{"id":455,"date":"2014-11-17T04:20:59","date_gmt":"2014-11-17T04:20:59","guid":{"rendered":"http:\/\/www.jaif.or.jp\/en\/?p=455"},"modified":"2015-03-25T08:59:13","modified_gmt":"2015-03-25T08:59:13","slug":"tepco-announces-removal-of-one-more-roof-panel-at-unit-1","status":"publish","type":"post","link":"https:\/\/www.jaif.or.jp\/en\/news\/455","title":{"rendered":"TEPCO Announces Removal of One More Roof Panel at Unit 1"},"content":{"rendered":"<p>On November 10, the Tokyo Electric Power Co. (TEPCO) removed the second of six panels that make up the roof covering the reactor building at Unit 1 of the Fukushima Daiichi Nuclear Power Station (NPS).  The work is being conducted as one step toward the building\u2019s dismantling. <\/p>\n<p>The Unit 1 building cover had been installed in October 2011 to prevent radioactive materials from spreading into the surrounding environment.  Debris is still scattered around on the operating floor at the top of the reactor building. <\/p>\n<p>That debris will have to be taken away before the spent fuel assemblies from the spent fuel pool can be removed smoothly, reducing risk throughout the NPS, thus necessitating the dismantling of the reactor cover.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>On November 10, the Tokyo Electric Power Co. (TEPCO) removed the second of six panels that make up the roof covering the reactor building at Unit 1 of the Fukushima Daiichi Nuclear Power Station (NPS). The work is being conducted as one step toward the building\u2019s dismantling. The Unit 1 building cover had been installed [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[10,1],"tags":[46,272,23],"class_list":["post-455","post","type-post","status-publish","format-standard","hentry","category-fukushima","category-news","tag-decommission","tag-fukushima-daiichi-1","tag-tepco"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.4 - aioseo.com -->\n\t<meta name=\"description\" content=\"On November 10, the Tokyo Electric Power Co. (TEPCO) removed the second of six panels that make up the roof covering the reactor building at Unit 1 of the Fukushima Daiichi Nuclear Power Station (NPS). The work is being conducted as one step toward the building\u2019s dismantling. The Unit 1 building cover had been installed\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Kaoru Ohno\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.jaif.or.jp\/en\/news\/455\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.4\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"TEPCO Announces Removal of One More Roof Panel at Unit 1 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:description\" content=\"On November 10, the Tokyo Electric Power Co. (TEPCO) removed the second of six panels that make up the roof covering the reactor building at Unit 1 of the Fukushima Daiichi Nuclear Power Station (NPS). The work is being conducted as one step toward the building\u2019s dismantling. The Unit 1 building cover had been installed\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.jaif.or.jp\/en\/news\/455\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2022\/04\/dummy-scaled.webp\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2022\/04\/dummy-scaled.webp\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2014-11-17T04:20:59+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2015-03-25T08:59:13+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@Atoms_in_Japan\" \/>\n\t\t<meta name=\"twitter:title\" content=\"TEPCO Announces Removal of One More Roof Panel at Unit 1 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta name=\"twitter:description\" content=\"On November 10, the Tokyo Electric Power Co. (TEPCO) removed the second of six panels that make up the roof covering the reactor building at Unit 1 of the Fukushima Daiichi Nuclear Power Station (NPS). The work is being conducted as one step toward the building\u2019s dismantling. The Unit 1 building cover had been installed\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2022\/04\/dummy-scaled.webp\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/455#blogposting\",\"name\":\"TEPCO Announces Removal of One More Roof Panel at Unit 1 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"headline\":\"TEPCO Announces Removal of One More Roof Panel at Unit 1\",\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"},\"datePublished\":\"2014-11-17T04:20:59+09:00\",\"dateModified\":\"2015-03-25T08:59:13+09:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/455#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/455#webpage\"},\"articleSection\":\"Fukushima, News, decommission, Fukushima Daiichi-1, TEPCO\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/455#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"position\":2,\"name\":\"News\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/fukushima#listItem\",\"name\":\"Fukushima\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/fukushima#listItem\",\"position\":3,\"name\":\"Fukushima\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/fukushima\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/455#listItem\",\"name\":\"TEPCO Announces Removal of One More Roof Panel at Unit 1\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/455#listItem\",\"position\":4,\"name\":\"TEPCO Announces Removal of One More Roof Panel at Unit 1\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/fukushima#listItem\",\"name\":\"Fukushima\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno\",\"name\":\"Kaoru Ohno\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/455#webpage\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/455\",\"name\":\"TEPCO Announces Removal of One More Roof Panel at Unit 1 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"description\":\"On November 10, the Tokyo Electric Power Co. (TEPCO) removed the second of six panels that make up the roof covering the reactor building at Unit 1 of the Fukushima Daiichi Nuclear Power Station (NPS). The work is being conducted as one step toward the building\\u2019s dismantling. The Unit 1 building cover had been installed\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/455#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"datePublished\":\"2014-11-17T04:20:59+09:00\",\"dateModified\":\"2015-03-25T08:59:13+09:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"TEPCO Announces Removal of One More Roof Panel at Unit 1 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"On November 10, the Tokyo Electric Power Co. (TEPCO) removed the second of six panels that make up the roof covering the reactor building at Unit 1 of the Fukushima Daiichi Nuclear Power Station (NPS). The work is being conducted as one step toward the building\u2019s dismantling. The Unit 1 building cover had been installed","canonical_url":"https:\/\/www.jaif.or.jp\/en\/news\/455","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.jaif.or.jp\/en\/news\/455#blogposting","name":"TEPCO Announces Removal of One More Roof Panel at Unit 1 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","headline":"TEPCO Announces Removal of One More Roof Panel at Unit 1","author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"},"datePublished":"2014-11-17T04:20:59+09:00","dateModified":"2015-03-25T08:59:13+09:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/455#webpage"},"isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/455#webpage"},"articleSection":"Fukushima, News, decommission, Fukushima Daiichi-1, TEPCO"},{"@type":"BreadcrumbList","@id":"https:\/\/www.jaif.or.jp\/en\/news\/455#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.jaif.or.jp\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","position":2,"name":"News","item":"https:\/\/www.jaif.or.jp\/en\/news","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/fukushima#listItem","name":"Fukushima"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/fukushima#listItem","position":3,"name":"Fukushima","item":"https:\/\/www.jaif.or.jp\/en\/news\/fukushima","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/455#listItem","name":"TEPCO Announces Removal of One More Roof Panel at Unit 1"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/455#listItem","position":4,"name":"TEPCO Announces Removal of One More Roof Panel at Unit 1","previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/fukushima#listItem","name":"Fukushima"}}]},{"@type":"Organization","@id":"https:\/\/www.jaif.or.jp\/en\/#organization","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","url":"https:\/\/www.jaif.or.jp\/en\/"},{"@type":"Person","@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author","url":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno","name":"Kaoru Ohno"},{"@type":"WebPage","@id":"https:\/\/www.jaif.or.jp\/en\/news\/455#webpage","url":"https:\/\/www.jaif.or.jp\/en\/news\/455","name":"TEPCO Announces Removal of One More Roof Panel at Unit 1 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"On November 10, the Tokyo Electric Power Co. (TEPCO) removed the second of six panels that make up the roof covering the reactor building at Unit 1 of the Fukushima Daiichi Nuclear Power Station (NPS). The work is being conducted as one step toward the building\u2019s dismantling. The Unit 1 building cover had been installed","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/455#breadcrumblist"},"author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"creator":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"datePublished":"2014-11-17T04:20:59+09:00","dateModified":"2015-03-25T08:59:13+09:00"},{"@type":"WebSite","@id":"https:\/\/www.jaif.or.jp\/en\/#website","url":"https:\/\/www.jaif.or.jp\/en\/","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:type":"article","og:title":"TEPCO Announces Removal of One More Roof Panel at Unit 1 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:description":"On November 10, the Tokyo Electric Power Co. (TEPCO) removed the second of six panels that make up the roof covering the reactor building at Unit 1 of the Fukushima Daiichi Nuclear Power Station (NPS). The work is being conducted as one step toward the building\u2019s dismantling. The Unit 1 building cover had been installed","og:url":"https:\/\/www.jaif.or.jp\/en\/news\/455","og:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2022\/04\/dummy-scaled.webp","og:image:secure_url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2022\/04\/dummy-scaled.webp","article:published_time":"2014-11-17T04:20:59+00:00","article:modified_time":"2015-03-25T08:59:13+00:00","twitter:card":"summary_large_image","twitter:site":"@Atoms_in_Japan","twitter:title":"TEPCO Announces Removal of One More Roof Panel at Unit 1 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","twitter:description":"On November 10, the Tokyo Electric Power Co. (TEPCO) removed the second of six panels that make up the roof covering the reactor building at Unit 1 of the Fukushima Daiichi Nuclear Power Station (NPS). The work is being conducted as one step toward the building\u2019s dismantling. The Unit 1 building cover had been installed","twitter:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2022\/04\/dummy-scaled.webp"},"aioseo_meta_data":{"post_id":"455","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"limit_modified_date":false,"created":"2022-04-29 13:08:16","updated":"2026-10-28 23:41:54","focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\" title=\"News\">News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\/fukushima\" title=\"Fukushima\">Fukushima<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tTEPCO Announces Removal of One More Roof Panel at Unit 1\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.jaif.or.jp\/en\/"},{"label":"News","link":"https:\/\/www.jaif.or.jp\/en\/news"},{"label":"Fukushima","link":"https:\/\/www.jaif.or.jp\/en\/news\/fukushima"},{"label":"TEPCO Announces Removal of One More Roof Panel at Unit 1","link":"https:\/\/www.jaif.or.jp\/en\/news\/455"}],"_links":{"self":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/455","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/comments?post=455"}],"version-history":[{"count":1,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/455\/revisions"}],"predecessor-version":[{"id":456,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/455\/revisions\/456"}],"wp:attachment":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media?parent=455"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/categories?post=455"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/tags?post=455"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}