{"id":7842,"date":"2026-05-12T15:37:09","date_gmt":"2026-05-12T06:37:09","guid":{"rendered":"https:\/\/www.jaif.or.jp\/en\/?p=7842"},"modified":"2026-05-12T15:59:55","modified_gmt":"2026-05-12T06:59:55","slug":"japans-nuclear-capacity-factor-reaches-33-6-in-fy2025","status":"publish","type":"post","link":"https:\/\/www.jaif.or.jp\/en\/news\/npps\/7842","title":{"rendered":"Japan\u2019s Nuclear Capacity Factor Reaches 33.6% in FY2025"},"content":{"rendered":"<p data-start=\"424\" data-end=\"582\">Both figures marked the highest levels recorded since FY2015, when Japan\u2019s new regulatory standards came into effect following the Fukushima Daiichi accident.<\/p>\n<p data-start=\"584\" data-end=\"846\">In FY2025, TEPCO\u2019s Kashiwazaki Kariwa-6 resumed operation after becoming the first ABWR (Advanced Boiling Water Reactor) to satisfy the new regulatory standards. The unit resumed power transmission on February 16, 2026, and commercial operation on April 16.<\/p>\n<p data-start=\"848\" data-end=\"1151\">As a result, the number of restarted nuclear reactors in Japan reached 15 units with a combined capacity of 14.6 GW. These include Onagawa-2, Kashiwazaki Kariwa-6, Mihama -3, Takahama Units 1-4, Ohi Units 3-4, Shimane-2, Ikata-3, Genkai Units 3-4, and Sendai Units 1-2.<\/p>\n<p data-start=\"1153\" data-end=\"1327\">Including reactors that have not yet restarted, Japan\u2019s nuclear fleet remained unchanged from the previous fiscal year at 33 units with a total capacity of 33.1 GW.<\/p>\n<p data-start=\"1329\" data-end=\"1693\">Among Japan\u2019s long-term operating reactors, Takahama-2 reached 50 years of operation on November 14, 2025, becoming the second reactor in Japan \u2014 after Takahama-1 \u2014 to operate beyond 50 years. Sendai-2 also entered operation beyond 40 years in November 2025. As a result, the number of restarted reactors operating beyond 40 years reached six units.<\/p>\n<p data-start=\"1695\" data-end=\"1845\">In addition, new regulations on aging management for nuclear power plants under the GX Decarbonized Power Source Act came into effect on June 6, 2025.<\/p>\n<p data-start=\"1847\" data-end=\"2126\">The highest capacity factor in FY2025 was recorded at Ohi-4, which achieved 95.0%. Mihama-3 followed at 88.8%, while Shimane-2 recorded 87.9%. Excluding Kashiwazaki Kariwa-6, all operating nuclear power plants in Japan achieved capacity factors exceeding 70%.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Both figures marked the highest levels recorded since FY2015, when Japan\u2019s new regulatory standards came into effect following the Fukushima Daiichi accident. In FY2025, TEPCO\u2019s Kashiwazaki Kariwa-6 resumed operation after becoming the first ABWR (Advanced Boiling Water Reactor) to satisfy the new regulatory standards. The unit resumed power transmission on February 16, 2026, and commercial [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":7745,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[6],"tags":[376,601,1492,1488,1490,692,1493,1484,43,1296,44,741,1491,690,1442,317,1489,154,17,23],"class_list":["post-7842","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-npps","tag-abwr","tag-capacity-factor","tag-electricity-generation","tag-fy2025","tag-gx-decarbonized-power-source-act","tag-japan","tag-japan-nuclear-industry","tag-kansai-electric-power","tag-kashiwazaki-kariwa","tag-long-term-operation","tag-mihama","tag-nuclear-energy","tag-nuclear-fleet","tag-nuclear-power","tag-nuclear-regulation","tag-ohi","tag-reactor-restart","tag-shimane","tag-takahama","tag-tepco"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.4 - aioseo.com -->\n\t<meta name=\"description\" content=\"Both figures marked the highest levels recorded since FY2015, when Japan\u2019s new regulatory standards came into effect following the Fukushima Daiichi accident. In FY2025, TEPCO\u2019s Kashiwazaki Kariwa-6 resumed operation after becoming the first ABWR (Advanced Boiling Water Reactor) to satisfy the new regulatory standards. The unit resumed power transmission on February 16, 2026, and commercial\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Kaoru Ohno\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.jaif.or.jp\/en\/news\/npps\/7842\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.4\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Japan\u2019s Nuclear Capacity Factor Reaches 33.6% in FY2025 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:description\" content=\"Both figures marked the highest levels recorded since FY2015, when Japan\u2019s new regulatory standards came into effect following the Fukushima Daiichi accident. In FY2025, TEPCO\u2019s Kashiwazaki Kariwa-6 resumed operation after becoming the first ABWR (Advanced Boiling Water Reactor) to satisfy the new regulatory standards. The unit resumed power transmission on February 16, 2026, and commercial\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.jaif.or.jp\/en\/news\/npps\/7842\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2026\/01\/G_L37WGWcAA-2ZO.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2026\/01\/G_L37WGWcAA-2ZO.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1500\" \/>\n\t\t<meta property=\"og:image:height\" content=\"1000\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-05-12T06:37:09+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-05-12T06:59:55+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@Atoms_in_Japan\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Japan\u2019s Nuclear Capacity Factor Reaches 33.6% in FY2025 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Both figures marked the highest levels recorded since FY2015, when Japan\u2019s new regulatory standards came into effect following the Fukushima Daiichi accident. In FY2025, TEPCO\u2019s Kashiwazaki Kariwa-6 resumed operation after becoming the first ABWR (Advanced Boiling Water Reactor) to satisfy the new regulatory standards. The unit resumed power transmission on February 16, 2026, and commercial\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2026\/01\/G_L37WGWcAA-2ZO.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps\\\/7842#blogposting\",\"name\":\"Japan\\u2019s Nuclear Capacity Factor Reaches 33.6% in FY2025 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"headline\":\"Japan\\u2019s Nuclear Capacity Factor Reaches 33.6% in FY2025\",\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/wp-content\\\/uploads\\\/2026\\\/01\\\/G_L37WGWcAA-2ZO.jpg\",\"width\":1500,\"height\":1000,\"caption\":\"@TEPCO\"},\"datePublished\":\"2026-05-12T15:37:09+09:00\",\"dateModified\":\"2026-05-12T15:59:55+09:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps\\\/7842#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps\\\/7842#webpage\"},\"articleSection\":\"NPPs, ABWR, Capacity Factor, electricity generation, FY2025, GX Decarbonized Power Source Act, Japan, Japan nuclear industry, Kansai Electric Power, Kashiwazaki Kariwa, long term operation, Mihama, nuclear energy, nuclear fleet, nuclear power, nuclear regulation, Ohi, reactor restart, Shimane, Takahama, TEPCO\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps\\\/7842#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"position\":2,\"name\":\"News\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"position\":3,\"name\":\"NPPs\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps\\\/7842#listItem\",\"name\":\"Japan\\u2019s Nuclear Capacity Factor Reaches 33.6% in FY2025\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps\\\/7842#listItem\",\"position\":4,\"name\":\"Japan\\u2019s Nuclear Capacity Factor Reaches 33.6% in FY2025\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno\",\"name\":\"Kaoru Ohno\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps\\\/7842#webpage\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps\\\/7842\",\"name\":\"Japan\\u2019s Nuclear Capacity Factor Reaches 33.6% in FY2025 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"description\":\"Both figures marked the highest levels recorded since FY2015, when Japan\\u2019s new regulatory standards came into effect following the Fukushima Daiichi accident. In FY2025, TEPCO\\u2019s Kashiwazaki Kariwa-6 resumed operation after becoming the first ABWR (Advanced Boiling Water Reactor) to satisfy the new regulatory standards. The unit resumed power transmission on February 16, 2026, and commercial\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps\\\/7842#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/wp-content\\\/uploads\\\/2026\\\/01\\\/G_L37WGWcAA-2ZO.jpg\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps\\\/7842\\\/#mainImage\",\"width\":1500,\"height\":1000,\"caption\":\"@TEPCO\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps\\\/7842#mainImage\"},\"datePublished\":\"2026-05-12T15:37:09+09:00\",\"dateModified\":\"2026-05-12T15:59:55+09:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Japan\u2019s Nuclear Capacity Factor Reaches 33.6% in FY2025 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"Both figures marked the highest levels recorded since FY2015, when Japan\u2019s new regulatory standards came into effect following the Fukushima Daiichi accident. In FY2025, TEPCO\u2019s Kashiwazaki Kariwa-6 resumed operation after becoming the first ABWR (Advanced Boiling Water Reactor) to satisfy the new regulatory standards. The unit resumed power transmission on February 16, 2026, and commercial","canonical_url":"https:\/\/www.jaif.or.jp\/en\/news\/npps\/7842","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps\/7842#blogposting","name":"Japan\u2019s Nuclear Capacity Factor Reaches 33.6% in FY2025 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","headline":"Japan\u2019s Nuclear Capacity Factor Reaches 33.6% in FY2025","author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2026\/01\/G_L37WGWcAA-2ZO.jpg","width":1500,"height":1000,"caption":"@TEPCO"},"datePublished":"2026-05-12T15:37:09+09:00","dateModified":"2026-05-12T15:59:55+09:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps\/7842#webpage"},"isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps\/7842#webpage"},"articleSection":"NPPs, ABWR, Capacity Factor, electricity generation, FY2025, GX Decarbonized Power Source Act, Japan, Japan nuclear industry, Kansai Electric Power, Kashiwazaki Kariwa, long term operation, Mihama, nuclear energy, nuclear fleet, nuclear power, nuclear regulation, Ohi, reactor restart, Shimane, Takahama, TEPCO"},{"@type":"BreadcrumbList","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps\/7842#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.jaif.or.jp\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","position":2,"name":"News","item":"https:\/\/www.jaif.or.jp\/en\/news","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","position":3,"name":"NPPs","item":"https:\/\/www.jaif.or.jp\/en\/news\/npps","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps\/7842#listItem","name":"Japan\u2019s Nuclear Capacity Factor Reaches 33.6% in FY2025"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps\/7842#listItem","position":4,"name":"Japan\u2019s Nuclear Capacity Factor Reaches 33.6% in FY2025","previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"}}]},{"@type":"Organization","@id":"https:\/\/www.jaif.or.jp\/en\/#organization","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","url":"https:\/\/www.jaif.or.jp\/en\/"},{"@type":"Person","@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author","url":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno","name":"Kaoru Ohno"},{"@type":"WebPage","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps\/7842#webpage","url":"https:\/\/www.jaif.or.jp\/en\/news\/npps\/7842","name":"Japan\u2019s Nuclear Capacity Factor Reaches 33.6% in FY2025 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"Both figures marked the highest levels recorded since FY2015, when Japan\u2019s new regulatory standards came into effect following the Fukushima Daiichi accident. In FY2025, TEPCO\u2019s Kashiwazaki Kariwa-6 resumed operation after becoming the first ABWR (Advanced Boiling Water Reactor) to satisfy the new regulatory standards. The unit resumed power transmission on February 16, 2026, and commercial","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps\/7842#breadcrumblist"},"author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"creator":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2026\/01\/G_L37WGWcAA-2ZO.jpg","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps\/7842\/#mainImage","width":1500,"height":1000,"caption":"@TEPCO"},"primaryImageOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps\/7842#mainImage"},"datePublished":"2026-05-12T15:37:09+09:00","dateModified":"2026-05-12T15:59:55+09:00"},{"@type":"WebSite","@id":"https:\/\/www.jaif.or.jp\/en\/#website","url":"https:\/\/www.jaif.or.jp\/en\/","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:type":"article","og:title":"Japan\u2019s Nuclear Capacity Factor Reaches 33.6% in FY2025 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:description":"Both figures marked the highest levels recorded since FY2015, when Japan\u2019s new regulatory standards came into effect following the Fukushima Daiichi accident. In FY2025, TEPCO\u2019s Kashiwazaki Kariwa-6 resumed operation after becoming the first ABWR (Advanced Boiling Water Reactor) to satisfy the new regulatory standards. The unit resumed power transmission on February 16, 2026, and commercial","og:url":"https:\/\/www.jaif.or.jp\/en\/news\/npps\/7842","og:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2026\/01\/G_L37WGWcAA-2ZO.jpg","og:image:secure_url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2026\/01\/G_L37WGWcAA-2ZO.jpg","og:image:width":1500,"og:image:height":1000,"article:published_time":"2026-05-12T06:37:09+00:00","article:modified_time":"2026-05-12T06:59:55+00:00","twitter:card":"summary_large_image","twitter:site":"@Atoms_in_Japan","twitter:title":"Japan\u2019s Nuclear Capacity Factor Reaches 33.6% in FY2025 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","twitter:description":"Both figures marked the highest levels recorded since FY2015, when Japan\u2019s new regulatory standards came into effect following the Fukushima Daiichi accident. In FY2025, TEPCO\u2019s Kashiwazaki Kariwa-6 resumed operation after becoming the first ABWR (Advanced Boiling Water Reactor) to satisfy the new regulatory standards. The unit resumed power transmission on February 16, 2026, and commercial","twitter:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2026\/01\/G_L37WGWcAA-2ZO.jpg"},"aioseo_meta_data":{"post_id":"7842","title":null,"description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"limit_modified_date":false,"created":"2026-05-12 06:37:10","updated":"2026-10-29 03:02:49","focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\" title=\"News\">News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\/npps\" title=\"NPPs\">NPPs<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tJapan\u2019s Nuclear Capacity Factor Reaches 33.6% in FY2025\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.jaif.or.jp\/en\/"},{"label":"News","link":"https:\/\/www.jaif.or.jp\/en\/news"},{"label":"NPPs","link":"https:\/\/www.jaif.or.jp\/en\/news\/npps"},{"label":"Japan\u2019s Nuclear Capacity Factor Reaches 33.6% in FY2025","link":"https:\/\/www.jaif.or.jp\/en\/news\/npps\/7842"}],"_links":{"self":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/7842","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/comments?post=7842"}],"version-history":[{"count":1,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/7842\/revisions"}],"predecessor-version":[{"id":7843,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/7842\/revisions\/7843"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media\/7745"}],"wp:attachment":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media?parent=7842"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/categories?post=7842"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/tags?post=7842"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}