{"id":7803,"date":"2026-04-17T16:22:02","date_gmt":"2026-04-17T07:22:02","guid":{"rendered":"https:\/\/www.jaif.or.jp\/en\/?p=7803"},"modified":"2026-04-20T11:35:08","modified_gmt":"2026-04-20T02:35:08","slug":"kashiwazaki-kariwa-unit-6-enters-commercial-operation-for-the-first-time-in-14-years","status":"publish","type":"post","link":"https:\/\/www.jaif.or.jp\/en\/news\/7803","title":{"rendered":"Kashiwazaki Kariwa Unit 6 Enters Commercial Operation for the First Time in 14 Years"},"content":{"rendered":"<p data-start=\"672\" data-end=\"1050\">The comprehensive load performance test is carried out at the final stage of the pre-service operator inspection, once the reactor reaches its rated thermal output and stable operating conditions are achieved. During the test, key parameters such as reactor pressure, steam flow rate, and thermal output are recorded to verify the overall performance and integrity of the plant.<\/p>\n<p data-start=\"1052\" data-end=\"1373\">In parallel, the Nuclear Regulation Authority conducted its pre-service inspection to confirm that the operator\u2019s inspections had been properly implemented. Based on these results, no issues were identified, and the Authority issued the pre-service inspection certificate, allowing the transition to commercial operation.<\/p>\n<p data-start=\"1375\" data-end=\"1806\">Speaking at a press conference on April 14, Minister of Economy, Trade and Industry AKAZAWA Ryosei emphasized the significance of restarting Unit 6, stating that it is \u201cextremely important from the perspectives of alleviating the vulnerability of electricity supply in eastern Japan, curbing electricity costs, and securing decarbonized power sources.\u201d He described the restart as \u201ca major milestone and an important step forward.\u201d<\/p>\n<p data-start=\"1808\" data-end=\"2026\">In light of heightened tensions in the Middle East, the minister also reiterated that nuclear power is \u201ca decarbonized power source that contributes to energy security,\u201d underscoring the importance of reactor restarts.<\/p>\n<p data-start=\"2028\" data-end=\"2354\" data-is-last-node=\"\" data-is-only-node=\"\">He further noted that the restart of Unit 6 is expected to reduce Japan\u2019s annual LNG imports via the Strait of Hormuz by approximately 30%. Looking ahead to growing electricity demand, he reaffirmed that there is no change to the policy outlined in the Strategic Energy Plan to utilize both nuclear power and renewable energy.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The comprehensive load performance test is carried out at the final stage of the pre-service operator inspection, once the reactor reaches its rated thermal output and stable operating conditions are achieved. During the test, key parameters such as reactor pressure, steam flow rate, and thermal output are recorded to verify the overall performance and integrity [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":7805,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9,1,6],"tags":[376,995,1447,1300,519,568,1184,19,313,18,23],"class_list":["post-7803","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry","category-news","category-npps","tag-abwr","tag-commercial-operation","tag-inspection","tag-kariwa","tag-kashiwazaki","tag-niigata","tag-niigata-prefecture","tag-nra","tag-pre-service-inspection","tag-restart","tag-tepco"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.4 - aioseo.com -->\n\t<meta name=\"description\" content=\"The comprehensive load performance test is carried out at the final stage of the pre-service operator inspection, once the reactor reaches its rated thermal output and stable operating conditions are achieved. During the test, key parameters such as reactor pressure, steam flow rate, and thermal output are recorded to verify the overall performance and integrity\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Kaoru Ohno\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.jaif.or.jp\/en\/news\/7803\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.4\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Kashiwazaki Kariwa Unit 6 Enters Commercial Operation for the First Time in 14 Years - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:description\" content=\"The comprehensive load performance test is carried out at the final stage of the pre-service operator inspection, once the reactor reaches its rated thermal output and stable operating conditions are achieved. During the test, key parameters such as reactor pressure, steam flow rate, and thermal output are recorded to verify the overall performance and integrity\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.jaif.or.jp\/en\/news\/7803\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2026\/04\/HGAYL3UbgAAzJ6m.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2026\/04\/HGAYL3UbgAAzJ6m.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-04-17T07:22:02+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-04-20T02:35:08+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@Atoms_in_Japan\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Kashiwazaki Kariwa Unit 6 Enters Commercial Operation for the First Time in 14 Years - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta name=\"twitter:description\" content=\"The comprehensive load performance test is carried out at the final stage of the pre-service operator inspection, once the reactor reaches its rated thermal output and stable operating conditions are achieved. During the test, key parameters such as reactor pressure, steam flow rate, and thermal output are recorded to verify the overall performance and integrity\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2026\/04\/HGAYL3UbgAAzJ6m.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7803#blogposting\",\"name\":\"Kashiwazaki Kariwa Unit 6 Enters Commercial Operation for the First Time in 14 Years - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"headline\":\"Kashiwazaki Kariwa Unit 6 Enters Commercial Operation for the First Time in 14 Years\",\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/HGAYL3UbgAAzJ6m.jpg\",\"width\":1200,\"height\":800,\"caption\":\"Comprehensive load performance test in progress \\u00a9TEPCO\"},\"datePublished\":\"2026-04-17T16:22:02+09:00\",\"dateModified\":\"2026-04-20T11:35:08+09:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7803#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7803#webpage\"},\"articleSection\":\"Industry, News, NPPs, ABWR, commercial operation, inspection, kariwa, Kashiwazaki, Niigata, Niigata Prefecture, NRA, pre-service inspection, restart, TEPCO\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7803#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"position\":2,\"name\":\"News\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"position\":3,\"name\":\"NPPs\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7803#listItem\",\"name\":\"Kashiwazaki Kariwa Unit 6 Enters Commercial Operation for the First Time in 14 Years\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7803#listItem\",\"position\":4,\"name\":\"Kashiwazaki Kariwa Unit 6 Enters Commercial Operation for the First Time in 14 Years\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno\",\"name\":\"Kaoru Ohno\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7803#webpage\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7803\",\"name\":\"Kashiwazaki Kariwa Unit 6 Enters Commercial Operation for the First Time in 14 Years - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"description\":\"The comprehensive load performance test is carried out at the final stage of the pre-service operator inspection, once the reactor reaches its rated thermal output and stable operating conditions are achieved. During the test, key parameters such as reactor pressure, steam flow rate, and thermal output are recorded to verify the overall performance and integrity\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7803#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/HGAYL3UbgAAzJ6m.jpg\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7803\\\/#mainImage\",\"width\":1200,\"height\":800,\"caption\":\"Comprehensive load performance test in progress \\u00a9TEPCO\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/7803#mainImage\"},\"datePublished\":\"2026-04-17T16:22:02+09:00\",\"dateModified\":\"2026-04-20T11:35:08+09:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Kashiwazaki Kariwa Unit 6 Enters Commercial Operation for the First Time in 14 Years - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"The comprehensive load performance test is carried out at the final stage of the pre-service operator inspection, once the reactor reaches its rated thermal output and stable operating conditions are achieved. During the test, key parameters such as reactor pressure, steam flow rate, and thermal output are recorded to verify the overall performance and integrity","canonical_url":"https:\/\/www.jaif.or.jp\/en\/news\/7803","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.jaif.or.jp\/en\/news\/7803#blogposting","name":"Kashiwazaki Kariwa Unit 6 Enters Commercial Operation for the First Time in 14 Years - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","headline":"Kashiwazaki Kariwa Unit 6 Enters Commercial Operation for the First Time in 14 Years","author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2026\/04\/HGAYL3UbgAAzJ6m.jpg","width":1200,"height":800,"caption":"Comprehensive load performance test in progress \u00a9TEPCO"},"datePublished":"2026-04-17T16:22:02+09:00","dateModified":"2026-04-20T11:35:08+09:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/7803#webpage"},"isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/7803#webpage"},"articleSection":"Industry, News, NPPs, ABWR, commercial operation, inspection, kariwa, Kashiwazaki, Niigata, Niigata Prefecture, NRA, pre-service inspection, restart, TEPCO"},{"@type":"BreadcrumbList","@id":"https:\/\/www.jaif.or.jp\/en\/news\/7803#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.jaif.or.jp\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","position":2,"name":"News","item":"https:\/\/www.jaif.or.jp\/en\/news","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","position":3,"name":"NPPs","item":"https:\/\/www.jaif.or.jp\/en\/news\/npps","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/7803#listItem","name":"Kashiwazaki Kariwa Unit 6 Enters Commercial Operation for the First Time in 14 Years"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/7803#listItem","position":4,"name":"Kashiwazaki Kariwa Unit 6 Enters Commercial Operation for the First Time in 14 Years","previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"}}]},{"@type":"Organization","@id":"https:\/\/www.jaif.or.jp\/en\/#organization","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","url":"https:\/\/www.jaif.or.jp\/en\/"},{"@type":"Person","@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author","url":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno","name":"Kaoru Ohno"},{"@type":"WebPage","@id":"https:\/\/www.jaif.or.jp\/en\/news\/7803#webpage","url":"https:\/\/www.jaif.or.jp\/en\/news\/7803","name":"Kashiwazaki Kariwa Unit 6 Enters Commercial Operation for the First Time in 14 Years - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"The comprehensive load performance test is carried out at the final stage of the pre-service operator inspection, once the reactor reaches its rated thermal output and stable operating conditions are achieved. During the test, key parameters such as reactor pressure, steam flow rate, and thermal output are recorded to verify the overall performance and integrity","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/7803#breadcrumblist"},"author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"creator":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2026\/04\/HGAYL3UbgAAzJ6m.jpg","@id":"https:\/\/www.jaif.or.jp\/en\/news\/7803\/#mainImage","width":1200,"height":800,"caption":"Comprehensive load performance test in progress \u00a9TEPCO"},"primaryImageOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/7803#mainImage"},"datePublished":"2026-04-17T16:22:02+09:00","dateModified":"2026-04-20T11:35:08+09:00"},{"@type":"WebSite","@id":"https:\/\/www.jaif.or.jp\/en\/#website","url":"https:\/\/www.jaif.or.jp\/en\/","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:type":"article","og:title":"Kashiwazaki Kariwa Unit 6 Enters Commercial Operation for the First Time in 14 Years - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:description":"The comprehensive load performance test is carried out at the final stage of the pre-service operator inspection, once the reactor reaches its rated thermal output and stable operating conditions are achieved. During the test, key parameters such as reactor pressure, steam flow rate, and thermal output are recorded to verify the overall performance and integrity","og:url":"https:\/\/www.jaif.or.jp\/en\/news\/7803","og:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2026\/04\/HGAYL3UbgAAzJ6m.jpg","og:image:secure_url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2026\/04\/HGAYL3UbgAAzJ6m.jpg","og:image:width":1200,"og:image:height":800,"article:published_time":"2026-04-17T07:22:02+00:00","article:modified_time":"2026-04-20T02:35:08+00:00","twitter:card":"summary_large_image","twitter:site":"@Atoms_in_Japan","twitter:title":"Kashiwazaki Kariwa Unit 6 Enters Commercial Operation for the First Time in 14 Years - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","twitter:description":"The comprehensive load performance test is carried out at the final stage of the pre-service operator inspection, once the reactor reaches its rated thermal output and stable operating conditions are achieved. During the test, key parameters such as reactor pressure, steam flow rate, and thermal output are recorded to verify the overall performance and integrity","twitter:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2026\/04\/HGAYL3UbgAAzJ6m.jpg"},"aioseo_meta_data":{"post_id":"7803","title":null,"description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"limit_modified_date":false,"created":"2026-04-17 07:17:45","updated":"2026-10-29 03:01:45","focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\" title=\"News\">News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\/npps\" title=\"NPPs\">NPPs<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tKashiwazaki Kariwa Unit 6 Enters Commercial Operation for the First Time in 14 Years\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.jaif.or.jp\/en\/"},{"label":"News","link":"https:\/\/www.jaif.or.jp\/en\/news"},{"label":"NPPs","link":"https:\/\/www.jaif.or.jp\/en\/news\/npps"},{"label":"Kashiwazaki Kariwa Unit 6 Enters Commercial Operation for the First Time in 14 Years","link":"https:\/\/www.jaif.or.jp\/en\/news\/7803"}],"_links":{"self":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/7803","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/comments?post=7803"}],"version-history":[{"count":2,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/7803\/revisions"}],"predecessor-version":[{"id":7806,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/7803\/revisions\/7806"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media\/7805"}],"wp:attachment":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media?parent=7803"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/categories?post=7803"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/tags?post=7803"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}