{"id":7136,"date":"2024-07-17T17:15:04","date_gmt":"2024-07-17T08:15:04","guid":{"rendered":"https:\/\/www.jaif.or.jp\/en\/?p=7136"},"modified":"2024-07-26T14:29:20","modified_gmt":"2024-07-26T05:29:20","slug":"takahama-3-and-4-obtain-local-approval-for-operation-beyond-40-years","status":"publish","type":"post","link":"https:\/\/www.jaif.or.jp\/en\/news\/7136","title":{"rendered":"Takahama-3 and -4 Obtain Local Approval for Operation Beyond 40 Years"},"content":{"rendered":"<p>Kansai EP already owns and operates three other reactors that have been in operation longer than 40 years: the Mihama-3 (PWR, 826MW) and the Takahama-1 and -2 (PWRs, 826MW each).<\/p>\n<p>On July 9, Fukui Prefecture and Takahama Town\u2014where Units 3 and 4 are located\u2014approved the extensions of their operating lifetimes. Upon that announcement, Kansai EP released a comment that read, \u201cWith the understanding of the public both locally and nationally, we will endeavor to further enhance the safety and reliability of our NPPs.\u201d<\/p>\n<p>Based on its evaluations of age deterioration, the power company will replace the two sets of steam generators (SGs) at Takahama-3 and -4 to ensure long-term reliability. With the NRA\u2019s approval, replacement work is scheduled during the units\u2019 periodic inspections from June to October 2026 (Takahama-3) and from October 2026 to February 2027 (Takahama-4).<\/p>\n<p>Also on July 9, Kansai EP received approvals from both Fukui Prefecture and Takahama Town for its plan to replace the reactor core internals at Takahama-1 and -2, and to proceed with its applications for permission to make changes to the reactor installations. The company will conduct preparations and file those applications with the NRA.<\/p>\n<p>The replacement work at the two units is scheduled from June to December 2028 (Takahama-1) and from November 2028 to April 2029 (Takahama-2).<\/p>\n<p>This summer, in addition to Kansai EP\u2019s three units, the first NPP unit restarted under the new regulatory standards\u2014the Sendai-1 (PWR, 890MW), owned and operated by the Kyushu Electric Power Co.\u2015passed its mark of 40 years of service on July 4, the fourth domestic NPP to do so.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Kansai EP already owns and operates three other reactors that have been in operation longer than 40 years: the Mihama-3 (PWR, 826MW) and the Takahama-1 and -2 (PWRs, 826MW each). On July 9, Fukui Prefecture and Takahama Town\u2014where Units 3 and 4 are located\u2014approved the extensions of their operating lifetimes. Upon that announcement, Kansai EP [&hellip;]<\/p>\n","protected":false},"author":14,"featured_media":7071,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9,1,6,8,7],"tags":[595,1010,271,17,284,285],"class_list":["post-7136","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry","category-news","category-npps","category-policies","category-regulation-safety","tag-kansai-ep","tag-kyushu-electric-power-co","tag-sendai-1","tag-takahama","tag-takahama-3","tag-takahama-4"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/7136","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/users\/14"}],"replies":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/comments?post=7136"}],"version-history":[{"count":1,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/7136\/revisions"}],"predecessor-version":[{"id":7137,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/7136\/revisions\/7137"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media\/7071"}],"wp:attachment":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media?parent=7136"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/categories?post=7136"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/tags?post=7136"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}