{"id":833,"date":"2015-03-20T04:43:26","date_gmt":"2015-03-20T04:43:26","guid":{"rendered":"http:\/\/www.jaif.or.jp\/en\/?p=833"},"modified":"2015-03-25T08:39:28","modified_gmt":"2015-03-25T08:39:28","slug":"nra-approves-detailed-modified-design-of-sendai-1","status":"publish","type":"post","link":"https:\/\/www.jaif.or.jp\/en\/news\/833","title":{"rendered":"NRA Approves Detailed Modified Design of Sendai-1"},"content":{"rendered":"<p>Two years ago, on July 8, 2013, and immediately after new regulatory standards came into effect, the power company initially filed its applications with the NRA for three related items: (a) permission to change reactor installations, (b) approval of the construction plan for the Sendai-1 and -2 NPPs, and (c) approval of changes to operational safety programs for the two units.<\/p>\n<p>The NRA designated both units as priority NPPs, after which it carried out the required examinations. It finally approved the applications for permission to change reactor installations (basic design) in September 2014.<\/p>\n<p>The construction plans, as required under the new regulatory standards, contain descriptions of such equipment as pumps, available power sources and numbers of units, as part of measures to respond to severe accidents. The NRA and Kyushu Electric Power had been working on partial revisions and adjustments to the descriptions.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Two years ago, on July 8, 2013, and immediately after new regulatory standards came into effect, the power company initially filed its applications with the NRA for three related items: (a) permission to change reactor installations, (b) approval of the construction plan for the Sendai-1 and -2 NPPs, and (c) approval of changes to operational [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":834,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1,6,7],"tags":[264,37,19,263,265,36,271],"class_list":["post-833","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-npps","category-regulation-safety","tag-approval","tag-kyushu","tag-nra","tag-permission","tag-regulatory-standard","tag-sendai","tag-sendai-1"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.4 - aioseo.com -->\n\t<meta name=\"description\" content=\"Two years ago, on July 8, 2013, and immediately after new regulatory standards came into effect, the power company initially filed its applications with the NRA for three related items: (a) permission to change reactor installations, (b) approval of the construction plan for the Sendai-1 and -2 NPPs, and (c) approval of changes to operational\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Kaoru Ohno\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.jaif.or.jp\/en\/news\/833\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.4\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"NRA Approves Detailed Modified Design of Sendai-1 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta property=\"og:description\" content=\"Two years ago, on July 8, 2013, and immediately after new regulatory standards came into effect, the power company initially filed its applications with the NRA for three related items: (a) permission to change reactor installations, (b) approval of the construction plan for the Sendai-1 and -2 NPPs, and (c) approval of changes to operational\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.jaif.or.jp\/en\/news\/833\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/03\/\u5ddd\u5185\u5916\u89b3\u5199\u771f\uff13\uff08\u6700\u65b0\uff09-e1426826537552.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/03\/\u5ddd\u5185\u5916\u89b3\u5199\u771f\uff13\uff08\u6700\u65b0\uff09-e1426826537552.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"310\" \/>\n\t\t<meta property=\"og:image:height\" content=\"205\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2015-03-20T04:43:26+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2015-03-25T08:39:28+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@Atoms_in_Japan\" \/>\n\t\t<meta name=\"twitter:title\" content=\"NRA Approves Detailed Modified Design of Sendai-1 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Two years ago, on July 8, 2013, and immediately after new regulatory standards came into effect, the power company initially filed its applications with the NRA for three related items: (a) permission to change reactor installations, (b) approval of the construction plan for the Sendai-1 and -2 NPPs, and (c) approval of changes to operational\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/03\/\u5ddd\u5185\u5916\u89b3\u5199\u771f\uff13\uff08\u6700\u65b0\uff09-e1426826537552.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/833#blogposting\",\"name\":\"NRA Approves Detailed Modified Design of Sendai-1 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"headline\":\"NRA Approves Detailed Modified Design of Sendai-1\",\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/wp-content\\\/uploads\\\/2015\\\/03\\\/\\u5ddd\\u5185\\u5916\\u89b3\\u5199\\u771f\\uff13\\uff08\\u6700\\u65b0\\uff09-e1426826537552.jpg\",\"width\":310,\"height\":205,\"caption\":\"Sendai NPPs\"},\"datePublished\":\"2015-03-20T04:43:26+09:00\",\"dateModified\":\"2015-03-25T08:39:28+09:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/833#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/833#webpage\"},\"articleSection\":\"News, NPPs, Regulation &amp; Safety, approval, Kyushu, NRA, permission, regulatory standard, Sendai, Sendai-1\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/833#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"position\":2,\"name\":\"News\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"position\":3,\"name\":\"NPPs\",\"item\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/833#listItem\",\"name\":\"NRA Approves Detailed Modified Design of Sendai-1\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/833#listItem\",\"position\":4,\"name\":\"NRA Approves Detailed Modified Design of Sendai-1\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/npps#listItem\",\"name\":\"NPPs\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno\",\"name\":\"Kaoru Ohno\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/833#webpage\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/833\",\"name\":\"NRA Approves Detailed Modified Design of Sendai-1 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"description\":\"Two years ago, on July 8, 2013, and immediately after new regulatory standards came into effect, the power company initially filed its applications with the NRA for three related items: (a) permission to change reactor installations, (b) approval of the construction plan for the Sendai-1 and -2 NPPs, and (c) approval of changes to operational\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/833#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/author\\\/kaoru-ohno#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/wp-content\\\/uploads\\\/2015\\\/03\\\/\\u5ddd\\u5185\\u5916\\u89b3\\u5199\\u771f\\uff13\\uff08\\u6700\\u65b0\\uff09-e1426826537552.jpg\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/833\\\/#mainImage\",\"width\":310,\"height\":205,\"caption\":\"Sendai NPPs\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/news\\\/833#mainImage\"},\"datePublished\":\"2015-03-20T04:43:26+09:00\",\"dateModified\":\"2015-03-25T08:39:28+09:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/\",\"name\":\"JAPAN ATOMIC INDUSTRIAL FORUM, INC.\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.jaif.or.jp\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"NRA Approves Detailed Modified Design of Sendai-1 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"Two years ago, on July 8, 2013, and immediately after new regulatory standards came into effect, the power company initially filed its applications with the NRA for three related items: (a) permission to change reactor installations, (b) approval of the construction plan for the Sendai-1 and -2 NPPs, and (c) approval of changes to operational","canonical_url":"https:\/\/www.jaif.or.jp\/en\/news\/833","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.jaif.or.jp\/en\/news\/833#blogposting","name":"NRA Approves Detailed Modified Design of Sendai-1 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","headline":"NRA Approves Detailed Modified Design of Sendai-1","author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/03\/\u5ddd\u5185\u5916\u89b3\u5199\u771f\uff13\uff08\u6700\u65b0\uff09-e1426826537552.jpg","width":310,"height":205,"caption":"Sendai NPPs"},"datePublished":"2015-03-20T04:43:26+09:00","dateModified":"2015-03-25T08:39:28+09:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/833#webpage"},"isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/833#webpage"},"articleSection":"News, NPPs, Regulation &amp; Safety, approval, Kyushu, NRA, permission, regulatory standard, Sendai, Sendai-1"},{"@type":"BreadcrumbList","@id":"https:\/\/www.jaif.or.jp\/en\/news\/833#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.jaif.or.jp\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","position":2,"name":"News","item":"https:\/\/www.jaif.or.jp\/en\/news","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","position":3,"name":"NPPs","item":"https:\/\/www.jaif.or.jp\/en\/news\/npps","nextItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/833#listItem","name":"NRA Approves Detailed Modified Design of Sendai-1"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/833#listItem","position":4,"name":"NRA Approves Detailed Modified Design of Sendai-1","previousItem":{"@type":"ListItem","@id":"https:\/\/www.jaif.or.jp\/en\/news\/npps#listItem","name":"NPPs"}}]},{"@type":"Organization","@id":"https:\/\/www.jaif.or.jp\/en\/#organization","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","url":"https:\/\/www.jaif.or.jp\/en\/"},{"@type":"Person","@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author","url":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno","name":"Kaoru Ohno"},{"@type":"WebPage","@id":"https:\/\/www.jaif.or.jp\/en\/news\/833#webpage","url":"https:\/\/www.jaif.or.jp\/en\/news\/833","name":"NRA Approves Detailed Modified Design of Sendai-1 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","description":"Two years ago, on July 8, 2013, and immediately after new regulatory standards came into effect, the power company initially filed its applications with the NRA for three related items: (a) permission to change reactor installations, (b) approval of the construction plan for the Sendai-1 and -2 NPPs, and (c) approval of changes to operational","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.jaif.or.jp\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/833#breadcrumblist"},"author":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"creator":{"@id":"https:\/\/www.jaif.or.jp\/en\/author\/kaoru-ohno#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/03\/\u5ddd\u5185\u5916\u89b3\u5199\u771f\uff13\uff08\u6700\u65b0\uff09-e1426826537552.jpg","@id":"https:\/\/www.jaif.or.jp\/en\/news\/833\/#mainImage","width":310,"height":205,"caption":"Sendai NPPs"},"primaryImageOfPage":{"@id":"https:\/\/www.jaif.or.jp\/en\/news\/833#mainImage"},"datePublished":"2015-03-20T04:43:26+09:00","dateModified":"2015-03-25T08:39:28+09:00"},{"@type":"WebSite","@id":"https:\/\/www.jaif.or.jp\/en\/#website","url":"https:\/\/www.jaif.or.jp\/en\/","name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.jaif.or.jp\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:type":"article","og:title":"NRA Approves Detailed Modified Design of Sendai-1 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","og:description":"Two years ago, on July 8, 2013, and immediately after new regulatory standards came into effect, the power company initially filed its applications with the NRA for three related items: (a) permission to change reactor installations, (b) approval of the construction plan for the Sendai-1 and -2 NPPs, and (c) approval of changes to operational","og:url":"https:\/\/www.jaif.or.jp\/en\/news\/833","og:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/03\/\u5ddd\u5185\u5916\u89b3\u5199\u771f\uff13\uff08\u6700\u65b0\uff09-e1426826537552.jpg","og:image:secure_url":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/03\/\u5ddd\u5185\u5916\u89b3\u5199\u771f\uff13\uff08\u6700\u65b0\uff09-e1426826537552.jpg","og:image:width":310,"og:image:height":205,"article:published_time":"2015-03-20T04:43:26+00:00","article:modified_time":"2015-03-25T08:39:28+00:00","twitter:card":"summary_large_image","twitter:site":"@Atoms_in_Japan","twitter:title":"NRA Approves Detailed Modified Design of Sendai-1 - JAPAN ATOMIC INDUSTRIAL FORUM, INC.","twitter:description":"Two years ago, on July 8, 2013, and immediately after new regulatory standards came into effect, the power company initially filed its applications with the NRA for three related items: (a) permission to change reactor installations, (b) approval of the construction plan for the Sendai-1 and -2 NPPs, and (c) approval of changes to operational","twitter:image":"https:\/\/www.jaif.or.jp\/en\/wp-content\/uploads\/2015\/03\/\u5ddd\u5185\u5916\u89b3\u5199\u771f\uff13\uff08\u6700\u65b0\uff09-e1426826537552.jpg"},"aioseo_meta_data":{"post_id":"833","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"limit_modified_date":false,"created":"2022-04-29 13:16:16","updated":"2026-10-28 23:54:01","focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\" title=\"News\">News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.jaif.or.jp\/en\/news\/npps\" title=\"NPPs\">NPPs<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tNRA Approves Detailed Modified Design of Sendai-1\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.jaif.or.jp\/en\/"},{"label":"News","link":"https:\/\/www.jaif.or.jp\/en\/news"},{"label":"NPPs","link":"https:\/\/www.jaif.or.jp\/en\/news\/npps"},{"label":"NRA Approves Detailed Modified Design of Sendai-1","link":"https:\/\/www.jaif.or.jp\/en\/news\/833"}],"_links":{"self":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/833","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/comments?post=833"}],"version-history":[{"count":1,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/833\/revisions"}],"predecessor-version":[{"id":835,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/posts\/833\/revisions\/835"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media\/834"}],"wp:attachment":[{"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/media?parent=833"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/categories?post=833"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.jaif.or.jp\/en\/wp-json\/wp\/v2\/tags?post=833"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}