{"id":333,"date":"2015-02-02T05:04:31","date_gmt":"2015-02-02T05:04:31","guid":{"rendered":"http:\/\/www.jaif.or.jp\/en\/?p=333"},"modified":"2015-03-11T06:21:42","modified_gmt":"2015-03-11T06:21:42","slug":"chubu-electric-power-applies-to-build-interim-storage-facility-at-hamaoka","status":"publish","type":"post","link":"https:\/\/www.jaif.or.jp\/en\/news\/333","title":{"rendered":"Chubu Electric Power Applies to Build Interim Storage Facility at Hamaoka"},"content":{"rendered":"<p>On January 26, Chubu Electric Power Co. filed an application with the Nuclear Regulation Authority (NRA) for a permit to change its reactor installation in way that would enable it to construct a spent fuel dry storage facility at its Hamaoka Nuclear Power Station.<\/p>\n<p>Aiming to start operation of the facility in FY18 (April 2018 to March 2019), the power company intends to respond affirmatively to the NRA\u2019s examination once it is made<\/p>\n<p>At the dry storage facility, Chubu Electric Power will put spent fuel \u2014 already cooled in a pool for a decade or longer \u2014 into radiation-shielded metal casks, storing it in an environment with circulated cooled natural air until the fuel can be delivered to a reprocessing facility.  According to its plan, the facility will be capable of storing 2,200 spent fuel assemblies.<\/p>\n<p>The power company had been preparing to file the application for the construction of the dry storage facility since 2008, when it first announced the plan.  When it submitted a separate application to the NRA in February 2014 for an examination of its Hamaoka Unit 4 reactor for compatibility with the new regulatory standards, it also addressed the matter of the interim storage facility.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>On January 26, Chubu Electric Power Co. filed an application with the Nuclear Regulation Authority (NRA) for a permit to change its reactor installation in way that would enable it to construct a spent fuel dry storage facility at its Hamaoka Nuclear Power Station. Aiming to start operation of the facility in FY18 (April 2018 [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1,6],"tags":[155,156,41],"class_list":["post-333","post","type-post","status-publish","format-standard","hentry","category-news","category-npps","tag-chubu","tag-hamaoka","tag-interim-storage"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/333","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/comments?post=333"}],"version-history":[{"count":1,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/333\/revisions"}],"predecessor-version":[{"id":334,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/333\/revisions\/334"}],"wp:attachment":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media?parent=333"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/categories?post=333"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/tags?post=333"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}