{"id":7560,"date":"2025-06-12T23:33:59","date_gmt":"2025-06-12T14:33:59","guid":{"rendered":"https:\/\/www.jaif.or.jp\/en\/?p=7560"},"modified":"2025-06-12T23:36:01","modified_gmt":"2025-06-12T14:36:01","slug":"tepco-begins-fuel-loading-at-kashiwazaki-kariwa-unit-6","status":"publish","type":"post","link":"https:\/\/www.jaif.or.jp\/en\/news\/7560","title":{"rendered":"TEPCO Begins Fuel Loading at Kashiwazaki Kariwa Unit 6"},"content":{"rendered":"<p>Unit 6 has undergone safety enhancement construction in compliance with the new regulatory standards and completed pre-operational operator inspections prior to fuel loading. The Nuclear Regulation Authority (NRA) granted approval on the same day. Additionally, during a regular press conference on May 22, Kashiwazaki Kariwa Site Director Takeyuki Inagaki reported that &#8220;Severe Accident Sequence Training&#8221; and &#8220;Extensive Damage Response Drill,&#8221; aimed at verifying the plant&#8217;s preparedness for severe accidents as stipulated in the company&#8217;s safety regulations, were conducted from May 13 to 15, and on May 21, respectively.<\/p>\n<p>The fuel loading process at Unit 6 involves inserting control rods and sequentially transferring 872 fuel assemblies individually from the spent fuel pool to the reactor using specialized equipment, a task expected to take approximately two weeks. This step positions Unit 6 to follow Unit 7 (ABWR, 1356 MWe), where preparations for restarting are already in an advanced technical phase. If progress continues smoothly, Unit 6 will be ready for restart as early as August.<\/p>\n<p>TEPCO has stated regarding the fuel loading, &#8220;If any issues or challenges are identified, we will pause operations and implement necessary measures.&#8221;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Unit 6 has undergone safety enhancement construction in compliance with the new regulatory standards and completed pre-operational operator inspections prior to fuel loading. The Nuclear Regulation Authority (NRA) granted approval on the same day. Additionally, during a regular press conference on May 22, Kashiwazaki Kariwa Site Director Takeyuki Inagaki reported that &#8220;Severe Accident Sequence Training&#8221; [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":7401,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1,6],"tags":[141,519,43,403,1216],"class_list":["post-7560","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-npps","tag-fuel-assemblies","tag-kashiwazaki","tag-kashiwazaki-kariwa","tag-kashiwazaki-kariwa-6","tag-restarrt"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/7560","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/comments?post=7560"}],"version-history":[{"count":1,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/7560\/revisions"}],"predecessor-version":[{"id":7561,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/7560\/revisions\/7561"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media\/7401"}],"wp:attachment":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media?parent=7560"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/categories?post=7560"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/tags?post=7560"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}