JAPAN ATOMIC INDUSTRIAL FORUM, INC.

for Japanese

Fukushima

State of Reconstruction of Fukushima Prefecture

Evacuations
-Evacuees within the prefecture: 10,054
-outside the prefecture: 33,147
-current addresses unknown: 13
Total: 43,214
(Source: Fukushima Prefecture, as of December 5, 2018)
Joban Expressway
Entire length opened
(Source: NEXCO East Japan, as of March 1, 2015)
Unusable Sections of JR Joban Line
Tomioka Sta. – Namie Sta. (substitute bus)
(Source: East Japan Railway Co., as of November 6, 2017)


fukushima_map

Evacuation areas on the map are based on the website of the Ministry of Economy, Trade and Industry (METI).

Related News

SNS facebooktwitter

NPPs Map

Video

Fukushima Hydrogen Energy Research Field (FH2R)

9 August, 2018
Fukushima Hydrogen Energy Research Field (FH2R)01:38

Recent News

13 December, 2018
Decommissioning FBR Monju: Processing of Fuel Assemblies Is Underway
13 December, 2018
ANRE Nuclear Energy Subcommittee Resumes Deliberations toward Resolving Issues Based on Fifth Strategic Energy Plan
12 December, 2018
ANRE’s Working Group Produces Strategic Road Map for Fast Reactor Development
12 December, 2018
JAIF’s Nuclear Industry Survey: Difficult to Reach a Nuclear Power Share of 20-22% by 2030
12 December, 2018
Fukushima Governor to Visit Hong Kong in January to Dispel Fears and Misinformation
22 November, 2018
Taylor Wilson Boosts SMRs at JAEA Annual Report Conference 2018
19 November, 2018
Shimane NPP Proceeding Steadily on Safety Measures toward Restart
19 November, 2018
Tokyo City University’s Science Café Features Hands-on Nuclear Exhibition of Robots
16 November, 2018
NRA Allows Tokai-2 to Be Operated for Sixty Years, a First for a BWR
7 November, 2018
National Nuclear Convention Held, Aiming to Reflect the Voices of Siting Areas
▲TOP