{"id":344,"date":"2015-01-23T05:20:12","date_gmt":"2015-01-23T05:20:12","guid":{"rendered":"http:\/\/www.jaif.or.jp\/en\/?p=344"},"modified":"2015-03-25T08:50:39","modified_gmt":"2015-03-25T08:50:39","slug":"tohoku-electric-power-files-objection-regarding-nature-of-fault-zones-of-crushed-rock-under-higashidori-nps","status":"publish","type":"post","link":"https:\/\/www.jaif.or.jp\/en\/news\/344","title":{"rendered":"Tohoku Electric Power Files Objection Regarding Nature of Fault Zones of Crushed Rock under Higashidori NPS"},"content":{"rendered":"<p>On January 15, the Tohoku Electric Power Co. submitted a written opinion to Nuclear Regulation Authority (NRA) objecting to a draft evaluation report issued on December 22 by an NRA expert panel concerning a fault zone of crushed rock at the Higashidori Nuclear Power Station (NPS), owned and operated by the power company.  The written opinion made individual objections to the points contained in the NRA report.<\/p>\n<p>In its report, the NRA panel had said that fault zone f-2, located immediately below the reactor building, was not one that could possibly to be active in the future.  However, it took a different position on the f-1 fault zone, located immediately below important seismic-safety related equipment, and on D-3 and F-9, major faults on the NPS premises.<\/p>\n<p>Pointing that out, Tohoku Electric Power asked the NRA for a full evaluation that would take its submitted opinion into consideration.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>On January 15, the Tohoku Electric Power Co. submitted a written opinion to Nuclear Regulation Authority (NRA) objecting to a draft evaluation report issued on December 22 by an NRA expert panel concerning a fault zone of crushed rock at the Higashidori Nuclear Power Station (NPS), owned and operated by the power company. The written [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1,6,7],"tags":[88,87,268,19,174,157,167],"class_list":["post-344","post","type-post","status-publish","format-standard","hentry","category-news","category-npps","category-regulation-safety","tag-fault","tag-higashidori","tag-higashidori-1","tag-nra","tag-objection","tag-tohoku","tag-unscientific"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.5.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"On January 15, the Tohoku Electric Power Co. submitted a written opinion to Nuclear Regulation Authority (NRA) objecting to a draft evaluation report issued on December 22 by an NRA expert panel concerning a fault zone of crushed rock at the Higashidori Nuclear Power Station (NPS), owned and operated by the power company. The written\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Kaoru Ohno\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.jaif.or.jp\/en\/news\/344\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.5.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Tohoku Electric Power Files Objection Regarding Nature of Fault Zones of Crushed Rock under Higashidori NPS - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:description\" content=\"On January 15, the Tohoku Electric Power Co. submitted a written opinion to Nuclear Regulation Authority (NRA) objecting to a draft evaluation report issued on December 22 by an NRA expert panel concerning a fault zone of crushed rock at the Higashidori Nuclear Power Station (NPS), owned and operated by the power company. The written\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.jaif.or.jp\/en\/news\/344\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2022\/04\/dummy-scaled.webp\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2022\/04\/dummy-scaled.webp\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2015-01-23T05:20:12+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2015-03-25T08:50:39+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@Atoms_in_Japan\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Tohoku Electric Power Files Objection Regarding Nature of Fault Zones of Crushed Rock under Higashidori NPS - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta name=\"twitter:description\" content=\"On January 15, the Tohoku Electric Power Co. submitted a written opinion to Nuclear Regulation Authority (NRA) objecting to a draft evaluation report issued on December 22 by an NRA expert panel concerning a fault zone of crushed rock at the Higashidori Nuclear Power Station (NPS), owned and operated by the power company. The written\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2022\/04\/dummy-scaled.webp\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/344#blogposting\",\"name\":\"Tohoku Electric Power Files Objection Regarding Nature of Fault Zones of Crushed Rock under Higashidori NPS - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"headline\":\"Tohoku Electric Power Files Objection Regarding Nature of Fault Zones of Crushed Rock under Higashidori NPS\",\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"},\"datePublished\":\"2015-01-23T05:20:12+09:00\",\"dateModified\":\"2015-03-25T08:50:39+09:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/344#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/344#webpage\"},\"articleSection\":\"News, NPPs, Regulation &amp; Safety, fault, Higashidori, Higashidori-1, NRA, objection, Tohoku, unscientific\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/344#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"position\":2,\"name\":\"News\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"position\":3,\"name\":\"NPPs\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/344#listItem\",\"name\":\"Tohoku Electric Power Files Objection Regarding Nature of Fault Zones of Crushed Rock under Higashidori NPS\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/344#listItem\",\"position\":4,\"name\":\"Tohoku Electric Power Files Objection Regarding Nature of Fault Zones of Crushed Rock under Higashidori NPS\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno\",\"name\":\"Kaoru Ohno\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/344#webpage\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/344\",\"name\":\"Tohoku Electric Power Files Objection Regarding Nature of Fault Zones of Crushed Rock under Higashidori NPS - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"description\":\"On January 15, the Tohoku Electric Power Co. submitted a written opinion to Nuclear Regulation Authority (NRA) objecting to a draft evaluation report issued on December 22 by an NRA expert panel concerning a fault zone of crushed rock at the Higashidori Nuclear Power Station (NPS), owned and operated by the power company. The written\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/344#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"datePublished\":\"2015-01-23T05:20:12+09:00\",\"dateModified\":\"2015-03-25T08:50:39+09:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Tohoku Electric Power Files Objection Regarding Nature of Fault Zones of Crushed Rock under Higashidori NPS - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"On January 15, the Tohoku Electric Power Co. submitted a written opinion to Nuclear Regulation Authority (NRA) objecting to a draft evaluation report issued on December 22 by an NRA expert panel concerning a fault zone of crushed rock at the Higashidori Nuclear Power Station (NPS), owned and operated by the power company. The written","canonical_url":"https:\/\/www.jaif.or.jp\/en\/news\/344","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.jaif.or.jp\/en\/news\/344#blogposting","name":"Tohoku Electric Power Files Objection Regarding Nature of Fault Zones of Crushed Rock under Higashidori NPS - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","headline":"Tohoku Electric Power Files Objection Regarding Nature of Fault Zones of Crushed Rock under Higashidori NPS","author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"},"datePublished":"2015-01-23T05:20:12+09:00","dateModified":"2015-03-25T08:50:39+09:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/344#webpage"},"isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/344#webpage"},"articleSection":"News, NPPs, Regulation &amp; Safety, fault, Higashidori, Higashidori-1, NRA, objection, Tohoku, unscientific"},{"@type":"BreadcrumbList","@id":"https:\/\/www.jaif.or.jp\/en\/news\/344#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.jaif.or.jp\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","position":2,"name":"News","item":"https:\/\/www.jaif.or.jp\/en\/news","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","position":3,"name":"NPPs","item":"https:\/\/www.jaif.or.jp\/en\/news\/npps","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/344#listItem","name":"Tohoku Electric Power Files Objection Regarding Nature of Fault Zones of Crushed Rock under Higashidori NPS"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/344#listItem","position":4,"name":"Tohoku Electric Power Files Objection Regarding Nature of Fault Zones of Crushed Rock under Higashidori NPS","previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"}}]},{"@type":"Organization","@id":"https:\/\/www.jaif.or.jp\/en\/#organization","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","url":"https:\/\/www.jaif.or.jp\/en\/"},{"@type":"Person","@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author","url":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno","name":"Kaoru Ohno"},{"@type":"WebPage","@id":"https:\/\/www.jaif.or.jp\/en\/news\/344#webpage","url":"https:\/\/www.jaif.or.jp\/en\/news\/344","name":"Tohoku Electric Power Files Objection Regarding Nature of Fault Zones of Crushed Rock under Higashidori NPS - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"On January 15, the Tohoku Electric Power Co. submitted a written opinion to Nuclear Regulation Authority (NRA) objecting to a draft evaluation report issued on December 22 by an NRA expert panel concerning a fault zone of crushed rock at the Higashidori Nuclear Power Station (NPS), owned and operated by the power company. The written","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/344#breadcrumblist"},"author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"creator":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"datePublished":"2015-01-23T05:20:12+09:00","dateModified":"2015-03-25T08:50:39+09:00"},{"@type":"WebSite","@id":"https:\/\/www.jaif.or.jp\/en\/#website","url":"https:\/\/www.jaif.or.jp\/en\/","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:type":"article","og:title":"Tohoku Electric Power Files Objection Regarding Nature of Fault Zones of Crushed Rock under Higashidori NPS - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:description":"On January 15, the Tohoku Electric Power Co. submitted a written opinion to Nuclear Regulation Authority (NRA) objecting to a draft evaluation report issued on December 22 by an NRA expert panel concerning a fault zone of crushed rock at the Higashidori Nuclear Power Station (NPS), owned and operated by the power company. The written","og:url":"https:\/\/www.jaif.or.jp\/en\/news\/344","og:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2022\/04\/dummy-scaled.webp","og:image:secure_url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2022\/04\/dummy-scaled.webp","article:published_time":"2015-01-23T05:20:12+00:00","article:modified_time":"2015-03-25T08:50:39+00:00","twitter:card":"summary_large_image","twitter:site":"@Atoms_in_Japan","twitter:title":"Tohoku Electric Power Files Objection Regarding Nature of Fault Zones of Crushed Rock under Higashidori NPS - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","twitter:description":"On January 15, the Tohoku Electric Power Co. submitted a written opinion to Nuclear Regulation Authority (NRA) objecting to a draft evaluation report issued on December 22 by an NRA expert panel concerning a fault zone of crushed rock at the Higashidori Nuclear Power Station (NPS), owned and operated by the power company. The written","twitter:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2022\/04\/dummy-scaled.webp"},"aioseo_meta_data":{"post_id":"344","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"limit_modified_date":false,"created":"2022-04-29 13:11:10","updated":"2026-10-28 23:45:47","focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\" title=\"News\">News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\/npps\" title=\"NPPs\">NPPs<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tTohoku Electric Power Files Objection Regarding Nature of Fault Zones of Crushed Rock under Higashidori NPS\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.jaif.or.jp\/en\/"},{"label":"News","link":"https:\/\/www.jaif.or.jp\/en\/news"},{"label":"NPPs","link":"https:\/\/www.jaif.or.jp\/en\/news\/npps"},{"label":"Tohoku Electric Power Files Objection Regarding Nature of Fault Zones of Crushed Rock under Higashidori NPS","link":"https:\/\/www.jaif.or.jp\/en\/news\/344"}],"_links":{"self":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/344","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/comments?post=344"}],"version-history":[{"count":1,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/344\/revisions"}],"predecessor-version":[{"id":345,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/344\/revisions\/345"}],"wp:attachment":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media?parent=344"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/categories?post=344"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/tags?post=344"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}