{"id":7332,"date":"2025-01-09T10:55:29","date_gmt":"2025-01-09T01:55:29","guid":{"rendered":"https:\/\/www.jaif.or.jp\/en\/?p=7332"},"modified":"2025-01-16T16:02:02","modified_gmt":"2025-01-16T07:02:02","slug":"steam-turbines-at-genkai-3-and-4-to-be-upgraded","status":"publish","type":"post","link":"https:\/\/www.jaif.or.jp\/en\/news\/7332","title":{"rendered":"Steam Turbines at Genkai-3 and -4 to Be Upgraded"},"content":{"rendered":"<p>A steam generator (SG) comprises one high-pressure turbine and three low-pressure turbines. The upgrading work will be done at Unit 3 in FY27 (April 2027 to March 2028) and Unit 4 in FY28 (April 2028 to March 2029). Kyushu Electric said that the replacements would \u201cimprove reliability and generation efficiency.\u201d<\/p>\n<p>Kyushu Electric Power placed its order for the SG replacement work with Mitsubishi Heavy Industries (MHI), whose Takasago Machinery Works in Hyogo Prefecture will design, manufacture, and complete the work at the site. According to the company\u2019s announcement steam turbines to be delivered will include 54-inch blades that the company itself has designed and developed.<\/p>\n<p>As a PWR plant manufacturer, MHI has demonstrated its superior technological capabilities both domestically and internationally. Already, MHI has delivered four such units in Japan and five overseas. In January 2024, it finished the production of SGs for three units to be used by \u00c9lectricit\u00e9 de France S.A. (EDF) in France, and will eventually supply nine SGs to that company. The processing precision needed for the part was on the order of 0.01mm.<\/p>\n<p>Since entering service, Genkai-3 has operated for 30 years and Genkai-4 for 27 years. Genkai-3\u2019s long-term facility management plan is now being examined by the NRA as a requirement for the unit to continue operation beyond 30 years, under standards for aging reactors that will fully come into effect in June 2025 as part of a new bundle of legislation known collectively as the Green Transformation (GX) Decarbonization Power Supply Bill.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A steam generator (SG) comprises one high-pressure turbine and three low-pressure turbines. The upgrading work will be done at Unit 3 in FY27 (April 2027 to March 2028) and Unit 4 in FY28 (April 2028 to March 2029). Kyushu Electric said that the replacements would \u201cimprove reliability and generation efficiency.\u201d Kyushu Electric Power placed its [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":7333,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9,1,6],"tags":[450,451,1229,189,19,1228,1230],"class_list":["post-7332","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry","category-news","category-npps","tag-genkai-3","tag-genkai-4","tag-kyushu-electric-power","tag-mhi","tag-nra","tag-steam-turbines","tag-the-green-transformation-gx-decarbonization-power-supply-bill"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.4 - aioseo.com -->\n\t<meta name=\"description\" content=\"A steam generator (SG) comprises one high-pressure turbine and three low-pressure turbines. The upgrading work will be done at Unit 3 in FY27 (April 2027 to March 2028) and Unit 4 in FY28 (April 2028 to March 2029). Kyushu Electric said that the replacements would \u201cimprove reliability and generation efficiency.\u201d Kyushu Electric Power placed its\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Kaoru Ohno\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.jaif.or.jp\/en\/news\/7332\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.4\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Steam Turbines at Genkai-3 and -4 to Be Upgraded - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:description\" content=\"A steam generator (SG) comprises one high-pressure turbine and three low-pressure turbines. The upgrading work will be done at Unit 3 in FY27 (April 2027 to March 2028) and Unit 4 in FY28 (April 2028 to March 2029). Kyushu Electric said that the replacements would \u201cimprove reliability and generation efficiency.\u201d Kyushu Electric Power placed its\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.jaif.or.jp\/en\/news\/7332\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2025\/01\/24121302.jpg.webp\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2025\/01\/24121302.jpg.webp\" \/>\n\t\t<meta property=\"og:image:width\" content=\"900\" \/>\n\t\t<meta property=\"og:image:height\" content=\"627\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2025-01-09T01:55:29+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2025-01-16T07:02:02+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@Atoms_in_Japan\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Steam Turbines at Genkai-3 and -4 to Be Upgraded - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta name=\"twitter:description\" content=\"A steam generator (SG) comprises one high-pressure turbine and three low-pressure turbines. The upgrading work will be done at Unit 3 in FY27 (April 2027 to March 2028) and Unit 4 in FY28 (April 2028 to March 2029). Kyushu Electric said that the replacements would \u201cimprove reliability and generation efficiency.\u201d Kyushu Electric Power placed its\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2025\/01\/24121302.jpg.webp\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7332#blogposting\",\"name\":\"Steam Turbines at Genkai-3 and -4 to Be Upgraded - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"headline\":\"Steam Turbines at Genkai-3 and -4 to Be Upgraded\",\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/24121302.jpg.webp\",\"width\":900,\"height\":627,\"caption\":\"\\u00a9MITSUBISHI HEAVY INDUSTRIES, LTD.\"},\"datePublished\":\"2025-01-09T10:55:29+09:00\",\"dateModified\":\"2025-01-16T16:02:02+09:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7332#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7332#webpage\"},\"articleSection\":\"Industry, News, NPPs, Genkai-3, Genkai-4, Kyushu Electric Power, MHI, NRA, Steam Turbines, the Green Transformation (GX) Decarbonization Power Supply Bill\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7332#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"position\":2,\"name\":\"News\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"position\":3,\"name\":\"NPPs\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7332#listItem\",\"name\":\"Steam Turbines at Genkai-3 and -4 to Be Upgraded\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7332#listItem\",\"position\":4,\"name\":\"Steam Turbines at Genkai-3 and -4 to Be Upgraded\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno\",\"name\":\"Kaoru Ohno\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7332#webpage\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7332\",\"name\":\"Steam Turbines at Genkai-3 and -4 to Be Upgraded - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"description\":\"A steam generator (SG) comprises one high-pressure turbine and three low-pressure turbines. The upgrading work will be done at Unit 3 in FY27 (April 2027 to March 2028) and Unit 4 in FY28 (April 2028 to March 2029). Kyushu Electric said that the replacements would \\u201cimprove reliability and generation efficiency.\\u201d Kyushu Electric Power placed its\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7332#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/24121302.jpg.webp\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7332\\\/#mainImage\",\"width\":900,\"height\":627,\"caption\":\"\\u00a9MITSUBISHI HEAVY INDUSTRIES, LTD.\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7332#mainImage\"},\"datePublished\":\"2025-01-09T10:55:29+09:00\",\"dateModified\":\"2025-01-16T16:02:02+09:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Steam Turbines at Genkai-3 and -4 to Be Upgraded - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"A steam generator (SG) comprises one high-pressure turbine and three low-pressure turbines. The upgrading work will be done at Unit 3 in FY27 (April 2027 to March 2028) and Unit 4 in FY28 (April 2028 to March 2029). Kyushu Electric said that the replacements would \u201cimprove reliability and generation efficiency.\u201d Kyushu Electric Power placed its","canonical_url":"https:\/\/www.jaif.or.jp\/en\/news\/7332","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.jaif.or.jp\/en\/news\/7332#blogposting","name":"Steam Turbines at Genkai-3 and -4 to Be Upgraded - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","headline":"Steam Turbines at Genkai-3 and -4 to Be Upgraded","author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2025\/01\/24121302.jpg.webp","width":900,"height":627,"caption":"\u00a9MITSUBISHI HEAVY INDUSTRIES, LTD."},"datePublished":"2025-01-09T10:55:29+09:00","dateModified":"2025-01-16T16:02:02+09:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/7332#webpage"},"isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/7332#webpage"},"articleSection":"Industry, News, NPPs, Genkai-3, Genkai-4, Kyushu Electric Power, MHI, NRA, Steam Turbines, the Green Transformation (GX) Decarbonization Power Supply Bill"},{"@type":"BreadcrumbList","@id":"https:\/\/www.jaif.or.jp\/en\/news\/7332#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.jaif.or.jp\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","position":2,"name":"News","item":"https:\/\/www.jaif.or.jp\/en\/news","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","position":3,"name":"NPPs","item":"https:\/\/www.jaif.or.jp\/en\/news\/npps","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/7332#listItem","name":"Steam Turbines at Genkai-3 and -4 to Be Upgraded"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/7332#listItem","position":4,"name":"Steam Turbines at Genkai-3 and -4 to Be Upgraded","previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"}}]},{"@type":"Organization","@id":"https:\/\/www.jaif.or.jp\/en\/#organization","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","url":"https:\/\/www.jaif.or.jp\/en\/"},{"@type":"Person","@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author","url":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno","name":"Kaoru Ohno"},{"@type":"WebPage","@id":"https:\/\/www.jaif.or.jp\/en\/news\/7332#webpage","url":"https:\/\/www.jaif.or.jp\/en\/news\/7332","name":"Steam Turbines at Genkai-3 and -4 to Be Upgraded - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"A steam generator (SG) comprises one high-pressure turbine and three low-pressure turbines. The upgrading work will be done at Unit 3 in FY27 (April 2027 to March 2028) and Unit 4 in FY28 (April 2028 to March 2029). Kyushu Electric said that the replacements would \u201cimprove reliability and generation efficiency.\u201d Kyushu Electric Power placed its","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/7332#breadcrumblist"},"author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"creator":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2025\/01\/24121302.jpg.webp","@id":"https:\/\/www.jaif.or.jp\/en\/news\/7332\/#mainImage","width":900,"height":627,"caption":"\u00a9MITSUBISHI HEAVY INDUSTRIES, LTD."},"primaryImageOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/7332#mainImage"},"datePublished":"2025-01-09T10:55:29+09:00","dateModified":"2025-01-16T16:02:02+09:00"},{"@type":"WebSite","@id":"https:\/\/www.jaif.or.jp\/en\/#website","url":"https:\/\/www.jaif.or.jp\/en\/","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:type":"article","og:title":"Steam Turbines at Genkai-3 and -4 to Be Upgraded - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:description":"A steam generator (SG) comprises one high-pressure turbine and three low-pressure turbines. The upgrading work will be done at Unit 3 in FY27 (April 2027 to March 2028) and Unit 4 in FY28 (April 2028 to March 2029). Kyushu Electric said that the replacements would \u201cimprove reliability and generation efficiency.\u201d Kyushu Electric Power placed its","og:url":"https:\/\/www.jaif.or.jp\/en\/news\/7332","og:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2025\/01\/24121302.jpg.webp","og:image:secure_url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2025\/01\/24121302.jpg.webp","og:image:width":900,"og:image:height":627,"article:published_time":"2025-01-09T01:55:29+00:00","article:modified_time":"2025-01-16T07:02:02+00:00","twitter:card":"summary_large_image","twitter:site":"@Atoms_in_Japan","twitter:title":"Steam Turbines at Genkai-3 and -4 to Be Upgraded - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","twitter:description":"A steam generator (SG) comprises one high-pressure turbine and three low-pressure turbines. The upgrading work will be done at Unit 3 in FY27 (April 2027 to March 2028) and Unit 4 in FY28 (April 2028 to March 2029). Kyushu Electric said that the replacements would \u201cimprove reliability and generation efficiency.\u201d Kyushu Electric Power placed its","twitter:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2025\/01\/24121302.jpg.webp"},"aioseo_meta_data":{"post_id":"7332","title":null,"description":null,"keywords":[],"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":[],"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"limit_modified_date":false,"created":"2025-01-09 01:55:30","updated":"2026-10-29 02:40:55","focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\" title=\"News\">News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\/npps\" title=\"NPPs\">NPPs<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tSteam Turbines at Genkai-3 and -4 to Be Upgraded\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.jaif.or.jp\/en\/"},{"label":"News","link":"https:\/\/www.jaif.or.jp\/en\/news"},{"label":"NPPs","link":"https:\/\/www.jaif.or.jp\/en\/news\/npps"},{"label":"Steam Turbines at Genkai-3 and -4 to Be Upgraded","link":"https:\/\/www.jaif.or.jp\/en\/news\/7332"}],"_links":{"self":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/7332","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/comments?post=7332"}],"version-history":[{"count":1,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/7332\/revisions"}],"predecessor-version":[{"id":7334,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/7332\/revisions\/7334"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media\/7333"}],"wp:attachment":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media?parent=7332"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/categories?post=7332"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/tags?post=7332"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}