{"id":3951,"date":"2019-05-10T10:36:24","date_gmt":"2019-05-10T09:36:24","guid":{"rendered":"https:\/\/www.jaif.or.jp\/en-renew\/?p=3951"},"modified":"2019-07-17T09:13:25","modified_gmt":"2019-07-17T08:13:25","slug":"demonstration-made-by-mhi-and-irid-of-robot-arm","status":"publish","type":"post","link":"https:\/\/www.jaif.or.jp\/en\/news\/3951","title":{"rendered":"Demonstration Made by MHI and IRID of Robot Arm to Remove Fuel Debris from Fukushima Daiichi"},"content":{"rendered":"<p>Previous AIJ article on the issue:<\/p>\n<p><a href=\"https:\/\/www.jaif.or.jp\/en-renew\/draft-of-new-technical-strategy-for-fukushima-daiichi-released-showing-direction-for-fuel-debris-removal\/\">https:\/\/www.jaif.or.jp\/en-renew\/draft-of-new-technical-strategy-for-fukushima-daiichi-released-showing-direction-for-fuel-debris-removal\/<\/a><\/p>\n<p>According to the so-called mid-and-long-term roadmap toward the eventual decommissioning of the Fukushima Daiichi NPPs, the fuel debris is to be removed in an uncovered state from the side of the reactor containment vessel (CV). To that end, MHI and IRID carried out validation tests three months ago, in February, in which they inserted a robot arm, used to process and hold the fuel debris, into the pedestal (at the bottom of the reactor pressure vessel) via an access rail on the side of the CV.<\/p>\n<p>Separate functions tests of the robot arm and access rail were completed prior to FY2016 (April 2016 to March 2017). This time, at a mock-up at MHI\u2019s Kobe Shipyard &amp; Machinery Works, tests were made of the combination of a robot arm and access rail: the so-called \u201crobot-arm and access-rail method.\u201d MHI and IRID simulated movements of the robot arm on the site, as well as the processing and holding of the fuel debris, putting it into containers and transferring it.<\/p>\n<p>\u201cBefore now, individual efforts toward the removal of the fuel debris had proceeded separately. Thanks to the large device, though, the efficiency of those effort should be improved,\u201d explained Senior Manager Naoaki Okuzumi of IRID\u2019s R&amp;D Strategy Planning Department.<\/p>\n<p>Investigations are being carried out of the interiors of each unit\u2019s CVs toward the start of the removal of the fuel debris in 2021. According to an MHI engineer working on the robot arm, \u201cAs the technology is still in its fledgling state, we have to improve and perfect it before introducing it at the site.\u201d<\/p>\n<p>For example, the robot arm, measuring only some 6cm in diameter, was designed to bear a load of two tons at the tip, although the precise nature of the fuel debris has not been clarified. Things yet to be determined include the robot arm\u2019s specifications, the specific functions of the tools to be installed, and its resistance to radiation.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Previous AIJ article on the issue: https:\/\/www.jaif.or.jp\/en-renew\/draft-of-new-technical-strategy-for-fukushima-daiichi-released-showing-direction-for-fuel-debris-removal\/ According to the so-called mid-and-long-term roadmap toward the eventual decommissioning of the Fukushima Daiichi NPPs, the fuel debris is to be removed in an uncovered state from the side of the reactor containment vessel (CV). To that end, MHI and IRID carried out validation tests three months ago, [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":3952,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[10,1],"tags":[326,21,182],"class_list":["post-3951","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-fukushima","category-news","tag-fuel-debris","tag-fukushima-daiichi","tag-robot"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.4 - aioseo.com -->\n\t<meta name=\"description\" content=\"Previous AIJ article on the issue: https:\/\/www.jaif.or.jp\/en-renew\/draft-of-new-technical-strategy-for-fukushima-daiichi-released-showing-direction-for-fuel-debris-removal\/ According to the so-called mid-and-long-term roadmap toward the eventual decommissioning of the Fukushima Daiichi NPPs, the fuel debris is to be removed in an uncovered state from the side of the reactor containment vessel (CV). To that end, MHI and IRID carried out validation tests three months ago,\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Kaoru Ohno\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.jaif.or.jp\/en\/news\/3951\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.4\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Demonstration Made by MHI and IRID of Robot Arm to Remove Fuel Debris from Fukushima Daiichi - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:description\" content=\"Previous AIJ article on the issue: https:\/\/www.jaif.or.jp\/en-renew\/draft-of-new-technical-strategy-for-fukushima-daiichi-released-showing-direction-for-fuel-debris-removal\/ According to the so-called mid-and-long-term roadmap toward the eventual decommissioning of the Fukushima Daiichi NPPs, the fuel debris is to be removed in an uncovered state from the side of the reactor containment vessel (CV). To that end, MHI and IRID carried out validation tests three months ago,\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.jaif.or.jp\/en\/news\/3951\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2019\/05\/ROBBOTRARMEV-e1557480833520.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2019\/05\/ROBBOTRARMEV-e1557480833520.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"350\" \/>\n\t\t<meta property=\"og:image:height\" content=\"400\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2019-05-10T09:36:24+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2019-07-17T08:13:25+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@Atoms_in_Japan\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Demonstration Made by MHI and IRID of Robot Arm to Remove Fuel Debris from Fukushima Daiichi - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Previous AIJ article on the issue: https:\/\/www.jaif.or.jp\/en-renew\/draft-of-new-technical-strategy-for-fukushima-daiichi-released-showing-direction-for-fuel-debris-removal\/ According to the so-called mid-and-long-term roadmap toward the eventual decommissioning of the Fukushima Daiichi NPPs, the fuel debris is to be removed in an uncovered state from the side of the reactor containment vessel (CV). To that end, MHI and IRID carried out validation tests three months ago,\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2019\/05\/ROBBOTRARMEV-e1557480833520.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/3951#blogposting\",\"name\":\"Demonstration Made by MHI and IRID of Robot Arm to Remove Fuel Debris from Fukushima Daiichi - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"headline\":\"Demonstration Made by MHI and IRID of Robot Arm to Remove Fuel Debris from Fukushima Daiichi\",\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/wp-content\\\/uploads\\\/2019\\\/05\\\/ROBBOTRARMEV-e1557480833520.jpg\",\"width\":350,\"height\":400,\"caption\":\"The robot arm, shown at MHI\\u2019s Kobe Shipyard & Machinery Works, measures 7.1m in length.\"},\"datePublished\":\"2019-05-10T10:36:24+09:00\",\"dateModified\":\"2019-07-17T09:13:25+09:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/3951#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/3951#webpage\"},\"articleSection\":\"Fukushima, News, fuel debris, Fukushima Daiichi, robot\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/3951#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"position\":2,\"name\":\"News\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/fukushima#listItem\",\"name\":\"Fukushima\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/fukushima#listItem\",\"position\":3,\"name\":\"Fukushima\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/fukushima\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/3951#listItem\",\"name\":\"Demonstration Made by MHI and IRID of Robot Arm to Remove Fuel Debris from Fukushima Daiichi\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/3951#listItem\",\"position\":4,\"name\":\"Demonstration Made by MHI and IRID of Robot Arm to Remove Fuel Debris from Fukushima Daiichi\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/fukushima#listItem\",\"name\":\"Fukushima\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno\",\"name\":\"Kaoru Ohno\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/3951#webpage\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/3951\",\"name\":\"Demonstration Made by MHI and IRID of Robot Arm to Remove Fuel Debris from Fukushima Daiichi - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"description\":\"Previous AIJ article on the issue: https:\\\/\\\/www.jaif.or.jp\\\/en-renew\\\/draft-of-new-technical-strategy-for-fukushima-daiichi-released-showing-direction-for-fuel-debris-removal\\\/ According to the so-called mid-and-long-term roadmap toward the eventual decommissioning of the Fukushima Daiichi NPPs, the fuel debris is to be removed in an uncovered state from the side of the reactor containment vessel (CV). To that end, MHI and IRID carried out validation tests three months ago,\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/3951#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/wp-content\\\/uploads\\\/2019\\\/05\\\/ROBBOTRARMEV-e1557480833520.jpg\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/3951\\\/#mainImage\",\"width\":350,\"height\":400,\"caption\":\"The robot arm, shown at MHI\\u2019s Kobe Shipyard & Machinery Works, measures 7.1m in length.\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/3951#mainImage\"},\"datePublished\":\"2019-05-10T10:36:24+09:00\",\"dateModified\":\"2019-07-17T09:13:25+09:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Demonstration Made by MHI and IRID of Robot Arm to Remove Fuel Debris from Fukushima Daiichi - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"Previous AIJ article on the issue: https:\/\/www.jaif.or.jp\/en-renew\/draft-of-new-technical-strategy-for-fukushima-daiichi-released-showing-direction-for-fuel-debris-removal\/ According to the so-called mid-and-long-term roadmap toward the eventual decommissioning of the Fukushima Daiichi NPPs, the fuel debris is to be removed in an uncovered state from the side of the reactor containment vessel (CV). To that end, MHI and IRID carried out validation tests three months ago,","canonical_url":"https:\/\/www.jaif.or.jp\/en\/news\/3951","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.jaif.or.jp\/en\/news\/3951#blogposting","name":"Demonstration Made by MHI and IRID of Robot Arm to Remove Fuel Debris from Fukushima Daiichi - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","headline":"Demonstration Made by MHI and IRID of Robot Arm to Remove Fuel Debris from Fukushima Daiichi","author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2019\/05\/ROBBOTRARMEV-e1557480833520.jpg","width":350,"height":400,"caption":"The robot arm, shown at MHI\u2019s Kobe Shipyard & Machinery Works, measures 7.1m in length."},"datePublished":"2019-05-10T10:36:24+09:00","dateModified":"2019-07-17T09:13:25+09:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/3951#webpage"},"isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/3951#webpage"},"articleSection":"Fukushima, News, fuel debris, Fukushima Daiichi, robot"},{"@type":"BreadcrumbList","@id":"https:\/\/www.jaif.or.jp\/en\/news\/3951#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.jaif.or.jp\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","position":2,"name":"News","item":"https:\/\/www.jaif.or.jp\/en\/news","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/fukushima#listItem","name":"Fukushima"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/fukushima#listItem","position":3,"name":"Fukushima","item":"https:\/\/www.jaif.or.jp\/en\/news\/fukushima","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/3951#listItem","name":"Demonstration Made by MHI and IRID of Robot Arm to Remove Fuel Debris from Fukushima Daiichi"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/3951#listItem","position":4,"name":"Demonstration Made by MHI and IRID of Robot Arm to Remove Fuel Debris from Fukushima Daiichi","previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/fukushima#listItem","name":"Fukushima"}}]},{"@type":"Organization","@id":"https:\/\/www.jaif.or.jp\/en\/#organization","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","url":"https:\/\/www.jaif.or.jp\/en\/"},{"@type":"Person","@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author","url":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno","name":"Kaoru Ohno"},{"@type":"WebPage","@id":"https:\/\/www.jaif.or.jp\/en\/news\/3951#webpage","url":"https:\/\/www.jaif.or.jp\/en\/news\/3951","name":"Demonstration Made by MHI and IRID of Robot Arm to Remove Fuel Debris from Fukushima Daiichi - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"Previous AIJ article on the issue: https:\/\/www.jaif.or.jp\/en-renew\/draft-of-new-technical-strategy-for-fukushima-daiichi-released-showing-direction-for-fuel-debris-removal\/ According to the so-called mid-and-long-term roadmap toward the eventual decommissioning of the Fukushima Daiichi NPPs, the fuel debris is to be removed in an uncovered state from the side of the reactor containment vessel (CV). To that end, MHI and IRID carried out validation tests three months ago,","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/3951#breadcrumblist"},"author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"creator":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2019\/05\/ROBBOTRARMEV-e1557480833520.jpg","@id":"https:\/\/www.jaif.or.jp\/en\/news\/3951\/#mainImage","width":350,"height":400,"caption":"The robot arm, shown at MHI\u2019s Kobe Shipyard & Machinery Works, measures 7.1m in length."},"primaryImageOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/3951#mainImage"},"datePublished":"2019-05-10T10:36:24+09:00","dateModified":"2019-07-17T09:13:25+09:00"},{"@type":"WebSite","@id":"https:\/\/www.jaif.or.jp\/en\/#website","url":"https:\/\/www.jaif.or.jp\/en\/","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:type":"article","og:title":"Demonstration Made by MHI and IRID of Robot Arm to Remove Fuel Debris from Fukushima Daiichi - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:description":"Previous AIJ article on the issue: https:\/\/www.jaif.or.jp\/en-renew\/draft-of-new-technical-strategy-for-fukushima-daiichi-released-showing-direction-for-fuel-debris-removal\/ According to the so-called mid-and-long-term roadmap toward the eventual decommissioning of the Fukushima Daiichi NPPs, the fuel debris is to be removed in an uncovered state from the side of the reactor containment vessel (CV). To that end, MHI and IRID carried out validation tests three months ago,","og:url":"https:\/\/www.jaif.or.jp\/en\/news\/3951","og:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2019\/05\/ROBBOTRARMEV-e1557480833520.jpg","og:image:secure_url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2019\/05\/ROBBOTRARMEV-e1557480833520.jpg","og:image:width":350,"og:image:height":400,"article:published_time":"2019-05-10T09:36:24+00:00","article:modified_time":"2019-07-17T08:13:25+00:00","twitter:card":"summary_large_image","twitter:site":"@Atoms_in_Japan","twitter:title":"Demonstration Made by MHI and IRID of Robot Arm to Remove Fuel Debris from Fukushima Daiichi - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","twitter:description":"Previous AIJ article on the issue: https:\/\/www.jaif.or.jp\/en-renew\/draft-of-new-technical-strategy-for-fukushima-daiichi-released-showing-direction-for-fuel-debris-removal\/ According to the so-called mid-and-long-term roadmap toward the eventual decommissioning of the Fukushima Daiichi NPPs, the fuel debris is to be removed in an uncovered state from the side of the reactor containment vessel (CV). To that end, MHI and IRID carried out validation tests three months ago,","twitter:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2019\/05\/ROBBOTRARMEV-e1557480833520.jpg"},"aioseo_meta_data":{"post_id":"3951","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"limit_modified_date":false,"created":"2022-04-29 14:12:19","updated":"2026-10-29 01:22:59","focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\" title=\"News\">News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\/fukushima\" title=\"Fukushima\">Fukushima<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tDemonstration Made by MHI and IRID of Robot Arm to Remove Fuel Debris from Fukushima Daiichi\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.jaif.or.jp\/en\/"},{"label":"News","link":"https:\/\/www.jaif.or.jp\/en\/news"},{"label":"Fukushima","link":"https:\/\/www.jaif.or.jp\/en\/news\/fukushima"},{"label":"Demonstration Made by MHI and IRID of Robot Arm to Remove Fuel Debris from Fukushima Daiichi","link":"https:\/\/www.jaif.or.jp\/en\/news\/3951"}],"_links":{"self":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/3951","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/comments?post=3951"}],"version-history":[{"count":1,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/3951\/revisions"}],"predecessor-version":[{"id":3953,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/3951\/revisions\/3953"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media\/3952"}],"wp:attachment":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media?parent=3951"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/categories?post=3951"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/tags?post=3951"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}