{"id":7318,"date":"2024-12-26T16:21:06","date_gmt":"2024-12-26T07:21:06","guid":{"rendered":"https:\/\/www.jaif.or.jp\/en\/?p=7318"},"modified":"2025-01-08T19:41:03","modified_gmt":"2025-01-08T10:41:03","slug":"shimane-2-becomes-japans-second-bwr-to-resume-power-generation","status":"publish","type":"post","link":"https:\/\/www.jaif.or.jp\/en\/news\/7318","title":{"rendered":"Shimane-2 Becomes Japan\u2019s Second BWR to Resume Power Generation"},"content":{"rendered":"<p>The reactor is expected to resume commercial operation on January 10, 2025, after the Japan Nuclear Regulation Authority (NRA) issues a pre-operational certificate, marking the plant&#8217;s return to operation for the first time since it stopped owing to regular inspections that began in January 2012.<\/p>\n<p>Shimane-2 is Japan\u2019s 14th NPP to resume operation ever since the country\u2019s new regulatory standards came into effect in 2013, and the second boiling water reactor (BWR) to do so, following Onagawa-2, owned and operated by the Tohoku Electric Power Co., which restarted \u00a0on November 15.<\/p>\n<p>Shimane-2, located in western Japan, had continued to operate even after the giant earthquake (known officially as the Great East Japan Earthquake) that struck eastern Japan in March 2011, but it was shut down in January 2012 when it entered regular inspections, as mentioned already. Subsequently, in December 2013, Chugoku Electric submitted an application for a review in accordance with the new regulatory standards.<\/p>\n<p>In September 2021, after receiving approval for making a modification to the reactor\u2019s installation, the power company restarted Shimane-2 earlier this month (on December 7, 2024), with the approval of the local community.<\/p>\n<p>After the resumption of power generation at Shimane-2, Chugoku Electric President NAKAGAWA Kengo expressed his gratitude to all those concerned as well as to the local community. He also stressed the significance of the event, saying, \u201cIt is essential to support the stable supply of electricity, especially in the Chugoku region [in western Honshu, including Hiroshima], as well as to achieve carbon neutrality and stabilize electricity prices.\u201d<\/p>\n<p>In addition, he reiterated the company&#8217;s mission, as an electricity supplier, to provide a stable supply of low-cost electricity with minimal environmental impact and expressed his commitment to steadily confirm the integrity of the facilities so that commercial operations could resume with a sense of urgency and stable operations be continued henceforth.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The reactor is expected to resume commercial operation on January 10, 2025, after the Japan Nuclear Regulation Authority (NRA) issues a pre-operational certificate, marking the plant&#8217;s return to operation for the first time since it stopped owing to regular inspections that began in January 2012. Shimane-2 is Japan\u2019s 14th NPP to resume operation ever since [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":7319,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9,1,6],"tags":[402,976,19,405],"class_list":["post-7318","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry","category-news","category-npps","tag-bwr","tag-chugoku-electric-power-co","tag-nra","tag-shimane-2"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.4 - aioseo.com -->\n\t<meta name=\"description\" content=\"The reactor is expected to resume commercial operation on January 10, 2025, after the Japan Nuclear Regulation Authority (NRA) issues a pre-operational certificate, marking the plant&#039;s return to operation for the first time since it stopped owing to regular inspections that began in January 2012. Shimane-2 is Japan\u2019s 14th NPP to resume operation ever since\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Kaoru Ohno\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.jaif.or.jp\/en\/news\/7318\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.4\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Shimane-2 Becomes Japan\u2019s Second BWR to Resume Power Generation - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:description\" content=\"The reactor is expected to resume commercial operation on January 10, 2025, after the Japan Nuclear Regulation Authority (NRA) issues a pre-operational certificate, marking the plant&#039;s return to operation for the first time since it stopped owing to regular inspections that began in January 2012. Shimane-2 is Japan\u2019s 14th NPP to resume operation ever since\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.jaif.or.jp\/en\/news\/7318\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2024\/12\/\u5cf6\u68391-2\u53f7\u6a5f.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2024\/12\/\u5cf6\u68391-2\u53f7\u6a5f.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1500\" \/>\n\t\t<meta property=\"og:image:height\" content=\"1125\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-12-26T07:21:06+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2025-01-08T10:41:03+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@Atoms_in_Japan\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Shimane-2 Becomes Japan\u2019s Second BWR to Resume Power Generation - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta name=\"twitter:description\" content=\"The reactor is expected to resume commercial operation on January 10, 2025, after the Japan Nuclear Regulation Authority (NRA) issues a pre-operational certificate, marking the plant&#039;s return to operation for the first time since it stopped owing to regular inspections that began in January 2012. Shimane-2 is Japan\u2019s 14th NPP to resume operation ever since\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2024\/12\/\u5cf6\u68391-2\u53f7\u6a5f.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7318#blogposting\",\"name\":\"Shimane-2 Becomes Japan\\u2019s Second BWR to Resume Power Generation - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"headline\":\"Shimane-2 Becomes Japan\\u2019s Second BWR to Resume Power Generation\",\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/\\u5cf6\\u68391-2\\u53f7\\u6a5f.jpg\",\"width\":1500,\"height\":1125,\"caption\":\"Shimane-1 and -2 NPPs\"},\"datePublished\":\"2024-12-26T16:21:06+09:00\",\"dateModified\":\"2025-01-08T19:41:03+09:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7318#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7318#webpage\"},\"articleSection\":\"Industry, News, NPPs, BWR, Chugoku Electric Power Co., NRA, Shimane-2\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7318#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"position\":2,\"name\":\"News\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"position\":3,\"name\":\"NPPs\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7318#listItem\",\"name\":\"Shimane-2 Becomes Japan\\u2019s Second BWR to Resume Power Generation\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7318#listItem\",\"position\":4,\"name\":\"Shimane-2 Becomes Japan\\u2019s Second BWR to Resume Power Generation\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno\",\"name\":\"Kaoru Ohno\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7318#webpage\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7318\",\"name\":\"Shimane-2 Becomes Japan\\u2019s Second BWR to Resume Power Generation - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"description\":\"The reactor is expected to resume commercial operation on January 10, 2025, after the Japan Nuclear Regulation Authority (NRA) issues a pre-operational certificate, marking the plant's return to operation for the first time since it stopped owing to regular inspections that began in January 2012. Shimane-2 is Japan\\u2019s 14th NPP to resume operation ever since\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7318#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/\\u5cf6\\u68391-2\\u53f7\\u6a5f.jpg\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7318\\\/#mainImage\",\"width\":1500,\"height\":1125,\"caption\":\"Shimane-1 and -2 NPPs\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7318#mainImage\"},\"datePublished\":\"2024-12-26T16:21:06+09:00\",\"dateModified\":\"2025-01-08T19:41:03+09:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Shimane-2 Becomes Japan\u2019s Second BWR to Resume Power Generation - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"The reactor is expected to resume commercial operation on January 10, 2025, after the Japan Nuclear Regulation Authority (NRA) issues a pre-operational certificate, marking the plant's return to operation for the first time since it stopped owing to regular inspections that began in January 2012. Shimane-2 is Japan\u2019s 14th NPP to resume operation ever since","canonical_url":"https:\/\/www.jaif.or.jp\/en\/news\/7318","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.jaif.or.jp\/en\/news\/7318#blogposting","name":"Shimane-2 Becomes Japan\u2019s Second BWR to Resume Power Generation - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","headline":"Shimane-2 Becomes Japan\u2019s Second BWR to Resume Power Generation","author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2024\/12\/\u5cf6\u68391-2\u53f7\u6a5f.jpg","width":1500,"height":1125,"caption":"Shimane-1 and -2 NPPs"},"datePublished":"2024-12-26T16:21:06+09:00","dateModified":"2025-01-08T19:41:03+09:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/7318#webpage"},"isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/7318#webpage"},"articleSection":"Industry, News, NPPs, BWR, Chugoku Electric Power Co., NRA, Shimane-2"},{"@type":"BreadcrumbList","@id":"https:\/\/www.jaif.or.jp\/en\/news\/7318#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.jaif.or.jp\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","position":2,"name":"News","item":"https:\/\/www.jaif.or.jp\/en\/news","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","position":3,"name":"NPPs","item":"https:\/\/www.jaif.or.jp\/en\/news\/npps","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/7318#listItem","name":"Shimane-2 Becomes Japan\u2019s Second BWR to Resume Power Generation"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/7318#listItem","position":4,"name":"Shimane-2 Becomes Japan\u2019s Second BWR to Resume Power Generation","previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"}}]},{"@type":"Organization","@id":"https:\/\/www.jaif.or.jp\/en\/#organization","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","url":"https:\/\/www.jaif.or.jp\/en\/"},{"@type":"Person","@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author","url":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno","name":"Kaoru Ohno"},{"@type":"WebPage","@id":"https:\/\/www.jaif.or.jp\/en\/news\/7318#webpage","url":"https:\/\/www.jaif.or.jp\/en\/news\/7318","name":"Shimane-2 Becomes Japan\u2019s Second BWR to Resume Power Generation - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"The reactor is expected to resume commercial operation on January 10, 2025, after the Japan Nuclear Regulation Authority (NRA) issues a pre-operational certificate, marking the plant's return to operation for the first time since it stopped owing to regular inspections that began in January 2012. Shimane-2 is Japan\u2019s 14th NPP to resume operation ever since","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/7318#breadcrumblist"},"author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"creator":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2024\/12\/\u5cf6\u68391-2\u53f7\u6a5f.jpg","@id":"https:\/\/www.jaif.or.jp\/en\/news\/7318\/#mainImage","width":1500,"height":1125,"caption":"Shimane-1 and -2 NPPs"},"primaryImageOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/7318#mainImage"},"datePublished":"2024-12-26T16:21:06+09:00","dateModified":"2025-01-08T19:41:03+09:00"},{"@type":"WebSite","@id":"https:\/\/www.jaif.or.jp\/en\/#website","url":"https:\/\/www.jaif.or.jp\/en\/","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:type":"article","og:title":"Shimane-2 Becomes Japan\u2019s Second BWR to Resume Power Generation - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:description":"The reactor is expected to resume commercial operation on January 10, 2025, after the Japan Nuclear Regulation Authority (NRA) issues a pre-operational certificate, marking the plant's return to operation for the first time since it stopped owing to regular inspections that began in January 2012. Shimane-2 is Japan\u2019s 14th NPP to resume operation ever since","og:url":"https:\/\/www.jaif.or.jp\/en\/news\/7318","og:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2024\/12\/\u5cf6\u68391-2\u53f7\u6a5f.jpg","og:image:secure_url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2024\/12\/\u5cf6\u68391-2\u53f7\u6a5f.jpg","og:image:width":1500,"og:image:height":1125,"article:published_time":"2024-12-26T07:21:06+00:00","article:modified_time":"2025-01-08T10:41:03+00:00","twitter:card":"summary_large_image","twitter:site":"@Atoms_in_Japan","twitter:title":"Shimane-2 Becomes Japan\u2019s Second BWR to Resume Power Generation - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","twitter:description":"The reactor is expected to resume commercial operation on January 10, 2025, after the Japan Nuclear Regulation Authority (NRA) issues a pre-operational certificate, marking the plant's return to operation for the first time since it stopped owing to regular inspections that began in January 2012. Shimane-2 is Japan\u2019s 14th NPP to resume operation ever since","twitter:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2024\/12\/\u5cf6\u68391-2\u53f7\u6a5f.jpg"},"aioseo_meta_data":{"post_id":"7318","title":null,"description":null,"keywords":[],"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":[],"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"limit_modified_date":false,"created":"2024-12-26 07:21:06","updated":"2026-10-29 02:40:55","focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\" title=\"News\">News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\/npps\" title=\"NPPs\">NPPs<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tShimane-2 Becomes Japan\u2019s Second BWR to Resume Power Generation\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.jaif.or.jp\/en\/"},{"label":"News","link":"https:\/\/www.jaif.or.jp\/en\/news"},{"label":"NPPs","link":"https:\/\/www.jaif.or.jp\/en\/news\/npps"},{"label":"Shimane-2 Becomes Japan\u2019s Second BWR to Resume Power Generation","link":"https:\/\/www.jaif.or.jp\/en\/news\/7318"}],"_links":{"self":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/7318","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/comments?post=7318"}],"version-history":[{"count":1,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/7318\/revisions"}],"predecessor-version":[{"id":7320,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/7318\/revisions\/7320"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media\/7319"}],"wp:attachment":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media?parent=7318"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/categories?post=7318"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/tags?post=7318"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}