{"id":4031,"date":"2019-05-31T11:36:59","date_gmt":"2019-05-31T10:36:59","guid":{"rendered":"https:\/\/www.jaif.or.jp\/en-renew\/?p=4031"},"modified":"2019-07-31T02:53:38","modified_gmt":"2019-07-31T01:53:38","slug":"nra-orders-kansai-ep-to-backfit-takahama-and-other-npps-based-on-new-volcano-impact-information","status":"publish","type":"post","link":"https:\/\/www.jaif.or.jp\/en\/news\/regulation-safety\/4031","title":{"rendered":"NRA Orders Kansai EP to Backfit Takahama and Other NPPs Based on New Volcano Impact Information"},"content":{"rendered":"<p>The Takahama-1 through -4, Ohi-3 and -4 and Mihama-3 NPPs had already all cleared compatibility examinations with the new regulatory standards.<\/p>\n<p>However, the most recent analysis of a potential eruption of Mt. Daisen has predicted some 11 cubic kilometers of deposited ash in the Daisen-Namatake Tephra (the place being investigated in Kyoto City), more than previously thought. Accordingly, the so-called \u201cbackfit\u201d will be undertaken to confirm compatibility with the new knowledge.<\/p>\n<p>Given, however, that Mt. Daisen is not an active volcano\u2014meaning that there is no imminent eruption\u2014the NRA does not consider it necessary for the power company to suspend the operations of the reactors immediately.<\/p>\n<p>Based on the aforementioned analysis of volcanic ash at the Daisen-Namatake Tephra, the NRA had ordered Kansai-EP in December 2018 to submit reports on its NPP sites. The company then calculated ash layers within the precincts of the Takahama, Ohi and Mihama sites, putting the maximum thickness at 21.9cm. Prior approvals of compatibility under the new regulatory standards had been based on a maximum thickness of 10cm.<\/p>\n<p>Thus, the NRA, having found the units to be incompatible, rendered its decision accordingly.<\/p>\n<p>At a post-meeting press conference, NRA Chairman Toyoshi Fuketa explained the decision, saying, \u201cWhen new information on natural phenomena is acquired and a threat is found to be more severe than previously assumed, designs must be changed in accordance with that knowledge.\u201d<\/p>\n<p>He emphasized that the NRA\u2019s approach to backfitting was guided by lessons learned from the accident at the Fukushima Daiichi NPPs in March 2011.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Takahama-1 through -4, Ohi-3 and -4 and Mihama-3 NPPs had already all cleared compatibility examinations with the new regulatory standards. However, the most recent analysis of a potential eruption of Mt. Daisen has predicted some 11 cubic kilometers of deposited ash in the Daisen-Namatake Tephra (the place being investigated in Kyoto City), more than [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":4032,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[7],"tags":[20,44,19,317,17],"class_list":["post-4031","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regulation-safety","tag-kansai","tag-mihama","tag-nra","tag-ohi","tag-takahama"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.5.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"The Takahama-1 through -4, Ohi-3 and -4 and Mihama-3 NPPs had already all cleared compatibility examinations with the new regulatory standards. However, the most recent analysis of a potential eruption of Mt. Daisen has predicted some 11 cubic kilometers of deposited ash in the Daisen-Namatake Tephra (the place being investigated in Kyoto City), more than\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Kaoru Ohno\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.jaif.or.jp\/en\/news\/regulation-safety\/4031\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.5.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"NRA Orders Kansai EP to Backfit Takahama and Other NPPs Based on New Volcano Impact Information - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:description\" content=\"The Takahama-1 through -4, Ohi-3 and -4 and Mihama-3 NPPs had already all cleared compatibility examinations with the new regulatory standards. However, the most recent analysis of a potential eruption of Mt. Daisen has predicted some 11 cubic kilometers of deposited ash in the Daisen-Namatake Tephra (the place being investigated in Kyoto City), more than\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.jaif.or.jp\/en\/news\/regulation-safety\/4031\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2019\/05\/DAISEN-e1559298898455.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2019\/05\/DAISEN-e1559298898455.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"350\" \/>\n\t\t<meta property=\"og:image:height\" content=\"233\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2019-05-31T10:36:59+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2019-07-31T01:53:38+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@Atoms_in_Japan\" \/>\n\t\t<meta name=\"twitter:title\" content=\"NRA Orders Kansai EP to Backfit Takahama and Other NPPs Based on New Volcano Impact Information - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta name=\"twitter:description\" content=\"The Takahama-1 through -4, Ohi-3 and -4 and Mihama-3 NPPs had already all cleared compatibility examinations with the new regulatory standards. However, the most recent analysis of a potential eruption of Mt. Daisen has predicted some 11 cubic kilometers of deposited ash in the Daisen-Namatake Tephra (the place being investigated in Kyoto City), more than\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2019\/05\/DAISEN-e1559298898455.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/regulation-safety\\\/4031#blogposting\",\"name\":\"NRA Orders Kansai EP to Backfit Takahama and Other NPPs Based on New Volcano Impact Information - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"headline\":\"NRA Orders Kansai EP to Backfit Takahama and Other NPPs Based on New Volcano Impact Information\",\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/wp-content\\\/uploads\\\/2019\\\/05\\\/DAISEN-e1559298898455.jpg\",\"width\":350,\"height\":233,\"caption\":\"Commissioner Ishiwatari (second from left) investigates volcanic ash distribution in October 2018 (photo provided by NRA)\"},\"datePublished\":\"2019-05-31T11:36:59+09:00\",\"dateModified\":\"2019-07-31T02:53:38+09:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/regulation-safety\\\/4031#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/regulation-safety\\\/4031#webpage\"},\"articleSection\":\"Regulation &amp; Safety, Kansai, Mihama, NRA, Ohi, Takahama\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/regulation-safety\\\/4031#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"position\":2,\"name\":\"News\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/regulation-safety#listItem\",\"name\":\"Regulation &amp; Safety\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/regulation-safety#listItem\",\"position\":3,\"name\":\"Regulation &amp; Safety\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/regulation-safety\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/regulation-safety\\\/4031#listItem\",\"name\":\"NRA Orders Kansai EP to Backfit Takahama and Other NPPs Based on New Volcano Impact Information\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/regulation-safety\\\/4031#listItem\",\"position\":4,\"name\":\"NRA Orders Kansai EP to Backfit Takahama and Other NPPs Based on New Volcano Impact Information\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/regulation-safety#listItem\",\"name\":\"Regulation &amp; Safety\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno\",\"name\":\"Kaoru Ohno\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/regulation-safety\\\/4031#webpage\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/regulation-safety\\\/4031\",\"name\":\"NRA Orders Kansai EP to Backfit Takahama and Other NPPs Based on New Volcano Impact Information - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"description\":\"The Takahama-1 through -4, Ohi-3 and -4 and Mihama-3 NPPs had already all cleared compatibility examinations with the new regulatory standards. However, the most recent analysis of a potential eruption of Mt. Daisen has predicted some 11 cubic kilometers of deposited ash in the Daisen-Namatake Tephra (the place being investigated in Kyoto City), more than\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/regulation-safety\\\/4031#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/wp-content\\\/uploads\\\/2019\\\/05\\\/DAISEN-e1559298898455.jpg\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/regulation-safety\\\/4031\\\/#mainImage\",\"width\":350,\"height\":233,\"caption\":\"Commissioner Ishiwatari (second from left) investigates volcanic ash distribution in October 2018 (photo provided by NRA)\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/regulation-safety\\\/4031#mainImage\"},\"datePublished\":\"2019-05-31T11:36:59+09:00\",\"dateModified\":\"2019-07-31T02:53:38+09:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"NRA Orders Kansai EP to Backfit Takahama and Other NPPs Based on New Volcano Impact Information - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"The Takahama-1 through -4, Ohi-3 and -4 and Mihama-3 NPPs had already all cleared compatibility examinations with the new regulatory standards. However, the most recent analysis of a potential eruption of Mt. Daisen has predicted some 11 cubic kilometers of deposited ash in the Daisen-Namatake Tephra (the place being investigated in Kyoto City), more than","canonical_url":"https:\/\/www.jaif.or.jp\/en\/news\/regulation-safety\/4031","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.jaif.or.jp\/en\/news\/regulation-safety\/4031#blogposting","name":"NRA Orders Kansai EP to Backfit Takahama and Other NPPs Based on New Volcano Impact Information - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","headline":"NRA Orders Kansai EP to Backfit Takahama and Other NPPs Based on New Volcano Impact Information","author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2019\/05\/DAISEN-e1559298898455.jpg","width":350,"height":233,"caption":"Commissioner Ishiwatari (second from left) investigates volcanic ash distribution in October 2018 (photo provided by NRA)"},"datePublished":"2019-05-31T11:36:59+09:00","dateModified":"2019-07-31T02:53:38+09:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/regulation-safety\/4031#webpage"},"isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/regulation-safety\/4031#webpage"},"articleSection":"Regulation &amp; Safety, Kansai, Mihama, NRA, Ohi, Takahama"},{"@type":"BreadcrumbList","@id":"https:\/\/www.jaif.or.jp\/en\/news\/regulation-safety\/4031#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.jaif.or.jp\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","position":2,"name":"News","item":"https:\/\/www.jaif.or.jp\/en\/news","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/regulation-safety#listItem","name":"Regulation &amp; Safety"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/regulation-safety#listItem","position":3,"name":"Regulation &amp; Safety","item":"https:\/\/www.jaif.or.jp\/en\/news\/regulation-safety","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/regulation-safety\/4031#listItem","name":"NRA Orders Kansai EP to Backfit Takahama and Other NPPs Based on New Volcano Impact Information"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/regulation-safety\/4031#listItem","position":4,"name":"NRA Orders Kansai EP to Backfit Takahama and Other NPPs Based on New Volcano Impact Information","previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/regulation-safety#listItem","name":"Regulation &amp; Safety"}}]},{"@type":"Organization","@id":"https:\/\/www.jaif.or.jp\/en\/#organization","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","url":"https:\/\/www.jaif.or.jp\/en\/"},{"@type":"Person","@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author","url":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno","name":"Kaoru Ohno"},{"@type":"WebPage","@id":"https:\/\/www.jaif.or.jp\/en\/news\/regulation-safety\/4031#webpage","url":"https:\/\/www.jaif.or.jp\/en\/news\/regulation-safety\/4031","name":"NRA Orders Kansai EP to Backfit Takahama and Other NPPs Based on New Volcano Impact Information - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"The Takahama-1 through -4, Ohi-3 and -4 and Mihama-3 NPPs had already all cleared compatibility examinations with the new regulatory standards. However, the most recent analysis of a potential eruption of Mt. Daisen has predicted some 11 cubic kilometers of deposited ash in the Daisen-Namatake Tephra (the place being investigated in Kyoto City), more than","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/regulation-safety\/4031#breadcrumblist"},"author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"creator":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2019\/05\/DAISEN-e1559298898455.jpg","@id":"https:\/\/www.jaif.or.jp\/en\/news\/regulation-safety\/4031\/#mainImage","width":350,"height":233,"caption":"Commissioner Ishiwatari (second from left) investigates volcanic ash distribution in October 2018 (photo provided by NRA)"},"primaryImageOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/regulation-safety\/4031#mainImage"},"datePublished":"2019-05-31T11:36:59+09:00","dateModified":"2019-07-31T02:53:38+09:00"},{"@type":"WebSite","@id":"https:\/\/www.jaif.or.jp\/en\/#website","url":"https:\/\/www.jaif.or.jp\/en\/","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:type":"article","og:title":"NRA Orders Kansai EP to Backfit Takahama and Other NPPs Based on New Volcano Impact Information - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:description":"The Takahama-1 through -4, Ohi-3 and -4 and Mihama-3 NPPs had already all cleared compatibility examinations with the new regulatory standards. However, the most recent analysis of a potential eruption of Mt. Daisen has predicted some 11 cubic kilometers of deposited ash in the Daisen-Namatake Tephra (the place being investigated in Kyoto City), more than","og:url":"https:\/\/www.jaif.or.jp\/en\/news\/regulation-safety\/4031","og:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2019\/05\/DAISEN-e1559298898455.jpg","og:image:secure_url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2019\/05\/DAISEN-e1559298898455.jpg","og:image:width":350,"og:image:height":233,"article:published_time":"2019-05-31T10:36:59+00:00","article:modified_time":"2019-07-31T01:53:38+00:00","twitter:card":"summary_large_image","twitter:site":"@Atoms_in_Japan","twitter:title":"NRA Orders Kansai EP to Backfit Takahama and Other NPPs Based on New Volcano Impact Information - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","twitter:description":"The Takahama-1 through -4, Ohi-3 and -4 and Mihama-3 NPPs had already all cleared compatibility examinations with the new regulatory standards. However, the most recent analysis of a potential eruption of Mt. Daisen has predicted some 11 cubic kilometers of deposited ash in the Daisen-Namatake Tephra (the place being investigated in Kyoto City), more than","twitter:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2019\/05\/DAISEN-e1559298898455.jpg"},"aioseo_meta_data":{"post_id":"4031","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"limit_modified_date":false,"created":"2022-04-29 14:13:19","updated":"2026-10-29 01:24:53","focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\" title=\"News\">News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\/regulation-safety\" title=\"Regulation &amp; Safety\">Regulation &amp; Safety<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tNRA Orders Kansai EP to Backfit Takahama and Other NPPs Based on New Volcano Impact Information\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.jaif.or.jp\/en\/"},{"label":"News","link":"https:\/\/www.jaif.or.jp\/en\/news"},{"label":"Regulation &amp; Safety","link":"https:\/\/www.jaif.or.jp\/en\/news\/regulation-safety"},{"label":"NRA Orders Kansai EP to Backfit Takahama and Other NPPs Based on New Volcano Impact Information","link":"https:\/\/www.jaif.or.jp\/en\/news\/regulation-safety\/4031"}],"_links":{"self":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/4031","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/comments?post=4031"}],"version-history":[{"count":1,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/4031\/revisions"}],"predecessor-version":[{"id":4033,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/4031\/revisions\/4033"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media\/4032"}],"wp:attachment":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media?parent=4031"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/categories?post=4031"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/tags?post=4031"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}