{"id":395,"date":"2014-12-15T04:13:32","date_gmt":"2014-12-15T04:13:32","guid":{"rendered":"http:\/\/www.jaif.or.jp\/en\/?p=395"},"modified":"2015-03-25T08:52:05","modified_gmt":"2015-03-25T08:52:05","slug":"japc-asks-nra-for-revised-look-on-tsuruga-2","status":"publish","type":"post","link":"https:\/\/www.jaif.or.jp\/en\/news\/395","title":{"rendered":"JAPC Asks NRA for Revised Look on Tsuruga-2"},"content":{"rendered":"<p>In an evaluation report draft released on November 19, an expert panel of Japan\u2019s Nuclear Regulation Authority (NRA) deemed the D-1 fracture zone lying directly under Unit 2 of the Tsuruga Nuclear Power Station as a fault that \u201cmight become active in the future.\u201d <\/p>\n<p>On December 9, the plant operator, the Japan Atomic Power Company (JAPC), pointed out what it believed to be 61 problems in the report, saying that there had been mistakes of fact, omissions of key points, and conclusions not based on observed facts and data.  It thus asked the NRA to set up another opportunity for JAPC to explain and discuss its position.<\/p>\n<p>On December 10, the NRA held a peer review session on the evaluation report draft, hearing views and opinions from experts involved in the evaluations of other fracture zones.<\/p>\n<p>The background information has been presented in the Atoms in Japan article, \u201cThin Reasoning in NRA\u2019s Argument for Active Fault under Tsuruga-2,\u201d released on November 25, 2014.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In an evaluation report draft released on November 19, an expert panel of Japan\u2019s Nuclear Regulation Authority (NRA) deemed the D-1 fracture zone lying directly under Unit 2 of the Tsuruga Nuclear Power Station as a fault that \u201cmight become active in the future.\u201d On December 9, the plant operator, the Japan Atomic Power Company [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1,6,7],"tags":[88,165,19,166,269,167],"class_list":["post-395","post","type-post","status-publish","format-standard","hentry","category-news","category-npps","category-regulation-safety","tag-fault","tag-japc","tag-nra","tag-tsuruga","tag-tsuruga-2","tag-unscientific"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.5.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"In an evaluation report draft released on November 19, an expert panel of Japan\u2019s Nuclear Regulation Authority (NRA) deemed the D-1 fracture zone lying directly under Unit 2 of the Tsuruga Nuclear Power Station as a fault that \u201cmight become active in the future.\u201d On December 9, the plant operator, the Japan Atomic Power Company\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Kaoru Ohno\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.jaif.or.jp\/en\/news\/395\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.5.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"JAPC Asks NRA for Revised Look on Tsuruga-2 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:description\" content=\"In an evaluation report draft released on November 19, an expert panel of Japan\u2019s Nuclear Regulation Authority (NRA) deemed the D-1 fracture zone lying directly under Unit 2 of the Tsuruga Nuclear Power Station as a fault that \u201cmight become active in the future.\u201d On December 9, the plant operator, the Japan Atomic Power Company\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.jaif.or.jp\/en\/news\/395\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2022\/04\/dummy-scaled.webp\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2022\/04\/dummy-scaled.webp\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2014-12-15T04:13:32+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2015-03-25T08:52:05+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@Atoms_in_Japan\" \/>\n\t\t<meta name=\"twitter:title\" content=\"JAPC Asks NRA for Revised Look on Tsuruga-2 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta name=\"twitter:description\" content=\"In an evaluation report draft released on November 19, an expert panel of Japan\u2019s Nuclear Regulation Authority (NRA) deemed the D-1 fracture zone lying directly under Unit 2 of the Tsuruga Nuclear Power Station as a fault that \u201cmight become active in the future.\u201d On December 9, the plant operator, the Japan Atomic Power Company\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2022\/04\/dummy-scaled.webp\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/395#blogposting\",\"name\":\"JAPC Asks NRA for Revised Look on Tsuruga-2 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"headline\":\"JAPC Asks NRA for Revised Look on Tsuruga-2\",\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"},\"datePublished\":\"2014-12-15T04:13:32+09:00\",\"dateModified\":\"2015-03-25T08:52:05+09:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/395#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/395#webpage\"},\"articleSection\":\"News, NPPs, Regulation &amp; Safety, fault, JAPC, NRA, Tsuruga, Tsuruga-2, unscientific\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/395#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"position\":2,\"name\":\"News\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"position\":3,\"name\":\"NPPs\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/395#listItem\",\"name\":\"JAPC Asks NRA for Revised Look on Tsuruga-2\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/395#listItem\",\"position\":4,\"name\":\"JAPC Asks NRA for Revised Look on Tsuruga-2\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno\",\"name\":\"Kaoru Ohno\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/395#webpage\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/395\",\"name\":\"JAPC Asks NRA for Revised Look on Tsuruga-2 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"description\":\"In an evaluation report draft released on November 19, an expert panel of Japan\\u2019s Nuclear Regulation Authority (NRA) deemed the D-1 fracture zone lying directly under Unit 2 of the Tsuruga Nuclear Power Station as a fault that \\u201cmight become active in the future.\\u201d On December 9, the plant operator, the Japan Atomic Power Company\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/395#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"datePublished\":\"2014-12-15T04:13:32+09:00\",\"dateModified\":\"2015-03-25T08:52:05+09:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"JAPC Asks NRA for Revised Look on Tsuruga-2 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"In an evaluation report draft released on November 19, an expert panel of Japan\u2019s Nuclear Regulation Authority (NRA) deemed the D-1 fracture zone lying directly under Unit 2 of the Tsuruga Nuclear Power Station as a fault that \u201cmight become active in the future.\u201d On December 9, the plant operator, the Japan Atomic Power Company","canonical_url":"https:\/\/www.jaif.or.jp\/en\/news\/395","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.jaif.or.jp\/en\/news\/395#blogposting","name":"JAPC Asks NRA for Revised Look on Tsuruga-2 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","headline":"JAPC Asks NRA for Revised Look on Tsuruga-2","author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"},"datePublished":"2014-12-15T04:13:32+09:00","dateModified":"2015-03-25T08:52:05+09:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/395#webpage"},"isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/395#webpage"},"articleSection":"News, NPPs, Regulation &amp; Safety, fault, JAPC, NRA, Tsuruga, Tsuruga-2, unscientific"},{"@type":"BreadcrumbList","@id":"https:\/\/www.jaif.or.jp\/en\/news\/395#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.jaif.or.jp\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","position":2,"name":"News","item":"https:\/\/www.jaif.or.jp\/en\/news","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","position":3,"name":"NPPs","item":"https:\/\/www.jaif.or.jp\/en\/news\/npps","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/395#listItem","name":"JAPC Asks NRA for Revised Look on Tsuruga-2"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/395#listItem","position":4,"name":"JAPC Asks NRA for Revised Look on Tsuruga-2","previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"}}]},{"@type":"Organization","@id":"https:\/\/www.jaif.or.jp\/en\/#organization","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","url":"https:\/\/www.jaif.or.jp\/en\/"},{"@type":"Person","@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author","url":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno","name":"Kaoru Ohno"},{"@type":"WebPage","@id":"https:\/\/www.jaif.or.jp\/en\/news\/395#webpage","url":"https:\/\/www.jaif.or.jp\/en\/news\/395","name":"JAPC Asks NRA for Revised Look on Tsuruga-2 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"In an evaluation report draft released on November 19, an expert panel of Japan\u2019s Nuclear Regulation Authority (NRA) deemed the D-1 fracture zone lying directly under Unit 2 of the Tsuruga Nuclear Power Station as a fault that \u201cmight become active in the future.\u201d On December 9, the plant operator, the Japan Atomic Power Company","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/395#breadcrumblist"},"author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"creator":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"datePublished":"2014-12-15T04:13:32+09:00","dateModified":"2015-03-25T08:52:05+09:00"},{"@type":"WebSite","@id":"https:\/\/www.jaif.or.jp\/en\/#website","url":"https:\/\/www.jaif.or.jp\/en\/","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:type":"article","og:title":"JAPC Asks NRA for Revised Look on Tsuruga-2 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:description":"In an evaluation report draft released on November 19, an expert panel of Japan\u2019s Nuclear Regulation Authority (NRA) deemed the D-1 fracture zone lying directly under Unit 2 of the Tsuruga Nuclear Power Station as a fault that \u201cmight become active in the future.\u201d On December 9, the plant operator, the Japan Atomic Power Company","og:url":"https:\/\/www.jaif.or.jp\/en\/news\/395","og:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2022\/04\/dummy-scaled.webp","og:image:secure_url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2022\/04\/dummy-scaled.webp","article:published_time":"2014-12-15T04:13:32+00:00","article:modified_time":"2015-03-25T08:52:05+00:00","twitter:card":"summary_large_image","twitter:site":"@Atoms_in_Japan","twitter:title":"JAPC Asks NRA for Revised Look on Tsuruga-2 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","twitter:description":"In an evaluation report draft released on November 19, an expert panel of Japan\u2019s Nuclear Regulation Authority (NRA) deemed the D-1 fracture zone lying directly under Unit 2 of the Tsuruga Nuclear Power Station as a fault that \u201cmight become active in the future.\u201d On December 9, the plant operator, the Japan Atomic Power Company","twitter:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2022\/04\/dummy-scaled.webp"},"aioseo_meta_data":{"post_id":"395","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"limit_modified_date":false,"created":"2022-04-29 13:09:16","updated":"2026-10-28 23:44:07","focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\" title=\"News\">News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\/npps\" title=\"NPPs\">NPPs<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tJAPC Asks NRA for Revised Look on Tsuruga-2\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.jaif.or.jp\/en\/"},{"label":"News","link":"https:\/\/www.jaif.or.jp\/en\/news"},{"label":"NPPs","link":"https:\/\/www.jaif.or.jp\/en\/news\/npps"},{"label":"JAPC Asks NRA for Revised Look on Tsuruga-2","link":"https:\/\/www.jaif.or.jp\/en\/news\/395"}],"_links":{"self":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/395","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/comments?post=395"}],"version-history":[{"count":2,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/395\/revisions"}],"predecessor-version":[{"id":397,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/395\/revisions\/397"}],"wp:attachment":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media?parent=395"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/categories?post=395"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/tags?post=395"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}