{"id":6752,"date":"2023-10-13T13:21:34","date_gmt":"2023-10-13T04:21:34","guid":{"rendered":"https:\/\/www.jaif.or.jp\/en\/?p=6752"},"modified":"2023-10-13T15:09:07","modified_gmt":"2023-10-13T06:09:07","slug":"takahama-2-resumes-generation-japans-3rd-unit-to-operate-beyond-40-years","status":"publish","type":"post","link":"https:\/\/www.jaif.or.jp\/en\/news\/6752","title":{"rendered":"Takahama-2 Resumes Generation: Japan\u2019s 3rd Unit to Operate Beyond 40 Years"},"content":{"rendered":"<p>Takahama-2 made its debut as Japan\u2019s tenth commercial reactor on November 14, 1975, exactly one year after Takahama-1. It now boasts the second longest operating duration in Japan, from the commencement of commercial service.<\/p>\n<p>Compatibility examinations of Takahama-1 and -2 under the new regulatory standards were essentially carried out in parallel. Permission was given to both to make changes to their reactor installations (basic design approvals) in 2016, and agreements were reached in 2021 with local communities on restarting them.<\/p>\n<p>Takahama-1 was restarted on August 2, 2023, ahead of Takahama-2, and went back online on August 28. Takahama-2 was restarted on September 15 after an emergency response building, referred to in the standards as a \u201cspecific safety facility,\u201d became operational on August 13.<\/p>\n<p>Takahama-2 could return to commercial operation as early as October 16, after adjustment operations and a final inspection by the Nuclear Regulation Authority (NRA).<\/p>\n<p>With the restart of Takahama-2, all seven NPPs (6,578MW) owned by Kansai EP\u2015Mihama-3, Takahama-1, -2, -3 and -4, and Oi-3 and -4\u2015are generating power again.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Takahama-2 made its debut as Japan\u2019s tenth commercial reactor on November 14, 1975, exactly one year after Takahama-1. It now boasts the second longest operating duration in Japan, from the commencement of commercial service. Compatibility examinations of Takahama-1 and -2 under the new regulatory standards were essentially carried out in parallel. Permission was given to [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":6753,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9,1,6],"tags":[595,280],"class_list":["post-6752","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry","category-news","category-npps","tag-kansai-ep","tag-takahama-2"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.4 - aioseo.com -->\n\t<meta name=\"description\" content=\"Takahama-2 made its debut as Japan\u2019s tenth commercial reactor on November 14, 1975, exactly one year after Takahama-1. It now boasts the second longest operating duration in Japan, from the commencement of commercial service. Compatibility examinations of Takahama-1 and -2 under the new regulatory standards were essentially carried out in parallel. Permission was given to\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Kaoru Ohno\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.jaif.or.jp\/en\/news\/6752\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.4\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Takahama-2 Resumes Generation: Japan\u2019s 3rd Unit to Operate Beyond 40 Years - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:description\" content=\"Takahama-2 made its debut as Japan\u2019s tenth commercial reactor on November 14, 1975, exactly one year after Takahama-1. It now boasts the second longest operating duration in Japan, from the commencement of commercial service. Compatibility examinations of Takahama-1 and -2 under the new regulatory standards were essentially carried out in parallel. Permission was given to\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.jaif.or.jp\/en\/news\/6752\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2023\/09\/\u30d7\u30ec\u30bc\u30f3\u30c6\u30fc\u30b7\u30e7\u30f31.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2023\/09\/\u30d7\u30ec\u30bc\u30f3\u30c6\u30fc\u30b7\u30e7\u30f31.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"960\" \/>\n\t\t<meta property=\"og:image:height\" content=\"720\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2023-10-13T04:21:34+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2023-10-13T06:09:07+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@Atoms_in_Japan\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Takahama-2 Resumes Generation: Japan\u2019s 3rd Unit to Operate Beyond 40 Years - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Takahama-2 made its debut as Japan\u2019s tenth commercial reactor on November 14, 1975, exactly one year after Takahama-1. It now boasts the second longest operating duration in Japan, from the commencement of commercial service. Compatibility examinations of Takahama-1 and -2 under the new regulatory standards were essentially carried out in parallel. Permission was given to\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2023\/10\/takahama12.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/6752#blogposting\",\"name\":\"Takahama-2 Resumes Generation: Japan\\u2019s 3rd Unit to Operate Beyond 40 Years - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"headline\":\"Takahama-2 Resumes Generation: Japan\\u2019s 3rd Unit to Operate Beyond 40 Years\",\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/takahama12.jpg\",\"width\":730,\"height\":420,\"caption\":\"Takahama NPPs \\u00a9Kansai EP\"},\"datePublished\":\"2023-10-13T13:21:34+09:00\",\"dateModified\":\"2023-10-13T15:09:07+09:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/6752#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/6752#webpage\"},\"articleSection\":\"Industry, News, NPPs, Kansai EP, Takahama-2\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/6752#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"position\":2,\"name\":\"News\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"position\":3,\"name\":\"NPPs\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/6752#listItem\",\"name\":\"Takahama-2 Resumes Generation: Japan\\u2019s 3rd Unit to Operate Beyond 40 Years\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/6752#listItem\",\"position\":4,\"name\":\"Takahama-2 Resumes Generation: Japan\\u2019s 3rd Unit to Operate Beyond 40 Years\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno\",\"name\":\"Kaoru Ohno\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/6752#webpage\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/6752\",\"name\":\"Takahama-2 Resumes Generation: Japan\\u2019s 3rd Unit to Operate Beyond 40 Years - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"description\":\"Takahama-2 made its debut as Japan\\u2019s tenth commercial reactor on November 14, 1975, exactly one year after Takahama-1. It now boasts the second longest operating duration in Japan, from the commencement of commercial service. Compatibility examinations of Takahama-1 and -2 under the new regulatory standards were essentially carried out in parallel. Permission was given to\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/6752#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/takahama12.jpg\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/6752\\\/#mainImage\",\"width\":730,\"height\":420,\"caption\":\"Takahama NPPs \\u00a9Kansai EP\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/6752#mainImage\"},\"datePublished\":\"2023-10-13T13:21:34+09:00\",\"dateModified\":\"2023-10-13T15:09:07+09:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Takahama-2 Resumes Generation: Japan\u2019s 3rd Unit to Operate Beyond 40 Years - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"Takahama-2 made its debut as Japan\u2019s tenth commercial reactor on November 14, 1975, exactly one year after Takahama-1. It now boasts the second longest operating duration in Japan, from the commencement of commercial service. Compatibility examinations of Takahama-1 and -2 under the new regulatory standards were essentially carried out in parallel. Permission was given to","canonical_url":"https:\/\/www.jaif.or.jp\/en\/news\/6752","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.jaif.or.jp\/en\/news\/6752#blogposting","name":"Takahama-2 Resumes Generation: Japan\u2019s 3rd Unit to Operate Beyond 40 Years - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","headline":"Takahama-2 Resumes Generation: Japan\u2019s 3rd Unit to Operate Beyond 40 Years","author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2023\/10\/takahama12.jpg","width":730,"height":420,"caption":"Takahama NPPs \u00a9Kansai EP"},"datePublished":"2023-10-13T13:21:34+09:00","dateModified":"2023-10-13T15:09:07+09:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/6752#webpage"},"isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/6752#webpage"},"articleSection":"Industry, News, NPPs, Kansai EP, Takahama-2"},{"@type":"BreadcrumbList","@id":"https:\/\/www.jaif.or.jp\/en\/news\/6752#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.jaif.or.jp\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","position":2,"name":"News","item":"https:\/\/www.jaif.or.jp\/en\/news","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","position":3,"name":"NPPs","item":"https:\/\/www.jaif.or.jp\/en\/news\/npps","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/6752#listItem","name":"Takahama-2 Resumes Generation: Japan\u2019s 3rd Unit to Operate Beyond 40 Years"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/6752#listItem","position":4,"name":"Takahama-2 Resumes Generation: Japan\u2019s 3rd Unit to Operate Beyond 40 Years","previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"}}]},{"@type":"Organization","@id":"https:\/\/www.jaif.or.jp\/en\/#organization","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","url":"https:\/\/www.jaif.or.jp\/en\/"},{"@type":"Person","@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author","url":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno","name":"Kaoru Ohno"},{"@type":"WebPage","@id":"https:\/\/www.jaif.or.jp\/en\/news\/6752#webpage","url":"https:\/\/www.jaif.or.jp\/en\/news\/6752","name":"Takahama-2 Resumes Generation: Japan\u2019s 3rd Unit to Operate Beyond 40 Years - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"Takahama-2 made its debut as Japan\u2019s tenth commercial reactor on November 14, 1975, exactly one year after Takahama-1. It now boasts the second longest operating duration in Japan, from the commencement of commercial service. Compatibility examinations of Takahama-1 and -2 under the new regulatory standards were essentially carried out in parallel. Permission was given to","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/6752#breadcrumblist"},"author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"creator":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2023\/10\/takahama12.jpg","@id":"https:\/\/www.jaif.or.jp\/en\/news\/6752\/#mainImage","width":730,"height":420,"caption":"Takahama NPPs \u00a9Kansai EP"},"primaryImageOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/6752#mainImage"},"datePublished":"2023-10-13T13:21:34+09:00","dateModified":"2023-10-13T15:09:07+09:00"},{"@type":"WebSite","@id":"https:\/\/www.jaif.or.jp\/en\/#website","url":"https:\/\/www.jaif.or.jp\/en\/","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:type":"article","og:title":"Takahama-2 Resumes Generation: Japan\u2019s 3rd Unit to Operate Beyond 40 Years - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:description":"Takahama-2 made its debut as Japan\u2019s tenth commercial reactor on November 14, 1975, exactly one year after Takahama-1. It now boasts the second longest operating duration in Japan, from the commencement of commercial service. Compatibility examinations of Takahama-1 and -2 under the new regulatory standards were essentially carried out in parallel. Permission was given to","og:url":"https:\/\/www.jaif.or.jp\/en\/news\/6752","og:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2023\/09\/\u30d7\u30ec\u30bc\u30f3\u30c6\u30fc\u30b7\u30e7\u30f31.jpg","og:image:secure_url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2023\/09\/\u30d7\u30ec\u30bc\u30f3\u30c6\u30fc\u30b7\u30e7\u30f31.jpg","og:image:width":960,"og:image:height":720,"article:published_time":"2023-10-13T04:21:34+00:00","article:modified_time":"2023-10-13T06:09:07+00:00","twitter:card":"summary_large_image","twitter:site":"@Atoms_in_Japan","twitter:title":"Takahama-2 Resumes Generation: Japan\u2019s 3rd Unit to Operate Beyond 40 Years - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","twitter:description":"Takahama-2 made its debut as Japan\u2019s tenth commercial reactor on November 14, 1975, exactly one year after Takahama-1. It now boasts the second longest operating duration in Japan, from the commencement of commercial service. Compatibility examinations of Takahama-1 and -2 under the new regulatory standards were essentially carried out in parallel. Permission was given to","twitter:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2023\/10\/takahama12.jpg"},"aioseo_meta_data":{"post_id":"6752","title":null,"description":null,"keywords":[],"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"custom_image","og_image_url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2023\/09\/\u30d7\u30ec\u30bc\u30f3\u30c6\u30fc\u30b7\u30e7\u30f31.jpg","og_image_width":"960","og_image_height":"720","og_image_custom_url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2023\/09\/\u30d7\u30ec\u30bc\u30f3\u30c6\u30fc\u30b7\u30e7\u30f31.jpg","og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":[],"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"limit_modified_date":false,"created":"2023-10-13 04:20:38","updated":"2026-10-29 02:18:50","focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\" title=\"News\">News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\/npps\" title=\"NPPs\">NPPs<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tTakahama-2 Resumes Generation: Japan\u2019s 3rd Unit to Operate Beyond 40 Years\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.jaif.or.jp\/en\/"},{"label":"News","link":"https:\/\/www.jaif.or.jp\/en\/news"},{"label":"NPPs","link":"https:\/\/www.jaif.or.jp\/en\/news\/npps"},{"label":"Takahama-2 Resumes Generation: Japan\u2019s 3rd Unit to Operate Beyond 40 Years","link":"https:\/\/www.jaif.or.jp\/en\/news\/6752"}],"_links":{"self":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/6752","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/comments?post=6752"}],"version-history":[{"count":1,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/6752\/revisions"}],"predecessor-version":[{"id":6754,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/6752\/revisions\/6754"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media\/6753"}],"wp:attachment":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media?parent=6752"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/categories?post=6752"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/tags?post=6752"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}