listItem\",\"position\":4,\"name\":\"Chubu Electric Power Applies to Build Interim Storage Facility at Hamaoka\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno\",\"name\":\"Kaoru Ohno\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/333#webpage\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/333\",\"name\":\"Chubu Electric Power Applies to Build Interim Storage Facility at Hamaoka - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"description\":\"On January 26, Chubu Electric Power Co. filed an application with the Nuclear Regulation Authority (NRA) for a permit to change its reactor installation in way that would enable it to construct a spent fuel dry storage facility at its Hamaoka Nuclear Power Station. Aiming to start operation of the facility in FY18 (April 2018\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/333#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"datePublished\":\"2015-02-02T05:04:31+09:00\",\"dateModified\":\"2015-03-11T06:21:42+09:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Chubu Electric Power Applies to Build Interim Storage Facility at Hamaoka - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"On January 26, Chubu Electric Power Co. filed an application with the Nuclear Regulation Authority (NRA) for a permit to change its reactor installation in way that would enable it to construct a spent fuel dry storage facility at its Hamaoka Nuclear Power Station. Aiming to start operation of the facility in FY18 (April 2018","canonical_url":"https:\/\/www.jaif.or.jp\/en\/news\/333","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.jaif.or.jp\/en\/news\/333#blogposting","name":"Chubu Electric Power Applies to Build Interim Storage Facility at Hamaoka - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","headline":"Chubu Electric Power Applies to Build Interim Storage Facility at Hamaoka","author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"},"datePublished":"2015-02-02T05:04:31+09:00","dateModified":"2015-03-11T06:21:42+09:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/333#webpage"},"isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/333#webpage"},"articleSection":"News, NPPs, Chubu, Hamaoka, interim storage"},{"@type":"BreadcrumbList","@id":"https:\/\/www.jaif.or.jp\/en\/news\/333#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.jaif.or.jp\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","position":2,"name":"News","item":"https:\/\/www.jaif.or.jp\/en\/news","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","position":3,"name":"NPPs","item":"https:\/\/www.jaif.or.jp\/en\/news\/npps","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/333#listItem","name":"Chubu Electric Power Applies to Build Interim Storage Facility at Hamaoka"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/333#listItem","position":4,"name":"Chubu Electric Power Applies to Build Interim Storage Facility at Hamaoka","previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"}}]},{"@type":"Organization","@id":"https:\/\/www.jaif.or.jp\/en\/#organization","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","url":"https:\/\/www.jaif.or.jp\/en\/"},{"@type":"Person","@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author","url":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno","name":"Kaoru Ohno"},{"@type":"WebPage","@id":"https:\/\/www.jaif.or.jp\/en\/news\/333#webpage","url":"https:\/\/www.jaif.or.jp\/en\/news\/333","name":"Chubu Electric Power Applies to Build Interim Storage Facility at Hamaoka - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"On January 26, Chubu Electric Power Co. filed an application with the Nuclear Regulation Authority (NRA) for a permit to change its reactor installation in way that would enable it to construct a spent fuel dry storage facility at its Hamaoka Nuclear Power Station. Aiming to start operation of the facility in FY18 (April 2018","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/333#breadcrumblist"},"author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"creator":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"datePublished":"2015-02-02T05:04:31+09:00","dateModified":"2015-03-11T06:21:42+09:00"},{"@type":"WebSite","@id":"https:\/\/www.jaif.or.jp\/en\/#website","url":"https:\/\/www.jaif.or.jp\/en\/","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:type":"article","og:title":"Chubu Electric Power Applies to Build Interim Storage Facility at Hamaoka - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:description":"On January 26, Chubu Electric Power Co. filed an application with the Nuclear Regulation Authority (NRA) for a permit to change its reactor installation in way that would enable it to construct a spent fuel dry storage facility at its Hamaoka Nuclear Power Station. Aiming to start operation of the facility in FY18 (April 2018","og:url":"https:\/\/www.jaif.or.jp\/en\/news\/333","og:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2022\/04\/dummy-scaled.webp","og:image:secure_url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2022\/04\/dummy-scaled.webp","article:published_time":"2015-02-02T05:04:31+00:00","article:modified_time":"2015-03-11T06:21:42+00:00","twitter:card":"summary_large_image","twitter:site":"@Atoms_in_Japan","twitter:title":"Chubu Electric Power Applies to Build Interim Storage Facility at Hamaoka - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","twitter:description":"On January 26, Chubu Electric Power Co. filed an application with the Nuclear Regulation Authority (NRA) for a permit to change its reactor installation in way that would enable it to construct a spent fuel dry storage facility at its Hamaoka Nuclear Power Station. Aiming to start operation of the facility in FY18 (April 2018","twitter:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2022\/04\/dummy-scaled.webp"},"aioseo_meta_data":{"post_id":"333","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"limit_modified_date":false,"created":"2022-04-29 13:11:10","updated":"2026-10-28 23:47:02","focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\" title=\"News\">News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\/npps\" title=\"NPPs\">NPPs<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tChubu Electric Power Applies to Build Interim Storage Facility at Hamaoka\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.jaif.or.jp\/en\/"},{"label":"News","link":"https:\/\/www.jaif.or.jp\/en\/news"},{"label":"NPPs","link":"https:\/\/www.jaif.or.jp\/en\/news\/npps"},{"label":"Chubu Electric Power Applies to Build Interim Storage Facility at Hamaoka","link":"https:\/\/www.jaif.or.jp\/en\/news\/333"}],"_links":{"self":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/333","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/comments?post=333"}],"version-history":[{"count":1,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/333\/revisions"}],"predecessor-version":[{"id":334,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/333\/revisions\/334"}],"wp:attachment":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media?parent=333"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/categories?post=333"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/tags?post=333"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}