{"id":7641,"date":"2025-09-10T15:45:58","date_gmt":"2025-09-10T06:45:58","guid":{"rendered":"https:\/\/www.jaif.or.jp\/en\/?p=7641"},"modified":"2025-09-10T16:06:44","modified_gmt":"2025-09-10T07:06:44","slug":"chugoku-electric-power-determines-kaminoseki-site-feasible-for-interim-storage-facility","status":"publish","type":"post","link":"https:\/\/www.jaif.or.jp\/en\/news\/7641","title":{"rendered":"Chugoku Electric Power Determines Kaminoseki Site Feasible for Interim Storage Facility"},"content":{"rendered":"<p data-start=\"486\" data-end=\"777\">The power company had received a request from the mayor in February 2023 to consider regional development measures. In response, since August 2023, it has been conducting studies and assessments for installing a dry-storage type interim storage facility on its premises in Nagashima, Kaminoseki.<\/p>\n<p data-start=\"779\" data-end=\"1092\">A major focus of the study was the ground conditions. If an active fault with potential future activity were located directly beneath the facility, it would be technically difficult to construct an interim storage facility. Accordingly, the company carried out detailed investigations, including boring surveys.<\/p>\n<p data-start=\"1094\" data-end=\"1565\">Based on objective data obtained from these surveys, the analysis confirmed the presence of three major active faults within a roughly 30 km radius on land and 35 active faults in the surrounding sea area. However, the company judged that the facility could be made viable by appropriately reflecting these findings in seismic design and other measures. The bedrock beneath the site was also confirmed to be suitable for the construction of an interim storage facility.<\/p>\n<p data-start=\"1567\" data-end=\"1943\">In addition, surveys of the surrounding natural environment\u2014including weather, volcanic activity, hydrology, and ecosystems\u2014as well as the social environment such as industrial activity and traffic conditions, confirmed that construction of the facility would not have adverse impacts. Thus, the study concluded that \u201cthere are no technical issues that cannot be addressed.\u201d<\/p>\n<p data-start=\"1945\" data-end=\"2324\">The company now plans to formulate a business plan covering the scale of the facility and the start of construction. If launched, the project would become Japan\u2019s second off-site interim spent fuel storage facility, following the Recyclable-Fuel Storage Center in Mutsu City, Aomori Prefecture. The Kaminoseki facility is planned for joint operation with Kansai Electric Power.<\/p>\n<p data-start=\"2326\" data-end=\"2486\">On its website, Chugoku Electric Power stated, \u201cWe will work to communicate the survey results clearly to local residents in order to further deepen understanding.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The power company had received a request from the mayor in February 2023 to consider regional development measures. In response, since August 2023, it has been conducting studies and assessments for installing a dry-storage type interim storage facility on its premises in Nagashima, Kaminoseki. A major focus of the study was the ground conditions. If [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1,6],"tags":[1364,558,41,1365,1198,125],"class_list":["post-7641","post","type-post","status-publish","format-standard","hentry","category-news","category-npps","tag-chugoku-electric-power","tag-dry-storage","tag-interim-storage","tag-kaminoseki","tag-nuclear-fuel-cycle","tag-spent-fuel"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.4 - aioseo.com -->\n\t<meta name=\"description\" content=\"The power company had received a request from the mayor in February 2023 to consider regional development measures. In response, since August 2023, it has been conducting studies and assessments for installing a dry-storage type interim storage facility on its premises in Nagashima, Kaminoseki. A major focus of the study was the ground conditions. If\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Kaoru Ohno\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.jaif.or.jp\/en\/news\/7641\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.4\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Chugoku Electric Power Determines Kaminoseki Site Feasible for Interim Storage Facility - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:description\" content=\"The power company had received a request from the mayor in February 2023 to consider regional development measures. In response, since August 2023, it has been conducting studies and assessments for installing a dry-storage type interim storage facility on its premises in Nagashima, Kaminoseki. A major focus of the study was the ground conditions. If\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.jaif.or.jp\/en\/news\/7641\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2022\/04\/dummy-scaled.webp\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2022\/04\/dummy-scaled.webp\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2025-09-10T06:45:58+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2025-09-10T07:06:44+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@Atoms_in_Japan\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Chugoku Electric Power Determines Kaminoseki Site Feasible for Interim Storage Facility - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta name=\"twitter:description\" content=\"The power company had received a request from the mayor in February 2023 to consider regional development measures. In response, since August 2023, it has been conducting studies and assessments for installing a dry-storage type interim storage facility on its premises in Nagashima, Kaminoseki. A major focus of the study was the ground conditions. If\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2022\/04\/dummy-scaled.webp\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7641#blogposting\",\"name\":\"Chugoku Electric Power Determines Kaminoseki Site Feasible for Interim Storage Facility - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"headline\":\"Chugoku Electric Power Determines Kaminoseki Site Feasible for Interim Storage Facility\",\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"},\"datePublished\":\"2025-09-10T15:45:58+09:00\",\"dateModified\":\"2025-09-10T16:06:44+09:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7641#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7641#webpage\"},\"articleSection\":\"News, NPPs, Chugoku Electric Power, dry storage, interim storage, Kaminoseki, Nuclear Fuel Cycle, spent fuel\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7641#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"position\":2,\"name\":\"News\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"position\":3,\"name\":\"NPPs\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7641#listItem\",\"name\":\"Chugoku Electric Power Determines Kaminoseki Site Feasible for Interim Storage Facility\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7641#listItem\",\"position\":4,\"name\":\"Chugoku Electric Power Determines Kaminoseki Site Feasible for Interim Storage Facility\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno\",\"name\":\"Kaoru Ohno\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7641#webpage\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7641\",\"name\":\"Chugoku Electric Power Determines Kaminoseki Site Feasible for Interim Storage Facility - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"description\":\"The power company had received a request from the mayor in February 2023 to consider regional development measures. In response, since August 2023, it has been conducting studies and assessments for installing a dry-storage type interim storage facility on its premises in Nagashima, Kaminoseki. A major focus of the study was the ground conditions. If\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7641#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"datePublished\":\"2025-09-10T15:45:58+09:00\",\"dateModified\":\"2025-09-10T16:06:44+09:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Chugoku Electric Power Determines Kaminoseki Site Feasible for Interim Storage Facility - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"The power company had received a request from the mayor in February 2023 to consider regional development measures. In response, since August 2023, it has been conducting studies and assessments for installing a dry-storage type interim storage facility on its premises in Nagashima, Kaminoseki. A major focus of the study was the ground conditions. If","canonical_url":"https:\/\/www.jaif.or.jp\/en\/news\/7641","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.jaif.or.jp\/en\/news\/7641#blogposting","name":"Chugoku Electric Power Determines Kaminoseki Site Feasible for Interim Storage Facility - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","headline":"Chugoku Electric Power Determines Kaminoseki Site Feasible for Interim Storage Facility","author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"},"datePublished":"2025-09-10T15:45:58+09:00","dateModified":"2025-09-10T16:06:44+09:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/7641#webpage"},"isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/7641#webpage"},"articleSection":"News, NPPs, Chugoku Electric Power, dry storage, interim storage, Kaminoseki, Nuclear Fuel Cycle, spent fuel"},{"@type":"BreadcrumbList","@id":"https:\/\/www.jaif.or.jp\/en\/news\/7641#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.jaif.or.jp\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","position":2,"name":"News","item":"https:\/\/www.jaif.or.jp\/en\/news","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","position":3,"name":"NPPs","item":"https:\/\/www.jaif.or.jp\/en\/news\/npps","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/7641#listItem","name":"Chugoku Electric Power Determines Kaminoseki Site Feasible for Interim Storage Facility"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/7641#listItem","position":4,"name":"Chugoku Electric Power Determines Kaminoseki Site Feasible for Interim Storage Facility","previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"}}]},{"@type":"Organization","@id":"https:\/\/www.jaif.or.jp\/en\/#organization","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","url":"https:\/\/www.jaif.or.jp\/en\/"},{"@type":"Person","@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author","url":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno","name":"Kaoru Ohno"},{"@type":"WebPage","@id":"https:\/\/www.jaif.or.jp\/en\/news\/7641#webpage","url":"https:\/\/www.jaif.or.jp\/en\/news\/7641","name":"Chugoku Electric Power Determines Kaminoseki Site Feasible for Interim Storage Facility - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"The power company had received a request from the mayor in February 2023 to consider regional development measures. In response, since August 2023, it has been conducting studies and assessments for installing a dry-storage type interim storage facility on its premises in Nagashima, Kaminoseki. A major focus of the study was the ground conditions. If","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/7641#breadcrumblist"},"author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"creator":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"datePublished":"2025-09-10T15:45:58+09:00","dateModified":"2025-09-10T16:06:44+09:00"},{"@type":"WebSite","@id":"https:\/\/www.jaif.or.jp\/en\/#website","url":"https:\/\/www.jaif.or.jp\/en\/","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:type":"article","og:title":"Chugoku Electric Power Determines Kaminoseki Site Feasible for Interim Storage Facility - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:description":"The power company had received a request from the mayor in February 2023 to consider regional development measures. In response, since August 2023, it has been conducting studies and assessments for installing a dry-storage type interim storage facility on its premises in Nagashima, Kaminoseki. A major focus of the study was the ground conditions. If","og:url":"https:\/\/www.jaif.or.jp\/en\/news\/7641","og:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2022\/04\/dummy-scaled.webp","og:image:secure_url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2022\/04\/dummy-scaled.webp","article:published_time":"2025-09-10T06:45:58+00:00","article:modified_time":"2025-09-10T07:06:44+00:00","twitter:card":"summary_large_image","twitter:site":"@Atoms_in_Japan","twitter:title":"Chugoku Electric Power Determines Kaminoseki Site Feasible for Interim Storage Facility - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","twitter:description":"The power company had received a request from the mayor in February 2023 to consider regional development measures. In response, since August 2023, it has been conducting studies and assessments for installing a dry-storage type interim storage facility on its premises in Nagashima, Kaminoseki. A major focus of the study was the ground conditions. If","twitter:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2022\/04\/dummy-scaled.webp"},"aioseo_meta_data":{"post_id":"7641","title":null,"description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"limit_modified_date":false,"created":"2025-09-10 06:45:58","updated":"2026-10-29 02:54:54","focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\" title=\"News\">News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\/npps\" title=\"NPPs\">NPPs<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tChugoku Electric Power Determines Kaminoseki Site Feasible for Interim Storage Facility\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.jaif.or.jp\/en\/"},{"label":"News","link":"https:\/\/www.jaif.or.jp\/en\/news"},{"label":"NPPs","link":"https:\/\/www.jaif.or.jp\/en\/news\/npps"},{"label":"Chugoku Electric Power Determines Kaminoseki Site Feasible for Interim Storage Facility","link":"https:\/\/www.jaif.or.jp\/en\/news\/7641"}],"_links":{"self":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/7641","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/comments?post=7641"}],"version-history":[{"count":1,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/7641\/revisions"}],"predecessor-version":[{"id":7642,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/7641\/revisions\/7642"}],"wp:attachment":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media?parent=7641"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/categories?post=7641"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/tags?post=7641"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}