{"id":7599,"date":"2025-07-25T12:42:29","date_gmt":"2025-07-25T03:42:29","guid":{"rendered":"https:\/\/www.jaif.or.jp\/en\/?p=7599"},"modified":"2025-07-25T12:47:10","modified_gmt":"2025-07-25T03:47:10","slug":"hitachi-and-qst-succeed-in-fabricating-iter-divertor-component-prototype-pass-qualification-test","status":"publish","type":"post","link":"https:\/\/www.jaif.or.jp\/en\/news\/7599","title":{"rendered":"Hitachi and QST Succeed in Fabricating ITER Divertor Component Prototype, Pass Qualification Test"},"content":{"rendered":"<p data-start=\"455\" data-end=\"762\">The \u201cITER Project\u201d is an international collaboration among seven parties\u2014Japan, the EU, the U.S., Russia, South Korea, China, and India\u2014aimed at the scientific and technological demonstration of fusion energy. Construction of the experimental reactor is currently underway in Saint-Paul-l\u00e8s-Durance, France.<\/p>\n<p data-start=\"764\" data-end=\"1035\">Japan plays a central role in developing and manufacturing major components for ITER, including the divertor and toroidal field (TF) coils. As the designated domestic agency for the project, QST is responsible for coordinating the procurement of such components in Japan.<\/p>\n<p data-start=\"1037\" data-end=\"1474\">The divertor is one of the most critical components in tokamak-type fusion reactors employing magnetic confinement. It removes unburned fuel and helium \u201cash\u201d from the plasma to sustain stable fusion reactions. As the only in-vessel component that directly contacts the plasma, the divertor is exposed to extremely high temperatures and particle loads, making it one of the most technically challenging components to manufacture for ITER.<\/p>\n<p data-start=\"1476\" data-end=\"1951\">Drawing on its long-standing expertise in nuclear technology, Hitachi developed advanced welding and non-destructive inspection techniques for specialized high-performance materials. Through rigorous validation, the company achieved mechanical machining and assembly accuracy within 0.5 mm, as required by the ITER Organization. Hitachi also developed a dedicated automated welding system optimized for the divertor to enhance manufacturing efficiency and cost-effectiveness.<\/p>\n<p data-start=\"1953\" data-end=\"2186\">In July 2024, <a href=\"https:\/\/www.jaif.or.jp\/en\/news\/7165\" target=\"_blank\" rel=\"noopener\">Mitsubishi Heavy Industries had already completed the first divertor prototype unit<\/a> in collaboration with QST. With this latest achievement, Hitachi\u2019s manufacturing capabilities have now also been officially recognized.<\/p>\n<p data-start=\"2188\" data-end=\"2421\">QST is expected to deliver a total of 58 outer vertical targets (OVT) for ITER. Of these, 18 are to be manufactured by the initial contractor, while production of the remaining 40 will be assigned to other manufacturers yet to be selected.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The \u201cITER Project\u201d is an international collaboration among seven parties\u2014Japan, the EU, the U.S., Russia, South Korea, China, and India\u2014aimed at the scientific and technological demonstration of fusion energy. Construction of the experimental reactor is currently underway in Saint-Paul-l\u00e8s-Durance, France. Japan plays a central role in developing and manufacturing major components for ITER, including the [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":7600,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9,1,1250],"tags":[550,998,298,654,189,1178,483],"class_list":["post-7599","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry","category-news","category-rd","tag-fusion","tag-fusion-energy","tag-hitachi","tag-iter","tag-mhi","tag-ovt","tag-qst"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.5.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"The \u201cITER Project\u201d is an international collaboration among seven parties\u2014Japan, the EU, the U.S., Russia, South Korea, China, and India\u2014aimed at the scientific and technological demonstration of fusion energy. Construction of the experimental reactor is currently underway in Saint-Paul-l\u00e8s-Durance, France. Japan plays a central role in developing and manufacturing major components for ITER, including the\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Kaoru Ohno\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.jaif.or.jp\/en\/news\/7599\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.5.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Hitachi and QST Succeed in Fabricating ITER Divertor Component Prototype, Pass Qualification Test - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:description\" content=\"The \u201cITER Project\u201d is an international collaboration among seven parties\u2014Japan, the EU, the U.S., Russia, South Korea, China, and India\u2014aimed at the scientific and technological demonstration of fusion energy. Construction of the experimental reactor is currently underway in Saint-Paul-l\u00e8s-Durance, France. Japan plays a central role in developing and manufacturing major components for ITER, including the\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.jaif.or.jp\/en\/news\/7599\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2025\/07\/Hitachi_OVT_QST.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2025\/07\/Hitachi_OVT_QST.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1500\" \/>\n\t\t<meta property=\"og:image:height\" content=\"1038\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2025-07-25T03:42:29+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2025-07-25T03:47:10+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@Atoms_in_Japan\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Hitachi and QST Succeed in Fabricating ITER Divertor Component Prototype, Pass Qualification Test - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta name=\"twitter:description\" content=\"The \u201cITER Project\u201d is an international collaboration among seven parties\u2014Japan, the EU, the U.S., Russia, South Korea, China, and India\u2014aimed at the scientific and technological demonstration of fusion energy. Construction of the experimental reactor is currently underway in Saint-Paul-l\u00e8s-Durance, France. Japan plays a central role in developing and manufacturing major components for ITER, including the\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2025\/07\/Hitachi_OVT_QST.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7599#blogposting\",\"name\":\"Hitachi and QST Succeed in Fabricating ITER Divertor Component Prototype, Pass Qualification Test - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"headline\":\"Hitachi and QST Succeed in Fabricating ITER Divertor Component Prototype, Pass Qualification Test\",\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/Hitachi_OVT_QST.jpg\",\"width\":1500,\"height\":1038,\"caption\":\"Exterior view of the second prototype unit of the outer vertical target (OVT) \\u00a9Hitachi, Ltd.\"},\"datePublished\":\"2025-07-25T12:42:29+09:00\",\"dateModified\":\"2025-07-25T12:47:10+09:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7599#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7599#webpage\"},\"articleSection\":\"Industry, News, R&amp;D, fusion, Fusion Energy, Hitachi, ITER, MHI, OVT, QST\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7599#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"position\":2,\"name\":\"News\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/industry#listItem\",\"name\":\"Industry\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/industry#listItem\",\"position\":3,\"name\":\"Industry\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/industry\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7599#listItem\",\"name\":\"Hitachi and QST Succeed in Fabricating ITER Divertor Component Prototype, Pass Qualification Test\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7599#listItem\",\"position\":4,\"name\":\"Hitachi and QST Succeed in Fabricating ITER Divertor Component Prototype, Pass Qualification Test\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/industry#listItem\",\"name\":\"Industry\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno\",\"name\":\"Kaoru Ohno\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7599#webpage\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7599\",\"name\":\"Hitachi and QST Succeed in Fabricating ITER Divertor Component Prototype, Pass Qualification Test - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"description\":\"The \\u201cITER Project\\u201d is an international collaboration among seven parties\\u2014Japan, the EU, the U.S., Russia, South Korea, China, and India\\u2014aimed at the scientific and technological demonstration of fusion energy. Construction of the experimental reactor is currently underway in Saint-Paul-l\\u00e8s-Durance, France. Japan plays a central role in developing and manufacturing major components for ITER, including the\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7599#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/Hitachi_OVT_QST.jpg\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7599\\\/#mainImage\",\"width\":1500,\"height\":1038,\"caption\":\"Exterior view of the second prototype unit of the outer vertical target (OVT) \\u00a9Hitachi, Ltd.\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7599#mainImage\"},\"datePublished\":\"2025-07-25T12:42:29+09:00\",\"dateModified\":\"2025-07-25T12:47:10+09:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Hitachi and QST Succeed in Fabricating ITER Divertor Component Prototype, Pass Qualification Test - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"The \u201cITER Project\u201d is an international collaboration among seven parties\u2014Japan, the EU, the U.S., Russia, South Korea, China, and India\u2014aimed at the scientific and technological demonstration of fusion energy. Construction of the experimental reactor is currently underway in Saint-Paul-l\u00e8s-Durance, France. Japan plays a central role in developing and manufacturing major components for ITER, including the","canonical_url":"https:\/\/www.jaif.or.jp\/en\/news\/7599","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.jaif.or.jp\/en\/news\/7599#blogposting","name":"Hitachi and QST Succeed in Fabricating ITER Divertor Component Prototype, Pass Qualification Test - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","headline":"Hitachi and QST Succeed in Fabricating ITER Divertor Component Prototype, Pass Qualification Test","author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2025\/07\/Hitachi_OVT_QST.jpg","width":1500,"height":1038,"caption":"Exterior view of the second prototype unit of the outer vertical target (OVT) \u00a9Hitachi, Ltd."},"datePublished":"2025-07-25T12:42:29+09:00","dateModified":"2025-07-25T12:47:10+09:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/7599#webpage"},"isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/7599#webpage"},"articleSection":"Industry, News, R&amp;D, fusion, Fusion Energy, Hitachi, ITER, MHI, OVT, QST"},{"@type":"BreadcrumbList","@id":"https:\/\/www.jaif.or.jp\/en\/news\/7599#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.jaif.or.jp\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","position":2,"name":"News","item":"https:\/\/www.jaif.or.jp\/en\/news","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/industry#listItem","name":"Industry"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/industry#listItem","position":3,"name":"Industry","item":"https:\/\/www.jaif.or.jp\/en\/news\/industry","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/7599#listItem","name":"Hitachi and QST Succeed in Fabricating ITER Divertor Component Prototype, Pass Qualification Test"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/7599#listItem","position":4,"name":"Hitachi and QST Succeed in Fabricating ITER Divertor Component Prototype, Pass Qualification Test","previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/industry#listItem","name":"Industry"}}]},{"@type":"Organization","@id":"https:\/\/www.jaif.or.jp\/en\/#organization","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","url":"https:\/\/www.jaif.or.jp\/en\/"},{"@type":"Person","@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author","url":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno","name":"Kaoru Ohno"},{"@type":"WebPage","@id":"https:\/\/www.jaif.or.jp\/en\/news\/7599#webpage","url":"https:\/\/www.jaif.or.jp\/en\/news\/7599","name":"Hitachi and QST Succeed in Fabricating ITER Divertor Component Prototype, Pass Qualification Test - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"The \u201cITER Project\u201d is an international collaboration among seven parties\u2014Japan, the EU, the U.S., Russia, South Korea, China, and India\u2014aimed at the scientific and technological demonstration of fusion energy. Construction of the experimental reactor is currently underway in Saint-Paul-l\u00e8s-Durance, France. Japan plays a central role in developing and manufacturing major components for ITER, including the","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/7599#breadcrumblist"},"author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"creator":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2025\/07\/Hitachi_OVT_QST.jpg","@id":"https:\/\/www.jaif.or.jp\/en\/news\/7599\/#mainImage","width":1500,"height":1038,"caption":"Exterior view of the second prototype unit of the outer vertical target (OVT) \u00a9Hitachi, Ltd."},"primaryImageOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/7599#mainImage"},"datePublished":"2025-07-25T12:42:29+09:00","dateModified":"2025-07-25T12:47:10+09:00"},{"@type":"WebSite","@id":"https:\/\/www.jaif.or.jp\/en\/#website","url":"https:\/\/www.jaif.or.jp\/en\/","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:type":"article","og:title":"Hitachi and QST Succeed in Fabricating ITER Divertor Component Prototype, Pass Qualification Test - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:description":"The \u201cITER Project\u201d is an international collaboration among seven parties\u2014Japan, the EU, the U.S., Russia, South Korea, China, and India\u2014aimed at the scientific and technological demonstration of fusion energy. Construction of the experimental reactor is currently underway in Saint-Paul-l\u00e8s-Durance, France. Japan plays a central role in developing and manufacturing major components for ITER, including the","og:url":"https:\/\/www.jaif.or.jp\/en\/news\/7599","og:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2025\/07\/Hitachi_OVT_QST.jpg","og:image:secure_url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2025\/07\/Hitachi_OVT_QST.jpg","og:image:width":1500,"og:image:height":1038,"article:published_time":"2025-07-25T03:42:29+00:00","article:modified_time":"2025-07-25T03:47:10+00:00","twitter:card":"summary_large_image","twitter:site":"@Atoms_in_Japan","twitter:title":"Hitachi and QST Succeed in Fabricating ITER Divertor Component Prototype, Pass Qualification Test - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","twitter:description":"The \u201cITER Project\u201d is an international collaboration among seven parties\u2014Japan, the EU, the U.S., Russia, South Korea, China, and India\u2014aimed at the scientific and technological demonstration of fusion energy. Construction of the experimental reactor is currently underway in Saint-Paul-l\u00e8s-Durance, France. Japan plays a central role in developing and manufacturing major components for ITER, including the","twitter:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2025\/07\/Hitachi_OVT_QST.jpg"},"aioseo_meta_data":{"post_id":"7599","title":null,"description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"limit_modified_date":false,"created":"2025-07-25 03:41:43","updated":"2026-10-29 02:53:00","focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\" title=\"News\">News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\/industry\" title=\"Industry\">Industry<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tHitachi and QST Succeed in Fabricating ITER Divertor Component Prototype, Pass Qualification Test\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.jaif.or.jp\/en\/"},{"label":"News","link":"https:\/\/www.jaif.or.jp\/en\/news"},{"label":"Industry","link":"https:\/\/www.jaif.or.jp\/en\/news\/industry"},{"label":"Hitachi and QST Succeed in Fabricating ITER Divertor Component Prototype, Pass Qualification Test","link":"https:\/\/www.jaif.or.jp\/en\/news\/7599"}],"_links":{"self":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/7599","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/comments?post=7599"}],"version-history":[{"count":2,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/7599\/revisions"}],"predecessor-version":[{"id":7602,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/7599\/revisions\/7602"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media\/7600"}],"wp:attachment":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media?parent=7599"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/categories?post=7599"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/tags?post=7599"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}