JAPAN ATOMIC INDUSTRIAL FORUM, INC.

for Japanese
“The current situation at Fukushima Daiichi NPS” -From 3.11 toward the future- (ver, Jan. 2018)
15 January, 2018
“The current situation at Fukushima Daiichi NPS” -From 3.11 toward the future- (ver, Jan. 2018)
08:23
Produced by Tokyo Electric Power Company Holdings, Inc. TEPCO's official movie show you the latest situation of Fukushima Daiic...
A New Chapter Begins.
1 September, 2017
A New Chapter Begins.
04:55
Yet even as we think, the world is moving ahead. It's time for another step. Let us do our thinking as we walk and as we run. ...
Bridging the Past and Present Toward the Future
11 April, 2017
Bridging the Past and Present Toward the Future
05:07
Opening movie at the 50th JAIF Annual Conference in Tokyo...
An unprecedented challenge: Developing the “Scorpion-shaped robot”
16 February, 2017
An unprecedented challenge: Developing the “Scorpion-shaped robot”
02:59
Produced by Tokyo Electric Power Company Holdings, Inc. In a collaborative effort, TEPCO, Toshiba, and IRID developed a “Scorpi...
Fukushima Today
24 January, 2017
Fukushima Today
01:30
Produced by Japan's Ministry of Economy, Trade and Industry (METI). Japan's Fukushima Prefecture has been making tremendous pro...
JAIF President’s Message at 2017 UC Pacific Rim Forum
23 January, 2017
JAIF President’s Message at 2017 UC Pacific Rim Forum
07:01
...
Fukushima Today -for a bright future-
25 September, 2016
Fukushima Today -for a bright future-
04:53
Produced by Japan’s Ministry of Economy, Trade and Industry (METI). There is still a lot of remaining work for complete Fukushi...
Dismantling of Unit 1 cover panels for spent fuel removal at Fukushima Daiichi Nuclear Power Station
24 August, 2016
Dismantling of Unit 1 cover panels for spent fuel removal at Fukushima Daiichi Nuclear Power Station
03:51
Produced by Tokyo Electric Power Company Holdings, Inc. TEPCO's official movie shows various measures against dust dispersion d...
Preventing Recriticality in Fuel Debris at Fukushima Daiichi Nuclear Power Station
13 July, 2016
Preventing Recriticality in Fuel Debris at Fukushima Daiichi Nuclear Power Station
04:58
Produced by Tokyo Electric Power Company Holdings, Inc. TEPCO's official movie explains the conditions of the fuel retained in ...
Completion of the Landside Impermeable Wall
30 May, 2016
Completion of the Landside Impermeable Wall
01:24
Produced by Tokyo Electric Power Company Holdings, Inc. Landside Impermeable Wall, or "frozen wall," completed its construction...
Fukushima Today -Towards new horizons-
2 March, 2016
Fukushima Today -Towards new horizons-
11:43
Produced by Japan's Ministry of Economy, Trade and Industry (METI). In this movie, "Fukushima Today" is presented from a variet...
“The current situation at Fukushima Daiichi NPS” –From 3.11 toward the future-
11 January, 2016
“The current situation at Fukushima Daiichi NPS” –From 3.11 toward the future-
08:24
Produced by Tokyo Electric Power Company Holdings, Inc. TEPCO's official movie show you the latest situation of Fukushima Daiic...
JAIF President’s Address in London
25 September, 2015
JAIF President’s Address in London
07:32
Video Address at the WNA Symposium 2015 in London...
Fukushima Daiichi Now Vol.2
30 March, 2015
Fukushima Daiichi Now Vol.2
08:48
Fukushima Daiichi now serves as an advanced experimental field in which many companies are applying state-of-the-art technologies ...
Fukushima Daiichi Now Vol.1
28 March, 2015
Fukushima Daiichi Now Vol.1
11:51
We dispatched our reporters to look at the working situation within the Fukushima Daiichi premises, zeroing in on the spirit of th...
SNS facebooktwitter

NPPs Map

Video

“The current situation at Fukushima Daiichi NPS” -From 3.11 toward the future- (ver, Jan. 2018)

15 January, 2018
“The current situation at Fukushima Daiichi NPS” -From 3.11 toward the future- (ver, Jan. 2018)08:23

Recent News

15 January, 2018
ANRE Head Meets Niigata Governor on Kashiwazaki Kariwa, Delivers Document from METI Minister
11 January, 2018
JAIF Chairman Imai Calls Upon Domestic Nuclear Industry to Strengthen Cooperation Through Concerted Efforts
5 January, 2018
Toshiba ESS, IRID Develop Device to Investigate Interior of Primary Containment Vessel at Fukushima Daiichi-2 NPP
27 December, 2017
Kashiwazaki Kariwa 6 & 7 Clear Safety Examinations, First BWRs
21 December, 2017
16 Teams Compete in Second Hairo Sozo Robot Contest in Naraha Town
12 December, 2017
JAEA Officially Classifies Monju Fast Reactor as “Closed Down”
12 December, 2017
Seven-point Contraction in Nuclear Share of Energy Mix Would Push Real GDP Down by 2.5 to 2.7 Trillion Yen
28 November, 2017
Fukui Governor Agrees to Restart Ohi-3 and Ohi-4 NPPs, with Local Procedures Complete
28 November, 2017
JAPC Files Application for Permission to Extend Lifetime of Tokai-2 NPP to 60 Years
13 November, 2017
EU to Lift Restrictions on Imports of Fukushima Products in December
▲TOP